Download presentation
Presentation is loading. Please wait.
Published byKatherine Wade Modified over 9 years ago
1
MyOcean2 First Annual Meeting – 17-18 April 2013 WP 09 MONITORING & FORECASTING CENTRE for IBI MyOcean2 First Annual Meeting – Cork /16-17 April 2013
2
Work Package Main Objectives MyOcean2 First Annual Meeting – 17-18 April 2013 To ensure and improve the reliable and accurate provision of a regional ocean forecast service on the IBI region To ensure management of service and products, update on new IBI products (i.e. Re-analysis) To provide a back-up capability: A nominal system IBI-NOM operated by Puertos del Estado A Back-up system IBI-BUP, operated by Mercator. The system will include modeling improvements and advances derived from R&D when demonstrated. A robust Tier 1 R&D activity is planned in order to address specific demands of improvement in the operational system To contribute to enhance IBI users community 1/14
3
Partnership Interface with Exec, Board, PMO, external representation, Cross-cutting Activ. Coordination Daily operations & Service Interface with ServiceDesk, CIS, TACs & MFCs, Crosscutting WPs… Operations & Service Oriented short-term R&D to improve IBI system & Service Develop IBI-Vn+1, n+2… Product Quality (WP17) R&D MyOcean2 First Annual Meeting – 17-18 April 2013 4 partners: PdE, CLS, CNRS & Mercator 2/14
4
System & Production Evolution MyOcean2 First Annual Meeting – 17-18 April 2013 n Objectives for V3 were n Make evolve IBI numerical solution n Upgrade IBI operational suites in Production Lines n Enhance Back-Up Services (exchange between PCs) n Improve CAL/VAL capabilities 3/14
5
System & Production Evolution MyOcean2 First Annual Meeting – 17-18 April 2013 n Main achievements for V3 are n IBI-V3 solution includes improved river discharge data n A more robust & efficient operational suite: Some sources of IBI incidents minimized with incorporation of some extra QC procedures n Noticeable upgrade of IBI-MFC Validation capabilities: Launch of NARVAL (north Atlantic Regional VALidation) Tool 4/14
6
System & Production Evolution MyOcean2 First Annual Meeting – 17-18 April 2013 n Main difficulties encountered n Changes in computational environment in both Production lines: Significant changes in Production hardware environments both in NOM (PdE-CESGA for V3) & BUP (MO-MF for V4) Open issue: Risk for operational V3 & V4 services ? 5/14
7
System & Production Evolution MyOcean2 First Annual Meeting – 17-18 April 2013 n Main difficulties encountered: Back up issue CIS DU (PdE) PU (PdE) DU (CLS) PU (Mercator) USERS IBI-NOMIBI-BUP If IBI-NOM pb 1st senario 6/14
8
System & Production Evolution MyOcean2 First Annual Meeting – 17-18 April 2013 n Results from Test of internal BUP production services: Slightly difference in final products format (i.e. netcdf file format) has an unexpected impact on the download of mixed IBI (NOM & BUP production origin) data through subsetter service (PdE MisGW)... OK FOR HOURLY PRODUCTS NOK FOR DAILY PRODUCTS n Main difficulties encountered 7/14
9
Improvements, results, illustrations MyOcean2 First Annual Meeting – 17-18 April 2013 River runoffs of Adour (on the left) and Garonne (on the right). Red line: monthly climatology runoffs used in IBI-V1, blue line daily runoffs used in IBI-V2 and green line daily runoffs which take into account tributaries and used in IBI-V3. n IBI solution upgrades: IBI-V3 will have a more realistic inputs for river discharge runoff data used. (More details on QuID) IBI River inputs locations. In green: daily runoffs hindcasts from E-HYPE model (SMHI) In red: daily runoffs obs data from PREVIMER (FCs from E-HYPE only ) 8/14
10
IBI CAL/VAL improvements n IBI Improved CalVal capabilities n Noticeable upgrade of the IBI-MFC Validation capabilities: Launch of NARVAL Tool (On-line & Delayed Mode) MyOcean2 V3 Acceptance & V4 Product Design Workshops – Madrid 28,29th January 2013 Validation of daily IBI FC cycle. Statistics covering longer periods (monthly, seasonal and annual reviews) MyO Quarterly Validation Reports 9/14
11
Spanish Marine GMES User group END USERS Oceanographic institutions MyOcean Conceptual organization Kick-off Meeting Spanish Marine GMES UG (Madrid, Oct 18 th 2012) Kick-off Meeting Iberian MyO IBI-MFC Users (Madrid, Nov 13 th 2012) To enhance the downstream service 10/14
12
The Spanish IBI User Group: Institutions… 13 Groups articulates (by now) the Spanish Users Network: 11 Intermediate/end user. 2 Institutions related to MyO MCS. Number of people implicated: 25 technical contacts (already members of the mailing list) 23 attendees to the Spanish IBI User Group Kick-off Meeting 11/14
13
First period summary and next steps MyOcean2 First Annual Meeting – 17-18 April 2013 Service and user outreach Enhance user feedback (i.e. bug detection in current IBI products, new taylored user-oriented products) 12/14 Objectives for V3 accomplished Amelioration axis: Operational aspects: Reduction of execution times associated to model and computer changes Increase Robustness, preventing new risks identified before V4 Complete the full B.U. solution R&D aspects Improvement of engineering procedures to validate and include R&D tier 1 developments Complete IBI R&D plan as established in PMP
14
First period summary and next steps MyOcean2 First Annual Meeting – 17-18 April 2013 Evolutions scheduled for V4 Model improvementDelivery Improvement of operational suite: decrease CPU time, increase robustness V3 and V4 River input improvementV3 Solving the BU issueDuring V3 (RFC when OK) Possible new Heat flux formulation V4 Nudging for spin-upV4 Change of model version from 2.3 to 3.4 V4 Wave forcings (SBC: wave roughness &TKE; Stokes- Coriolis term) V4 Data assimilationECOMF… V4 R&D works mainly focus on improve IBI NEMO solution New IBI V4 Products: IBI RE-ANALYSIS PHY BGC Main DEV: PdE Main DEV: MO 13/14
15
First period summary and next steps MyOcean2 First Annual Meeting – 17-18 April 2013 THANK YOU! 14/14
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.