Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.

Similar presentations


Presentation on theme: "Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps."— Presentation transcript:

1 Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

2 What is Teamcenter?  Teamcenter is a commercial Product Lifecycle Management (PLM) software owned by Siemens  PLM is the process of managing the entire lifecycle of a product from its conception, through design and manufacture, to service and disposal  Teamcenter is used by  more than 6,400 customers across about 9,900 operations with 5 million licensed seats.  DESY for the XFEL project (TC Enterprise), and also at Jefferson Lab (TC Unified) Who will Teamcenter affect?  Scientists, engineers, designers, technicians, machinists, QC, ES&H & procurement personnel  Mechanical, electrical, and civil disciplines Goals  Common access point for engineering related documents – one Engineering Database Management System (EDMS)  Easily find engineering information, engineering reports, analysis on previous designs…  Enhance Collaboration between internal groups and external Labs, Universities, others…  Lab wide workflow processes for reviews and signoffs

3 Benefits Facilitates Collaboration  Can handle SolidWorks files  Project X – PXIE LBNL ANL JLAB  IIFC  Existing India CAD Models  Benefit  Allows us to collaborate with other labs on common projects

4 Benefits Visualization  New Functionality at Lab  View, Measure and Markup  Benefit  Allow for easier project collaboration and better understanding of issues

5 Benefits Provides High Quality Imaging  This helps increase communication and understanding prior to manufacturing  Examples  650 Mhz Cavity  IB3 Proposed improvements Only Computer Images

6 Benefits Reuse  Benefit - Having a repository of “Common Items” (flanges, bolts, etc.) allows significant amount of use. Flanges Cap Screws Structural Components

7 Status Current Status Phase 1 –  Went live January 20, 2012  Currently ~4 users per day (~20 users per day at peak) logged in to production  More than 17,000 Common Items created  More than 650 Models/Drawings created to date  Crystal Collimator completion April 2012

8 Status DesignItems  Current Status  Total Items created in Production > 650 since January 20th First Pilot Project Examples

9 Status Phase 1  New Projects using NX and Teamcenter  Technical Division SC Magnets - 11 Tesla Magnet SRF - Research Test Cryostat LBNE – Trim Dipole Assembly  Particle Physics Division SCDMS - Adsorber Mounting Vessel LBNE – LArk 6 Kton Detector Beamline - LBAR Timing Detector  Accelerator Division Crystal Collimator PXIE – Facilities Phase 2  Portfolio Management Team (PMT)  Approved implementation of Teamcenter – Phase 2  Detailed planning in progress

10 Next Steps Short Term  Fix Production “Work Arounds” identified by Pilot Team  Migration of Mechanical Ideas CAD Data to NX and Teamcenter 2012 / 2013  On-Boarding for LBNE, Mu2E and Project X  Create Remaining Item Types (for Engineering Manual Documents)  FESS Workflow  AutoCAD Integration for FESS and Electrical  Electronic Sign-off  Requirements Management  Change Management  ECAD Integration  Migrate Data (Electrical, FESS, others) Questions and Comments  Thank you


Download ppt "Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps."