Software Development *Life-Cycle Phases* Compiled by: Dharya - 1706223 Dharya - 1706223 Daisy - 1706240 Daisy - 1706240
2
Table of Contents S.no. Title 1Life Cycle Introduction 2Software Development Process 3Life Cycle Phases and aspects 4Graphical approach to phases 5Inception Phase 6Elaboration Phase 7Construction Phase 8Transition Phase
3
1. Inception Phase 2. Elaboration Phase 3.Construction Phase 4. Transition Phase Engineering and production Stages
4
Software Development Process Well defined separation between research and development activities and production activities Overemphasis on research and development Overemphasis on production
5
Evolution of the Plan, requirement and architecture Risk management and objective measures Evolution of System capabilities Modern Software Development Process Support :
6
Life Cycle Phases : 1.Engineering stage - driven by less predictable but smaller teams doing design and synthesis activities 2.Production Stage - driven by more predictable but larger teams doing construction, test, and deployment activities.
7
LIFE CYCLE ASPECT ENGINEERING STAGE EMPHASIS PRODUCTION STAGE EMPHASIS RISK REDUCTION PRODUCTS ACTIVITIES ASSESSMENT ECONOMICS MANAGEMENT Schedule, Technical Feasibility Architecture Baseline Analysis, Design Planning Demonstration, Inspection, Analysis Resolving diseconomies of scale Planning Cost Product Release Baselines Implementation, Testing Testing Exploiting Economics Of scale Operations
8
Engineering Stage –Inception –Elaboration Production Stage Construction Transition
9
Idea Architecture Beta Releases Products Inception Elaboration Construction Transition Engineering Stage Production Stage
10
Inception Phase : Primary Objectives Establishing the project software scope and boundary conditions Clear Understanding of what should be there or what should not? Demonstrating at least one candidate architecture Estimating the cost and schedule for entire project Estimating potential risks
11
Essential Activities Formulating Scope of the project Synthesizing the architecture Planning and preparing a business case
12
Primary Evaluation Criteria Satisfaction of all stakeholder!! Are requirements understood by critical use cases ?? Are the cost and schedule estimates credible?? Do the depth and breadth of an architecture prototype demonstrate the preceding criteria?? Resource management is there or not ??
13
Elaboration Phase Most Critical Phase!! Executable architecture prototype is built Make a vision Establishing a configuration managed snapshot Base lining a fidelity plan for next phase Cost Vs Time graph must work smoothly
14
Primary Objectives Base lining the architecture as rapidly as practical. Base lining the vision Base lining a high-fidelity plan for the construction phase Demonstrating that the baseline architecture will support the vision at a reasonable cost in reasonable time
15
Essential Activities Elaborating the vision: Understanding use cases that do planning decisions Elaborating the process and infrastructure: evaluation of milestones is done i.e. what percent we have reached?? Elaborating the structure and selected components
16
Primary Evaluation Criteria Is the vision stable?? Is the architecture stable?? Address the major risks that can occur Do all stakeholders agree on current vision
17
Construction Phase During this phase, all remaining components and application features are integrated into the application and all features are thoroughly tested. Newly developed software is integrated when required. Managing resources and controlling operation to optimize costs, schedules and quality is the emphasis of the construction phase which represents production stage.
18
Primary Objectives Minimizing developing cost by optimizing resources Avoid unnecessary scraps and rework Achieving adequate quality as rapidly as possible. Achieving useful versions (alpha,beta, and other tests releases).
19
Essential Activities Resource Management, control and process optimization Assessment of Product releases Complete component development and testing
20
Primary Evaluation Criteria Is this product baseline mature enough to be deployed in the user community? Is this product baseline stable enough to be deployed in the user community? Are the stakeholders ready for the transition to the user community?
21
Transition Phase This phase is entered when a baseline is mature enough to be deployed in the end user domain. This phase includes :: Beta testing to validate the new system Conversion of the operational databases Training of users
22
Primary Objectives Achieving user self-supportability. Achieving stake holders concurrence that deployment baselines are complete and consistent with the evaluation criteria. Achieving Final product baselines as rapidly and cost-effectively
23
Essential Activities Synchronization and integration of current construction increment into consistent deployment baselines. Assessment of deployment baselines against the complete vision Acceptance criteria in the requirement set
24
Evaluation Criteria Is the user satisfied? Are actual resource expenditures versus Planned expenditures acceptable?