Implementation of Darwin – ME Chris Wagner, PE July 26-29, 2010 Kansas City, MO
3
Hawaii Alaska Does SHA Use or Plan to Use MEPDG? N0 -12 YES - 40 2007 Survey
4
Where are we now?
5
State implementation activities Validation Activities Status of DARWin ME Planned Activites for DARWin ME
6
6 Software Capabilities-Import Raw Data Climate: icm files Traffic: AHTD Traffic Monitoring Data
7
7 Software Capabilities-Traffic Data Check
8
8 Software Capabilities-Materials E*
9
9 Software Capabilities- Retrieving Data Very similar tools will be included in DARWin ME
10
Indiana DOT HMA Materials Characterization Dynamic Modulus District - 6 Nom Max Aggregate Size - 3 Binder Type – 3 Binder Characterization 3 Binders DSR data Traffic Data WIM Station Data Analyzed Load Spectra defined by Volume
11
Sensitivity of Inputs for Concrete ParameterRoughnessFaulting Percent Slabs Cracked Permanent Curl/Warp Effective Temperature Difference VS Joint SpacingVS Dowel Bar DiameterMS NS Pavement ThicknessSMSVS Modulus of RuptureSNSVS Modulus of ElasticitySNSVS 20-year/28-day RatioSNSVS Indiana DOT: MEPDG Guide for Designers What to Change for Design?
12
Good Calibration and Implementation Document Montana DOT http://www.mdt.mt.gov/research/projects/pave/pave_model.shtml Major Findings: Preservation Practice Extend Performance Most models adequate for design Re-calibrate unbound materials rutting
13
Continued MEPDG Validation at Auburn University
14
S11– As Built – Fatigue Cracking at Auburn University
15
Continued Validation at Auburn University
16
What about Polymers?
17
Strain Response Looking at Strains Directly at Auburn University
18
Darwin-ME output
19
DARWin ME Sneak Peek
20
DARWin ME — Improvements Redesign GUI using.NET 3.5 framework in C# User configurable screens Agency defined data libraries Input control at the central office Expansion capabilities for new analysis engines Improved display on large or multiple monitors Improved error handling stability and error display Multiple project editing Handicap accessibility options Improved reporting (stability, speed and quality) Utilities for importing previous version files, third party data Multiple language extensibility
21
DARWin ME —Improvements Efficiency Increase software speed Automated thickness optimization Batch mode Sensitivity Functionality SI version Traffic caps Stability Correct reported bugs (Task Force directed) Improve error handling
22
Enterprise Software
24
Material Property Inputs
25
Traffic
26
Error Checking
27
Multiple Project Edit
28
Batch Mode
29
XML File Formats
30
Integrated Reports
31
DARWin ME Development Status Milestones Percent Complete, Date of Completion Kick-Off100% User Requirements Spec & Review/Approval100% Preliminary Design Review100% System Requirement Spec & Review/Approval100% Requirements Tracebility Matrix100% Critical Design Review100% Implementation & Integration Process Audit40%, 7/31/10 Test Readiness Review80%, 6/15/10 Testing Process Audit0%, 9/30/10 Software Alpha Test0%, 8/15/10 Software Beta Test0%, 10/15/10 Acceptance Test0%, 11/30/10 Release0%, 12/31/10
32
DARWin ME planned activities Unveiling Session at 2011 TRB Roll out webinar FHWA web training 2011 FHWA On-site training Traffic Workshops
33
Indiana DOT Experience Road AASHTO 93 Thickness Result MEPDG Thickness Result Estimated Contract Saving ($) Actual Contract Saving ($) Total Savings ($) I-46516”-18’ PCCP14”-18’ PCCP$1,475,000 I-465 Ramps ( )12.5”-18’ PCCP11”-18’ PCCP$112,000 $1,000,000 I-465 Ramps ( 40/Wash. St) 12.5”-18’-PCCP12.5”-18’PCCP$0 I-80(mainline)16”-18’-PCCP14”-18’-PCCP$361,000$775,170 I-80(Ramp)12”-18’-PCCP10.5”-18’-PCCP$520,000 SR 1415”-HMA13.5”-HMA$333,000 $155,440 US 23111”-18-PCCP10”-18’-PCCP$333,000 $0 US 231-Ramp10”-18’-PCCP9.5”-18’-PCCP$28,000 US 23115.5”-HMA13”-HMA$557,000 $0 SR 6216”-HMA13”-HMA$403,000 $420,548 US 23111”-18’-PCCP10”-18’-PCCP$178,000 $04,300,000 Total Estimated Savings = $10 Million Total Estimated Savings = $10 Million
34
Evolution The MEPDG is not perfect…..BUT; The MEPDG provides a reasonable and structured platform for continuous improvement.
36
Utah Department of Transportation Michael Fazio 2010 Research Advisory Committee Meeting Kansas City, Missouri
37
Objectives Process Ideas Implementation Tracking Case Return on the Investments Conclusions 2010 Research Advisory Committee Meeting Kansas City, Missouri
38
Explain UDOT’s performance measures for attending TRB annual meeting 2010 Research Advisory Committee Meeting Kansas City, Missouri
39
Show leaders a return on travel cost investment Maximize return on investment on TRB attendance 2010 Research Advisory Committee Meeting Kansas City, Missouri Performance Measures Objectives
40
2010 Research Advisory Committee Meeting Kansas City, Missouri
41
Attendees Selection Distribution of Information Pre-TRB Meeting Attendance Submitting List of Selected Ideas for Implementation 2010 Research Advisory Committee Meeting Kansas City, Missouri
42
Senior Leadership Presenting Papers TRB Committee Members Critical Initiative Technical Experts Invited to Poster Sessions Based on Travel Budget 2010 Research Advisory Committee Meeting Kansas City, Missouri
43
Must bring back at least two ideas Must be Implementable 2010 Research Advisory Committee Meeting Kansas City, Missouri
44
Presenters Description/Notes Champion/Resources Implementation Plan Schedule Status Accomplishments Cost/Benefit Ratio Savings 2010 Research Advisory Committee Meeting Kansas City, Missouri
45
Present ideas to Senior Leaders Project tracking/status form Provide implementation plan Report implementation progress 2010 Research Advisory Committee Meeting Kansas City, Missouri
48
Show return on the investment Quantifiable Non-quantifiable 2010 Research Advisory Committee Meeting Kansas City, Missouri
49
Cable median barrier SPMT for accelerated bridge construction Real time legal advice for NEPA Automated survey of pavement distress Efficiency in asset management Activity based travel demand model Inclinometer instrumentation for transportation projects Overlay edge rut MMQA data run off the road New tools for safety analysis 2010 Research Advisory Committee Meeting Kansas City, Missouri
50
Idea from TRB meeting Presented to Senior Management for Implementation Installed in area with high accident rate and mortality rate because of median crossing 2010 Research Advisory Committee Meeting Kansas City, Missouri
52
Segment 1 length: 7.51 miles project cost: $1,130,000 service life: 15 years 2002-2004 Cross-over crashes, fatal and serious injury: 17 2005-2007 Cross-over crashes, fatal and serious injury: 2 2010 Research Advisory Committee Meeting Kansas City, Missouri
53
Segment 2 length: 10.2 miles project cost: $1,950,000 service life: 15 years 2002-2004 Cross-over crashes, fatal and serious injury: 18 2005-2007 Cross-over crashes, fatal and serious injury: 2 2010 Research Advisory Committee Meeting Kansas City, Missouri
54
TRB Annual Meeting is infused with new ideas and technology ready for implementation New technologies and ideas presented at TRB can improve DOTs business Attending DOTs personnel can collect ideas TRB meeting attendance performance measures can justify the travel costs 2010 Research Advisory Committee Meeting Kansas City, Missouri