Download presentation
Presentation is loading. Please wait.
1
FLAO Interface Control Document
Presented by A. Riccardi S. Esposito, A. Tozzi, A. Riccardi, R. Biasi, D. Gallieni FLAO system external review, Florence, 30/31 March 2009
2
FLAO system external review, Florence, 30/31 March 2009
ICD structure Described interfaces for and LBT672: Mechanical Optical Cooling Electrical power and signals Network Real time communication SW interfaces in a different document FLAO system external review, Florence, 30/31 March 2009
3
Overview of connections
LBT672: M2 unit in Hub LBT672: Spider-arm cabinet AGW unit FLAO system external review, Florence, 30/31 March 2009
4
Overview of physical connections
Cooling lines (from telescope) I/O signals (diagnostic lines) Power lines (120VAC, UPS assisted, from tel.) Fast comm link (optical) Power lines (208VAC, from telescope) Gbit ethernet (optical fiber) Power lines (48VDC, internal) FLAO system external review, Florence, 30/31 March 2009
5
FLAO system external review, Florence, 30/31 March 2009
structure 264 kg (total AGW: 684 kg) FLAO system external review, Florence, 30/31 March 2009
6
W@LBT: Mechanical interface
3x2 connection screws (4 M8, 2 M10) FLAO system external review, Florence, 30/31 March 2009
7
W@LBT: Mechanical interface
6 connection M10 screws 2 connection M6 screws FLAO system external review, Florence, 30/31 March 2009
8
W@LBT: Cooling interface
FLAO system external review, Florence, 30/31 March 2009
9
LBT672: interface sectioning
M2 unit in Hub Mirror unit:303 kg Hexapod: 149 kg Hub: 253 kg Tot: 708 kg 1 2 4 3 Spider-arm cabinet FLAO system external review, Florence, 30/31 March 2009
10
LBT672: Mechanical interfaces
FLAO system external review, Florence, 30/31 March 2009
11
Electrical/Communication
FLAO system external review, Florence, 30/31 March 2009
12
Electrical/Communication/Cooling
Fiber connector (18 fibers) Power and digital flags connector Fluxmeter connector Hub temperature FLAO system external review, Florence, 30/31 March 2009
13
FLAO system external review, Florence, 30/31 March 2009
End of presentation FLAO system external review, Florence, 30/31 March 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.