Download presentation
Presentation is loading. Please wait.
Published bySherman Dickerson Modified over 9 years ago
1
AC backup solutions for business continuity
2
Secure your business, Stay on!
3
Key notes The goals The goals Cloud service higher network resilience Reduce Cost of Ownership CE+T Value Proposition CE+T Value Proposition Reduced footprint, density of power Simple, User friendly Efficiency and performances No single point of failure Reliability, 99,9999….% Scalability Flexibility in expanding and swapping
6
Simple operation, Scalable structure Clean AC output Compact Footprint “N+1”, “2N” or “A+B” Architecture
7
500VA to 225kVA 1 Ph / 3Ph 120Vac /230Vac 24Vdc - 48Vdc 60Vdc - 110Vdc 220Vdc CE / UL
10
Dynamic Sourcing, Transfer Time = 0 Full Redundancy Wide Input Voltage Range Long backup time easy handling
11
20kVA to 640kVA 3 x 380 to 415Vac 1P-1P / 3P-3P / 3P-1P / 1P-3P CE / UL
13
Central Office Lex Remote site End User Copper pair Up to 10 km +/- 160 V / 60 mA Central Power Module CPM Remote Supply Unit RSU Fiber Optic (STM 1)
15
Low Cost of Ownership Fast and Easy Installation Extended Monitoring Totally Safe
17
Full throttle for a limited period of time Better fuel efficiency Lower carbon footprint
18
The batteries provide the needed DC input. Generator is shut down
19
Optimized Generator Lifecycle Reduced Fuel Consumption Reduced Maintenance Frequency Remote Monitoring
20
References
21
Daniel Rixhon +352 26 90 78 88 +32 (0)4 345 67 21 +32 (0)478 63 35 05 d.rixhon@cet-power.com http://www.cet-power.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.