Presentation is loading. Please wait.

Presentation is loading. Please wait.

Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.

Similar presentations


Presentation on theme: "Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global."— Presentation transcript:

1 http://wwwhephy.oeaw.ac.at/p3w/cms/trigger Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global Trigger H. Bergauer, Ph. Glaser, M. Jeitler, K. Kastner, B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. Mikulec, M. Padrta, H. Rohringer, H. Sakulin, Th. Schreiner, J. Strauss, A. Taurok, C.-E. Wulz

2 Trigger Meeting, Dec. 2005 C. - E. Wulz2 Global Trigger Crate PSB (Pipelined Synchronizing Buffer) Input and Synchronisation GMT (Global Muon Trigger) Global Muon Trigger logic GTL (Global Trigger Logic) Algorithm logic FDL (Final Decision Logic) Level-1 Accept decision GTFE (Global Trigger Frontend) Readout TCS (Trigger Control System Module) Central Trigger Control L1A_OUT (Level-1 Accept Module) Distribution of Level-1 Accept CONV6U (Conversion Boards) Reception of status signals from the subsystems TIM (Timing Module) Timing

3 Trigger Meeting, Dec. 2005 C. - E. Wulz3 Final GT/GMT modules FDL PSB In 904 GMT GTFE GTL

4 Trigger Meeting, Dec. 2005 C. - E. Wulz4 Final GT modules TCS In 904 CONV6U In 904 TIM In 904 L1AOUT In 904

5 Trigger Meeting, Dec. 2005 C. - E. Wulz5 Module Status Name# needed  @ CERN  in Vienna TCS111 L1AOUT211 CONV6U442 PSB712 TIM121 GTL1GTL6U: Dec. 2005 GTL9U: Apr. 2006 1 FDL11 of 2: Jan. 20062 GTFE11: May 20061 (firmware ongoing) GMT11: Dec. 20051

6 Trigger Meeting, Dec. 2005 C. - E. Wulz6 PSB9U Pipelined Synchronizing Buffer – All 3 available boards are working – Bit error rate tests have been succesful (no bit errors in 10 13 transfers) – Signal transfer from Global Calorimeter Trigger in principle OK – Problems with wrongly made cables led to delays (and almost ruined a PSB …) now understood – Technical trigger inputs Working with TOTEM Work on scintillator hodoscope min.bias trigger / beam gas veto is planned

7 Trigger Meeting, Dec. 2005 C. - E. Wulz7 TCS + L1AOUT PSB Trigger Control System + Output Module Pipeline Synchronizing Buffer Timing Board TIM Global Calorimeter Trigger Integration Tests with Global Calorimeter Trigger

8 Trigger Meeting, Dec. 2005 C. - E. Wulz8 Global Muon Trigger Logic Board Status: Sent to CERN today! GMT Module has been commissioned in Vienna Chips redesigned for CAEN controller One remaining error, which will be solved by a new chip on new mezzanine board: one muon always gets same charge. Further tests are planned with spares in Vienna Software integration is under way Planned integration tests at CERN in 904 (Dec. 2005-Feb. 2006): –RPC LB-TB-Sort-GMT –CSC-TF-GMT –DTSC-DTTF-Sort-GMT

9 Trigger Meeting, Dec. 2005 C. - E. Wulz9 GTL, FDL and GTFE GTL9U – Board is produced. Commissioning has started in Vienna. FDL – Available for some time. Needed in Vienna for tests with GTL9U. GTFE – Board is produced. – Basic electrical tests OK. – Commissioning has started. Fast Monitoring Module (FMM) – responsible: CERN – Communication with Global Trigger OK – Software development: Hannes Sakulin

10 Trigger Meeting, Dec. 2005 C. - E. Wulz10 Trigger Control System and Timing Trigger Control System (TCS) is operational – Software integration into Trigger Supervisor TIM modules are operational Global Clock (TTC) is running – responsible: CERN – Trigger output goes to TTCci module, under test – locale distribution by Vienna TIM module Emulators – responsible: Imperial College, London – Communication with Global Trigger OK – continue to work on firmware Fast Monitoring Module (FMM) – responsible: CERN – Communication with Global Trigger OK – Software development: Hannes Sakulin

11 Trigger Meeting, Dec. 2005 C. - E. Wulz11 Test Schedule n Ongoing in 904: TCS, PSB input board, TTC – Trigger Control System validation – Test with Global Calorimeter Trigger – Test with TTC n Jan. - March 2006: GTL6U, FDL – test logic and trigger decision n From Dec. 2005: GMT – test with other muon subsystems n Jan. - March 2006: preparation for magnet test and Cosmic Challenge n From Apr. 2006: GTL n From May 2006: GTFE

12 Trigger Meeting, Dec. 2005 C. - E. Wulz12 Summary At least one board of all Global Trigger modules exists. Tests in building 904 are ongoing. Software development efforts are reinforced. GUIs for trigger setup and operation exist. Participation in the cosmic challenge during the magnet test is prepared. Latency has been verified.


Download ppt "Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global."

Similar presentations


Ads by Google