Download presentation
Presentation is loading. Please wait.
Published byGeorgina Wilkerson Modified over 9 years ago
1
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM PRESENTATION - CNES Responses to CLS User survey Synthesis of NOAA User consultation Anticipated Argos-4 needs ARGOS-3 : * System Heritage * Commissioning ARGOS-4 System : Preliminary Overview
2
DBCP Workshop October 2006 ARGOS-4 CNES RESPONSES TO CLS USER SURVEY
3
DBCP Workshop October 2006 ARGOS-4 CNES SURVEY CONTEXT 1604 surveyed customers238 replies Replies per application
4
DBCP Workshop October 2006 ARGOS-4 CNES SURVEY CONTEXT Total: 1604Total: 238
5
DBCP Workshop October 2006 ARGOS-4 CNES USER SATISFACTION Biologists Meteo/Ocean Argos services Client support GLOBAL
6
DBCP Workshop October 2006 ARGOS-4 CNES USERS COMMENTS “ Reliability of system for data retrieval and quick response of local office to program needs. ” wildlife -US “ Stability of the system over many years ” Ocean - US « VERY STABLE AND RELIABLE » Ocean, Wildlife US “ Reliable, service oriented and professional. What’s New”, Wildlife, Canada “ Simplicit é et robustesse du syst è me. Qualit é des conseils techniques syst è me Simplicit é et robustesse du syst è me. Qualit é des conseils techniques” France syst è me », Balloons, France “ Reliability/dependability Familiarity/stable over a long period of time Global coverage & Goals”, Ocean -Australia
7
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SERVICE APPRECIATION
8
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SUPPORT SERVICE
9
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM METEO / OCEAN (1/2) Global Main users
10
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM METEO / OCEAN (2/2) Capability to collect low power signals Number of Argos Doppler locations Argos location accuracy
11
DBCP Workshop October 2006 ARGOS-4 CNES # SATELLITES – TIME RESPONSE WEAKNESSES AS SEEN BY USERS “ Very poor data throughput near the equator … More satellite passes near the Equator ” Hydrology - US “ Improve coverage at low latitudes ”, Wildlife, US “ Hourly time response ”, DBCP Workshop, Int ’ l “ The satellites are not giving data at all around East of Catalonia (Spain), North of Italy and South-East of France ”, Wildlife, Spain “ Keep adding satellites ”, Wildlife, US
12
DBCP Workshop October 2006 ARGOS-4 CNES DATA VOLUME WEAKNESSES AS SEEN BY USERS “ Limitation data capacity ” Ocean. - Japan “ Basic scheme of this system is out of date. It means "narrow band". Drastic system innovation necessary. Broad band!! ” Ocean. Japan “ Limitation data capacity ” Ocean – US “ Slowness of data transmission is an obstacle. ” Ocean., Canada “ d é bit de donn é es trop faible », Meteo. France “ Low data uplink rate ”, Ocean. Germany
13
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM ENHANCEMENTS
14
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM BIOLOGISTS (1/2)
15
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM BIOLOGISTS (2/2) Capability to collect low power signals Number of Argos Doppler locations Argos location accuracy
16
DBCP Workshop October 2006 ARGOS-4 CNES LOCATION PERFORMANCE WEAKNESSES AS SEEN BY USERS “ Highly sensitive to coverage and satellite availability.. Barely 1/3 of our location points were considered within 2km accuracy ” Wildlife, US- South Africa “ Lack of information about A, B location classes “ Wildlife US “ Location quality is an issue. Although the use of Doppler is brilliant, the method still has errors that can be significant. ” US Wildlife “ Low percentage of LC3 and LC2 of positions determined by doppler ”, Wililfe Australia “ The main weakness seems to be inherent in the system itself, where the use of doppler frequency technique is not capable of accurately calculating the positions of weak transmitters. ” Wildlife, Norway
17
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS SYSTEM APPRECIATION
18
DBCP Workshop October 2006 ARGOS-4 CNES USER OF ARGOS SINCE
19
DBCP Workshop October 2006 ARGOS-4 CNES SYNTHESIS OF NOAA USER CONSULTATION
20
DBCP Workshop October 2006 ARGOS-4 CNES QUESTIONNAIRE Distribution and Coverage How many DCPs? Where? Timeliness How often transmit/receive to each DCP? Latency requirements? Direct read-out? Link Reliability Importance for transmit Importance for receive Throughput How much data on each transmit / receive? Geolocation Use of Doppler geolocation Use of GPS Portability Antenna size? Volume and mass? Future Tradeoffs Argos DCS study report was issued on december 7,2005 Questionnaire was issued to 33 people 20 responses received : – 5 ocean – 11 biologists – 4 DCP manufacturers
21
DBCP Workshop October 2006 ARGOS-4 CNES CONCLUSIONS Survey responses indicate that next-generation of Argos DCS should focus on –Improving DCP transmit performance: increased data volumes with reduced size, mass and power –Improve Doppler geolocation to < 150m with a target of <50m An order-of-magnitude improvement in data volumes and cost would make Argos DCS attractive to a new class of users Argos system is not adapted to applications generating large amount of data per hour
22
DBCP Workshop October 2006 ARGOS-4 CNES ANTICIPATED ARGOS-4 NEEDS
23
DBCP Workshop October 2006 ARGOS-4 CNES NUMBER OF ACTIVE PLATFORMS IN THE SYSTEM Average growth > 12% per year
24
DBCP Workshop October 2006 ARGOS-4 CNES NEED FOR ADDITIONAL CAPACITY Need for more than 15 Erlang capacity
25
DBCP Workshop October 2006 ARGOS-4 CNES LESS EXPENSIVE TRANSMITTERS
26
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS USER NEEDS FOR ARGOS 4 COMPLIANT WITH ARGOS-3: able to process the ARGOS-3 platforms ONE-WAY AND TWO-WAY COMMUNICATION DCPs (Data Collection Platforms): -Low power drain : factor 2 -Low volume and mass : factor 2 -High power efficiency for transmitting : factor 2 -Low power consumption for receiving : constant for increased capacity INCREASE DCP DENSITY: -Doubled number of platforms among which 25% are @ 4800 bps -Increase data volume transmission per pass : up to 100 kb per pass IMPROVE LOCATION : 50 to 150 m BETTER TIME RESPONSE : Average < 30 min INCREASE DOWNLINK DATA VOLUME : > 1,2 kbps
27
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS USER NEEDS FOR ARGOS 4 KEEP COMPATIBILITY WITH ARGOS-2 & ARGOS-3 PMTs INCREASE AUTONOMY & REDUCE SIZE -Tx power drain decrease: factor 2 -Rx power drain : constant for increased capacity -Size & weight decrease : factor 2 INCREASE DCP DENSITY: -Doubled number of platforms among which 25% are @ 4800 bps -Increase data volume transmission per pass : up to 100 kb per pass IMPROVE LOCATION : 50 to 150 m BETTER TIME RESPONSE : Average < 30 min INCREASE DOWNLINK DATA VOLUME : > 1,2 kbps
28
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3
29
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3 SYSTEM HERITAGE (1/4) 401-402 MHz: 110 kHz bandwidth centered on 401.635 MHz (30 kHz for high data rate platforms and 80 kHz for low data rate platforms) -Co-Primary status at the International Telecommunication Union -Favourable link budget -Small and cheap antenna: mainly whip antenna on platforms DCP -PTT (Platform Transmitter Terminal) oStandard DCP@ 400 bps (Argos-1 & 2 heritage) oNew Generation of DCP @ 400 bps available in 2007: 3 to 4 dB link budget improvement, going to reduce average power and power drain oHigh data volume DCP @ 4800 bps : up to 4608 useful bits per burst
30
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3 SYSTEM HERITAGE (2/4) -PMT (Platform Message Transceiver): Two-way communications for standard DCP, New Generation DCP and High Data Volume DCP ELTA PMT/PTT First generation: Available now Second generation: Available in 2007 SEIMAC / MARTEC PMT
31
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3 SYSTEM HERITAGE (3/4) LEO ORBITS -Global coverage (including polar areas) AUTONOMOUS GEOLOCATION -On ground Doppler location : 300 to 400 m SIMPLE MULTI-USER ACCESS (as ARGOS-1 and 2) -Frequency / Time Random Access (no communication protocol) -Robust and simple to operate IMPROVED SENSITIVITY w.r.t ARGOS-2 (from -131dBm to -137dBm)
32
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3 SYSTEM HERITAGE (4/4) DOWNLINK @ 400 bps usage (466 MHz) -UTC Time, satellite ephemeris and constellation status broadcasting increase platform lifetime & optimise platform transmission profile -Interactive Data Collection : secure data collection by acknowledgment for all kind of platforms, potentially increase data volume per pass -Download specific information define by the user to its DCP -Download DCP Configuration : frequency emission, repetition period, transmitting power, DCP reset, …
33
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-3 COMMISSIONING Instrument switching on 8 days after the METOP-A launch (October 2006) Commissioning over 3 to 4 months Development of PMT prototypes for dedicated applications in different constraint environments: -Important traffic density : fishing DCP in tropical zone -Data Volume transmission per pass : drifting buoys, sub-surface buoys, … -High sensibility DCP (PTT & PMT): animal tracking, improve lifetime with the new generation of DCP @ 400 bps -Based on the feedback of the commissioning, optimisation of the downlink use and evaluation of the global capacity in the system will be performed
34
DBCP Workshop October 2006 ARGOS-4 CNES SATELLITE TRANSITION SCHEDULE
35
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (1/10) Average time response (min) Maximum Hole per day (hours*) 552.5 < MH < 4.7 662.9 <MH <3.7 BASIC SYSTEM CONSTELLATION -Reference constellation: NOAA-K, L, M & N -NPOESS-C1, C2 and METOP (3 main guaranteed orbits) * at equator
36
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (2/10) Average time response (min) Maximum Hole per day (hours) 552.5 < MH < 4.7 662.9 <MH <3.7 IMPROVEMENT IDEAS -Satellite orbit control -NPOESS-C1, C2 and METOP + 1 equatorial orbit satellite * at equator Average time response (min) Maximum Hole per day (hours*) 552.5 < MH < 4.7 662.9 <MH <3.7 301.6 < MH < 1.7
37
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (3/10) Average time response (min) Maximum Hole per day (hours * ) 552.5 < MH < 4.7 662.9 <MH <3.7 301.6 < MH < 1.7 140.7 < MH < 0.8 IMPROVEMENT IDEAS -Satellite orbit control -NPOESS-C1, C2 and METOP + 2 equatorial orbit satellites * at equator
38
DBCP Workshop October 2006 ARGOS-4 CNES Data throughput STD + NG/400 bps: low power Tx HD/4800 bps: 10 msgs - 50 kbits per pass Tx power: 5 W Capacity: 12 processing units (3 HD) 110 kHz frequency bandwidth Two-way link (400 bps) ARGOS 3 ARGOS 4 Data throughput STD + NG/400 bps: low power Tx HD/4800 bps: 30 msgs -140 kbits per pass Tx power: 3 W Capacity: 40 processing units (10 HD) 400 kHz frequency bandwidth (TBC) Processor speed x 30 Two-way link (3 x 400 bps TBC) ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW
39
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW DCP: -ARGOS-3 DCP remain compatible with the system -New Generation of High Data volume DCP @ 4800 bps: simple turbo code scheme based on the existing HD DCP MORE CAPACITY -New Radhard processor up to 840 Mflops w.r.t ARGOS-3 @ 25 Mflops -Extended bandwidth from 110 kHz to 400 kHz (TBC): subject to filing submission DOWNLINK -ARGOS-3 PMT receivers remain compatible with the system -Reinforce downlink data rate (consistently with the uplink capacity) through a factor 3 on satellite emitted power over an extended bandwidth
40
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW DCP: -3 dB gain for the New Generation of High Data volume DCP @ 4800 bps, going to reduce average power and power drain -Due to the extended bandwidth it is expected to allocate a specific band for low power applications (animal tracking, …) → better Doppler Geolocation IMPROVEMENT OF THE CAPACITY -More High Data volume DCPs in the system -Better platform processing by using multi-user techniques -More processing units: 30 low data rate units and 10 high data rate units -Dynamic carrier frequency attribution through the downlink (PMT frequency management) DOWNLINK -Improving the data bit rate: 3 times more than ARGOS-3 PMT (TBC) for the same characteristics and complexity at PMT level
41
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (6/10) With Argos-2 msg 1 msg 2 Argos-2 platform Message 1 and message 2 are alternately repeated within the pass (no ACK) 500 bits max are transmitted per pass Repetition period is fixed (~100 seconds) Data collection : only 2 transmitted bursts are useful limitation of the capacity
42
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (7/10) msg 1 msg 3 msg 4 msg 6 msg 2 msg 4 msg 5 Argos-3 platform Repetition period is fixed (~100 seconds in nominal, 30 seconds minimal ) Data collection : all transmitted bursts are useful capacity is highly enhanced In this example, 6 messages are transmitted during the pass with ACK 27 kbits (HD) or 1.5 kbits (STD) have been transmitted With Argos-3
43
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (8/10) msg 1 msg 3 msg 5 msg 7 msg 12 msg 2 msg 4 msg 6 msg 10 Argos-3 or Argos-4 platform Idem Argos-3……… but Uplink Capacity of system highly enhanced x 10 In this example, 12 messages are transmitted during the pass with ACK due to the higher available capacity 55 kbits (HD) or 3 kbits (STD) have been transmitted Repetition period is reduced (up to 10 seconds) and…. Number of HD platforms x 10 msg 7 msg 8 msg 9 msg 11 With Argos-4
44
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW Data Rate (bps) Argos-2 STD Argos-3 HD 400 4800 256 bits x 2 = 0.5 kbit (NO ACK) 4608 bits x 12 = 55 kbits (ACK) 2 useful bursts per pass * 11 useful bursts per pass * * for a repetition period = 50 seconds ** for a repetition period = 20 seconds Argos-3 BD Argos-4 HD 30 useful bursts per pass ** 4608 bits x 30 = 135 kbits (ACK) 256 bits x 12 = 3 kbits (ACK) and….Number of HD Platforms x 10 MAXIMUM DATA AMOUNT PER PASS (10 min)
45
DBCP Workshop October 2006 ARGOS-4 CNES ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW ARGOS-4 PLANNING (TBC): -System study until spring of 2007 -Phase A study: until end of 2007 -Phase B: beginning of 2008 -First Flight Model provided in 2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.