Presentation is loading. Please wait.

Presentation is loading. Please wait.

ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学.

Similar presentations


Presentation on theme: "ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学."— Presentation transcript:

1 ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学

2 H. Yamamoto, Beijing, Jan, 2009 ILC running scenario ■ 1st stage  Energy 200-500 GeV, scannable  e   polarization > 80%  500 fb -1 in first 4 years ■ 2nd stage  Energy upgrade to ~1TeV  1000 fb -1 in 3-4 years (http://www.fnal.gov/directorate/icfa/para-Nov20-final.pdf)

3 H. Yamamoto, Beijing, Jan, 2009 ILC options ■ Additional 500 fb -1 at 500 GeV CM in 2~3 years  Depends on results from LHC, ILC phase I. ■ e + polarization of 50% or more  ~30% polarization is in the baseline ■ ,  e , e  e  colliders  Photons generated by inverse Compton scattering of laser ■ Giga-Z (running on Z-pole)  10 9 Z’s in a few months (esp. b-tagging & beam polarization)

4 H. Yamamoto, Beijing, Jan, 2009 ILC Physics Phase I Phase II Time

5 H. Yamamoto, Beijing, Jan, 2009 ILC features ■ Well-defined initial state  Known initial e+e- 4-momentum  Known e- spin (e+ spin optional) ■ Clean environment  Exploited to achieve good detector performances  Momentum, vertexing  Jet reconstruction ■ → Pair creation of SUSY particles and Higgs-strahlung as just a few examples :

6 H. Yamamoto, Beijing, Jan, 2009 Smuon detection - use of polarization (bkg rejection) - ■ Signal :  +   and nothing. Plot acoplanarity of e + e   +  . ■ Polarized e  (R) can reduce W + W  background.

7 H. Yamamoto, Beijing, Jan, 2009 Masses of smuon and LSP - well-defined initial state - ■ Energy of smuon is known (= beam energy) ■ Use the endpoints of   for simultaneous determination of and ■ Can also determine the spin by ang. dis. of  ’ s

8 H. Yamamoto, Beijing, Jan, 2009 SUSY Lagrangian Reconstruction - use of polarization (interaction picker) - ■ E cm = 500 GeV, 50 fb -1 ■ Serves as a test of GUT relation (or other mechanism) Fit to Wino-Higgsino mass term With polarized e- beam

9 H. Yamamoto, Beijing, Jan, 2009 Higgs-strahlung - well-defined initial state - ■ Tagged Higgs Factory  5  detection : ~ 1yr at LHC, ~ 1 day at ILC  Br(H→invisible) can also be measured ■ Momentum resolution ~ x10 better than LHC required

10 H. Yamamoto, Beijing, Jan, 2009 Higgs Couplings - distinguish models - (By S. Yamashita) SUSY (2 Higgs Doublet Model) Extra dimension (Higgs-radion mixing) ■ Good b,c tagging by vertexing required

11 H. Yamamoto, Beijing, Jan, 2009 Jet(quark) reconstruction ■ With, Z/W  jj can be reconstructed and separated Many important modes are multi-jet. WW/ZZ separation

12 H. Yamamoto, Beijing, Jan, 2009 ILC Detector Performances ■ Vertexing: ~1/5 r beampipe, <1/30 pixel size (wrt LHC) ■ Tracking: ~1/6 material, ~1/10 resolution (wrt LHC) ■ Jet reconstruction: ~1/2 resolution (wrt LHC) Required to realize the ILC’s physics potential (not a luxuary)

13 H. Yamamoto, Beijing, Jan, 2009 ILC Detector R&Ds ■ Challenging performances realized by  Low-mass detectors  Fine granularities  Small beam size (vertexing closer to IP)  Development of new detector elements  Pixel sensors, SiPM/MPPC, GEM/Micromegas, etc.  Optimized detector integration  e.g. Jet reconstruction  Assembly and installation, MDI issues ■ Intensive R&D efforts are on-going on all the above

14 H. Yamamoto, Beijing, Jan, 2009 ILC Management Structure ILCSC GDE GDE Director Research Directorate Research Director PAC AAPIDAG FALC WWS Accelerator Experimental program Accelerator Advisory Panel International Detector Advisory Group Funding Agencies for Large Colliders Sakue YamadaBarry Barish

15 H. Yamamoto, Beijing, Jan, 2009 WWS World-wide study of the physics and detectors for future linear colliders ■ Established in 1998 ■ Coordinated experimental efforts of LC/ILC  Organized International LC workshops (LCWS)  Management though Panels  MDI, R&D, physics benchmark, cost, … ■ WWS panels are superceded by those under the research directorate ■ WWS continues to represent wider community interested in ILC  e.g. continues to organize LCWS

16 H. Yamamoto, Beijing, Jan, 2009 Detector Timeline synchronized with machine ■ Detector Design Phase I : ends 2010  Focus on critical R&Ds  Detector LOI validation by IDAG  Update physics performance  Prepare for LHC physics ■ Detector Design Phase II : ends 2012  Re-formulate physics program based on LHC results  Confirm physics performance  Complete necessary R&Ds  Complete technical designs with costing

17 H. Yamamoto, Beijing, Jan, 2009 Why LOI Now? ■ Detector design effort should be in phase with that of machine.  From the past experience, detectors take about the same time for construction and assembly as the machine.  In order to proceed, machine needs detector design (exp. MDI/IR region design). ■ The process of ILC detector group formation should be open to all.  Give chance to all interested parties ■ Signing LOI does not indicate a formal commitment to the detector concept (This not a ‘ collaboration ’ ).

18 H. Yamamoto, Beijing, Jan, 2009 Detector LOI Validation by IDAG ■ Call for LOI was made  Oct, 2007 ■ LOI submission deadline  March 31, 2009 ■ Time scale of validation  ~ 1/2 year (fall 2009) ■ Validation  NOT a down-selection to two detectors at this time. (ILC will have two detectors in push-pull)

19 H. Yamamoto, Beijing, Jan, 2009 Validation means: ■ Are the physics goals convincing ? ■ Is the detector concept suited and powerful enough for them? ■ Does push-pull work OK ? ■ Is the detector feasible ?  Are the necessary R&Ds progressing fast enough ?  Is the cost estimation reasonable ? ■ Is the group powerful enough for the design phase ? If the answers are all ‘yes’, then the LOI is ‘validated.’’ LOI process helps to identify and organize critical R&Ds.

20 H. Yamamoto, Beijing, Jan, 2009 LOI Groups ■ So far, 3 groups submitted EOIs to ILCSC 4th SiD GLD LDC ILD + (2007 summer)

21 H. Yamamoto, Beijing, Jan, 2009 Jet Reconstruction Methods ■ PFA (particle flow algorithm)  Measure charged particles with trackers  Measure neutrals with calorimeters  Remove over-counting (e.g. charged hadron showers)  Requires fine granularity and sophisticated logic ■ Compensating calorimetry  Measure EM and hadronic shower components separately  Re-weight them to obtain jet energy Two approaches

22 H. Yamamoto, Beijing, Jan, 2009 Detector Concepts ILDSiD4th TrackerTPC + Si-stripSi-stripTPC or Si-strip or DC CalorimetryPFA compensating B3.5 T5 T3.5 T ECAL Rin1.84 m1.27 m1.5 m Rout6.6 m6.45 m5.5 m Zout6.7 m6.45 m6.4 m ECAL/HCAL inside solenoid All uses some pixel vertexing

23 H. Yamamoto, Beijing, Jan, 2009 4th ■ Dual-readout calorimeters (compensation, not PFA)  Scint+Cerenkov ■ Iron-less double solenoid (no return yoke)  Light  Good muon tracking ■ Subdetector choices  Pixel vertexing  Tracking  Clucou (cluster-counting): DC  And/or Si-strip  Or TPC Dream cal test solenoid

24 H. Yamamoto, Beijing, Jan, 2009 ILD ■ Cambridge ILD meeting (Sep11-13/08)  ILD reference parameters defined  B = 3.5 T  ECAL Rin = 185 cm etc.  GLD and LDC are truly unified!  Some options are clearly open and will be in LOI  ECAL technologies (schint. Si)  VTX configurations  etc.  Agreed to use a single software framework managed jointly.  Mostly based on MOKKA/Marlin  With good parts of Jupiter/Satellite ■ Seoul ILD meeting (Feb16-18/09)  Last workshop before LOI submission

25 H. Yamamoto, Beijing, Jan, 2009 ILD ■ Vertex  5-6 layers  Technology - open ■ Si-strip tracker  2 barrel + 7 forward disks  outer TPC, end TPC ■ TPC  GEM or MicroMEGAS (or Si- pixel) ■ ECAL  Si-W or Scint-strip ■ HCAL  Scint-tile (or digital HCAL)

26 H. Yamamoto, Beijing, Jan, 2009 SiD ■ Vertex  5 barrel lyrs, 4 disks  Technology - open ■ Si-strip tracker  5 lyrs barrel, 5 lyrs forward ■ EMCAL  Si-W, 30 lyrs, pixel (4mm) 2 ■ HCAL  Scint-tile or digital HCAL, 38 lyrs

27 H. Yamamoto, Beijing, Jan, 2009 SiD ■ Boulder SiD meeting (Sep16-19/08)  Engineering workshop  By the SiD engineering group  Beam tube, ECAL, HCAL designs  etc.  SiD workshop  Geared toward LOI planning  Benchmarking, PFA, optimization  Subdetector groups charged to answer IDAG questions  Detailed schedule made for LOI

28 H. Yamamoto, Beijing, Jan, 2009 LOI groups and R&D groups by Yasuhiro Sugimoto

29 H. Yamamoto, Beijing, Jan, 2009 WWS R&D Panel Reviews ■ Goal  Improved communications → enhanced R&Ds ■ Reviewers  R&D panel members, external experts, funding agency reps. Chair: C. Damerell ■ Had 3 reviews:  Feb 07, Beijing : Tracking  Jun 07 DESY : Calorimetry  Oct 07 Fermilab : Vertexing ■ Reports  http://physics.uoregon.edu/~lc/wwstudy/detrdrev.html

30 H. Yamamoto, Beijing, Jan, 2009 Vertexing Review ■ Challenge:  (20  m) 2 pixel over 1 ms bunch train→occupancy too high  Solutions:  Bunch id (ideal), time-slice a train (~20), small pixel ■ ~10 technologies reviewed  Bunch id: Chronopixels, SOI/3D  Time-slice: CPCCD, MAPS, deep N-well, CAP, DEPFET, ISIS  Small pixel: FPCCD ■ Review:  ‘ All options hold promise, unable to eliminate any of them. ’  ‘ 2~4 technologies at start-up, others for upgrades ’  ‘ Some have applications in other fields ’

31 H. Yamamoto, Beijing, Jan, 2009 Tracking Review ■ 3 basic technologies reviewed  Silicon strip (SiLC, SiD tracking)  TPC (LC-TPC)  Drift chamber (CLUCOU) ■ Review:  ‘ Extremely impressed ’  ‘ Currently far from goals for all options ’  ‘ Forward tracking ’ : ‘ achieved in practice? ’  A large prototype (R=1m) in B=3~5 T recommended Expensive! (not part of review)

32 H. Yamamoto, Beijing, Jan, 2009 TPC Large Prototype ■ Large prototype collaboration  Close connections to  LCTPC collaboration  Field cage + read out  EUDET  End plate from Cornell ■ Parameters  R ~ 38 cm  B ~ 1 T (PCMAG from KEK)  Test :  Field uniformity  GEM, MicroMEGAS  Si pixel readout ■ Beam test Feb. 2009

33 H. Yamamoto, Beijing, Jan, 2009 Calorimetry Review ■ Luminosity measurement, hermeticity, beam diagnostics  FCAL collaboration (15 groups) ■ Review:  ‘ BEAMCAL can benefit from hadron machines (LHC) ’  ‘ Needs funding for the US part (even before FY07 disaster) ’ IP 5mrad ~40mrad ~150mrad Forward calorimetry

34 H. Yamamoto, Beijing, Jan, 2009 Calorimetry Review ■ PFA-based  CALICE collaboration (41 groups)  SiD-CAL (17 groups, some in CALICE) ■ Compensating  DREAM collaboration (8 groups)  Fermilab group ■ Review:  ‘ PFA and compensation may both be needed ’  ‘ Esp. Forward region ’  PFA :  ‘ Extremely promising, but simulation alone cannot be trusted. ’  ‘ Use a large-scale physics prototypes ’ Expensive ! (not part of review)  Compensating  ‘ Needs more people ’ ‘ The approach could be the outright winner particularly in the … forward region ’ General Calorimetry 26%E -1/2 achieved on Z pole Full simulation No cheating ILD

35 H. Yamamoto, Beijing, Jan, 2009 CALICE Beam Test Muon trigger Data recorded: 2006 – DESY/CERN 2007 - CERN 2008 – Fermilab MTBF e 1-50 GeV  (mainly for calibration)  2-180 GeV Large amount of data accumulated and being analysed. ECAL/HCAL/TCMT

36 H. Yamamoto, Beijing, Jan, 2009 Is Push-pull Possible? ■ Switching scheme  Every ~ 1 month  Not enough for significant data  Switching time  Short enough to minimize deadtime  Needs to include alignment/calib. ■ Easier if detectors are self shielding ■ With or W/O platform?  Both schemes are under study  Structural estimations on-going ■ Question is still open

37 H. Yamamoto, Beijing, Jan, 2009 CLIC-ILC Collaboration ■ CLIC-ILC working groups established.  CFS, BDS, Cost&schedule, Beam dynamics  Detectors  Conveners:  L. Linssen, D. Schlatter (CERN)  F. Richard, S. Yamada (ILC research directorate)  Frequent contacts after Feb. 2008.  CLIC can use the large accumulation of ILC software (e.g. jet reconstruction - done)  Common subdetector R&Ds

38 H. Yamamoto, Beijing, Jan, 2009 Summary ■ The physics case for ILC remains strong as ever. ■ Unprecedented detector performances are needed to realize the physics potential of ILC. ■ 3 LOI groups (detector concept groups) are now working to submit LOI by March 31 ‘ 09 to be reviewed by IDAG. ■ Detector R&D groups and LOI groups are moving forward together to achieve the extremely-challenging detector performance goals. (Matrix reloaded and will be re- loaded again and again - fluid and lots of chances to join)


Download ppt "ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学."

Similar presentations


Ads by Google