Sprint 114 Review / Sprint 115 Planning August 26th, 2013
2
Sprint Resource Pages For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+114+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+114+Progress+Summary For next sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Spri nt+115+Progress+Summary https://developer.connectopensource.org/display/NHINProgress/Spri nt+115+Progress+Summary For information on the CONNECT 4.3 release visit: https://developer.connectopensource.org/x/NIADCQ https://developer.connectopensource.org/x/NIADCQ 2
3
Sprint 114 Summary - Cumulative Flow 3 To Do In Progress QA Done
4
Sprint 114 Summary - Burndown Chart 4
5
Sprint 114 Summary – Sprint Statistics Points committed = 14.0 –Initial points committed – 14.0 –0 ticket was moved to sprint 115 for 0.0 –0 tickets pulled into sprint for 0.0 Points remaining (unclosed) at end of sprint = 1.0 Points completed in sprint (velocity) = 13.0 5
6
Sprint 114 - What We are Showing Today Release 4.2 Available Release 4.2 Available –The Release 4.2 Wiki page: https://developer.connectopensource.org/x/AoB WC https://developer.connectopensource.org/x/AoB WC 6
7
Sprint 114 - Proposed Themes Support and Improved Testing Next steps in CI and testing automation improvements –Add JBoss to the automated CI process –Build Regression suite Framework for automation –Configuration management via JMX (i.e. Standard/ Entity) –Interoperability/integration test cases updates and enhancements Continue working with Healtheway/ CCHIT on certification program Support community that have begun Healtheway/ CCHIT participant certification testing –Beginning to field support questions for community members actively engaged in certification testing Support community with Release 4.2 deployments 7
8
Sprint 114 - What We are Showing Today CI and Test Automation Improvements Add JBoss to the automated CI process –CONN-490 –Validation suite automatically runs at code check in Build Regression suite Framework for automation –CONN-491 –CONN-492 –CONN-535 Configuration management via JMX (i.e. Standard/ Entity) –CONN-490 Interoperability/integration test cases updates and enhancements 8
9
Sprint 114 - What We are Showing Today CI and Test Automation Improvements Interoperability/integration test cases updates and enhancements –CONN-563 –CONN-567 –CONN-568 –CONN-569 –CONN-570 9
10
Sprint 114 - What We are Showing Today Interoperability Testing Release 4.3 Interoperability Testing Improvements –Interoperability Migration and Stability Setup 10
11
Sprint 114 - What We are Showing Today Certification Support Determination of Auditing Requirements for ATNA Compliance –Bring CONNECT into compliance with ATNA guidance; requirements specific to each of the exchange Services –Focus this sprint on the determination of required auditing data elements and preliminary design approach CONN-573 –Requirements for enhancements to Audit Logging https://developer.connectopensource.org/x/BIADCQ https://developer.connectopensource.org/x/BIADCQ –Preliminary Audit Design Approach: https://developer.connectopensource.org/x/kICrBw https://developer.connectopensource.org/x/kICrBw 11
12
Sprint 114 - What We are Showing Today Healtheway Certification Support Healtheway Participation Certification Support –Working with CCHIT on any clarifications –Continuing to work with several community members on testing –Haven’t been contacted on any members testing with 4.2 –No new updates or details on vendor certification –Links below provide valuable insight and help on CONNECT and the certification test cases Test case results Table 1 – https://developer.connectopensource.org/x/JwA4Chttps://developer.connectopensource.org/x/JwA4C Table 2 – https://developer.connectopensource.org/x/IoA7Chttps://developer.connectopensource.org/x/IoA7C Certification - https://developer.connectopensource.org/x/ZIC6Chttps://developer.connectopensource.org/x/ZIC6C 12
13
Sprint 114 - What We are Showing Today Additional Work this Sprint Meaningful Use Testing (NIST) –Working with NIST team on testing CONNECT with Meaningful Use test cases Bug Fixes –CONN-531 Document Retrieve in pass-thru mode failing in validation suite Community Support Tools (JIRA & Wiki) –Made changes to increase stability and uptime for both JIRA and CONNECT Wiki More stable server setup Increased storage capacity Clean up of Network 13
14
Sprint 114 - What We are Showing Today Custodial Agent and Community Support Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog https://issues.connectopensource.org/secure/VersionBoard.jspa? selectedProjectId=10140 14
15
Sprint 115 - Proposed Themes Support and Improved Testing Wrap up next step in testing automation improvements –Finish Regression suite Framework for automation (Large Payload) –Next components of Testing Configuration management via JMX (i.e. Standard/ Entity) –Interoperability/integration test cases updates and enhancements Continue supporting Healtheway/ CCHIT and community members on certification program –Beginning to field support questions for community members actively engaged in certification testing Support community with Release 4.2 deployments Design Approach for Auditing enhancements 15
16