2 EVN currently active in 14 CEE countries
Highlights 1 m electricity, gas, heat and water customers in Lower Austria 2,2 m electricity customers in BG and MK 1,700 MW generation capacity (gas, coal, hydro, wind and biomass) Coal-fired power plant of 790 MW in Germany 131,000 km electricity network and 10,500 km gas pipelines Waste incineration plant of 300,000 tons p.a. in Lower Austria 70 drinking and waste water plants for 10 m people Waste incineration plant and drinking water facility in Moscow Substantial holdings in Austria’s second largest oil and gas producer and Austria’s leading hydro power producer Strong partner in EnergieAllianz and EconGas in Austria EVN presence Energy supply Drinking and wastewater projects Waste incineration Coal-fired power station under construction EVN headquarters

3 Focus of environmental business: Central and Eastern Europe
Albania Belgium Bosnia Bulgaria Germany Estonia France Greece Italy Serbia Croatia Latvia Lithuania Luxemburg Macedonia Moldavia Netherlands Austria Poland Romania Russia Switzerland Slovakia Slovenia Czech Republic Turkey Ukraine Hungary Belarus Montenegro Cyprus EVN environment Focus of environmental business: Central and Eastern Europe EVN´s market presentation

4 Focus of Energy Segment: Austria and South East Europe
Albania Bosnia Bulgaria Germany Greece Italy Serbia Croatia Macedonia Austria Poland Romania Slovakia Slovenia Czech Republic Turkey Hungary Montenegro EVN´s market presentation Focus of Energy Segment: Austria and South East Europe

5 EVN environment Provides infrastructural services in the field of
thermal waste utilisation potable water supply waste water disposal Responsibilities Planning on a European scale Construction Financing Operation of customised facilities for communities Capacity 330,000 t/a Thermal output 120 MW Construction Grate firing 2 lines 3-stage flue gas treatment plant: dry, wet, catalytic Steam utilised at the Dürnrohr power plant Electricity, district heating and industrial steam supply 90% of the garbage shipped in by rail Enlargement for Line 3: environmental impact procedure finished since may 2007 – start up of construction june 2007 Capacity approx. 220,000 t/a Thermal output 90 MW Concept of AVN Zwentendorf Optimised opportunities for combined energy utilisation by compound operation with the Dürnrohr power plant. As a result savings on fossil fuels (50,000 tons of coal and 10 million cubic metres of natural gas per year), as well as reduction of emissions. Improvement of air quality in the entire region. Synergy effects from using the infrastructure of the existing power plant. Zwentendorf is located at the very centre of Lower Austria. Railway sidings in existence. 90% of the garbage is shipped by rail. Residuals are transported by rail. This saves on 20,000 truck runs per year.

6 Thermal waste utilisation plant MSZ 3 – Moscow
Project volume – EUR 190 million; project financed with 20% own funds Utilisation of tons of household garbage Construction progress: completed 2007 Construction: 2005 – 2007; operation: 2007 – 2019 Startup: end of 2007

7 Combined heat and power plant Ljuberzy, Russia
Electricity generation of (5 x 2.5 MW) from biogas Obtained from sewage treatment at the Ljuberzy plant Investment ca. EUR 65 m Capacity 3.25 Mio. m³/d Partner are the City of Moscow/ Moswodokanal 49 years operation On line before the end of 2008 WTE nimmt zweites Blockheizkraftwerk in Moskau unter Vertrag. Die WTE Wassertechnik GmbH, Essen, ersteigerte Ende Februar 2008 das Recht, auf dem Gelände der Abwasseranlage Ljuberzy südöstlich von Moskau ein Blockheizkraftwerk (BHKW) mit zugehöriger Schlammtrocknung zu errichten. Als Hauptenergiequelle dient das aus dem Klärschlamm gewonnene Biogas der Großkläranlage, die mit einer Kapazität von 3,25 Mio. m³/d zu den weltweit größten zählt. Zur Stromerzeugung von 12,5 MW (5 x 2,5 MW) wird das Biogas des Klärprozesses verwendet. Dabei steht bei der von WTE finanzierten Investition von ca. 65 Mio. EUR die Energieerzeugung und die Abwärmenutzung zur Klärschlammtrocknung im Vordergrund. Täglich 600 t Rohschlamm mit einer Trockensubstanz von 25 % werden in 4 Trocknern aufbereitet. WTE wird 49 Jahre für die Betriebsführung der Biogas-Anlage verantwortlich sein. Vertragspartner sind die Stadt Moskau und das staatliche Unternehmen für Wasser und Abwasser, Moswodokanal. Am Standort Kurjanovo baut WTE ihr erstes BHKW in Moskau zur Verstromung von Biogas. Die Anlage wird noch 2008 in Betrieb gehen. WTE setzt bereits seit Jahren auf den eigenen Kläranlagen, u. a. in Zagreb, ihr Know-how zur Energiegewinnung aus Klärprozess und Schlammbehandlung ein. Zurzeit baut WTE eine Abwasseranlage in Istanbul, deren Energiehaushalt weitgehend durch diese innovative Technik gesichert wird. Weitere Großprojekte werden aktuell in Warschau/Polen, Kohtla-Järve/Estland und Kaunas/Litauen durch die WTE-Gruppe realisiert.

8 Waste water treatment plant Zelenograd / Moscow
Capacity: PE Term: 12,5 years Investitionment volume: EUR 65,3 million Startup: December 2000

9 Zagreb / Croatia Client: City of Zagreb - Croatia Capacity:
PE Investment volume: > EUR 200 million

10 Sewage treatment plant Warsaw-Czajka, Poland
Modernisation of Poland‘s largest sewage treatment plant Investment of EUR 500 million Partner Veolia Water (France) and local construction company Warbud Construction will start already in August 2008, to meet the scheduled handing-over date of December 2010 WTE baut mit internationalem Konsortium Polens größte Kläranlage Czajka in Warschau. Die WTE Wassertechnik GmbH, Essen, unterzeichnete am als Mitglied eines internationalen Konsortiums den Vertrag zur Modernisierung und Erweiterung der Kläranlage Czajka nördlich von Warschau. Auftraggeber dieses Großprojektes mit einer Investitionssumme von über 500 Mio. EUR sind die städtischen Wasser- und Abwasserwerke von Warschau (MPWiK). Das Projekt wird zu ca. 40 % von europäischen Fonds mitfinanziert. Die Großkläranlage Czajka wird mit einer Kapazität von m³ pro Tag, das entspricht 2,1 Mio. Einwohnerwerten, die Reinigungsleistung der bestehenden Anlage nahezu verdoppeln. Somit entsteht die größte Abwasserreinigungsanlage Polens. Neben WTE sind Veolia Water (Frankreich) und der polnische Baukonzern Warbud als Federführer an dem Konsortium beteiligt. Die Arbeiten sollen in zwei Phasen erfolgen, um den Betrieb der bestehenden Anlage zu gewährleisten. In der zweiten Phase erfolgen der Rückbau der Altanlagen und deren komplette Neuerstellung. WTE ist neben der Planung und Ausrüstung der mechanischen Stufe sowie der Vorklärung insbesondere für die Schlammbehandlung verantwortlich. Bereits im August 2008 findet der Baubeginn statt um die Anlagen im Dezember 2010 übergeben zu können. Durch den Bau der Anlagen in Zagreb, Wien und Moskau besitzt WTE weitreichende Erfahrungen in der Projektierung und Erstellung von Großkläranlagen. Zurzeit baut WTE u. a. Anlagen in Stettin/Polen, Kohtla-Järve/Estland und Kaunas/Litauen sowie in der türkischen Metropole Istanbul.

11 Ataköy Waste Water Treatment Plant
Turn-key project including 5-year-operation Client/ISKI Istanbul Water Employer: and Sewerage Administration Capacity: ca. 2 Mio PE m³/d / m³/d (biological / mechanical) Investment volume: EUR 108,5 million Date of Contract Award: May 11, 2007 Großauftrag in der Türkei WTE gewinnt Ausschreibung in Istanbul Die WTE Wassertechnik GmbH, Essen, hat nach internationaler Ausschreibung den Auftrag zum Bau der Kläranlage Ataköy der türkischen Großstadt Istanbul erhalten. Als Führer des Konsortiums WTE-Lidya-Kalyon wird WTE zusammen mit zwei türkischen Baufirmen im Auftrag der Istanbuler Stadtentwässerung eine Anlage für ca Einwohner der Metropole bauen. Das entspricht einer Abwassermenge von durchschnittlich m3/d. Das Projekt mit einem Investitionsvolumen von über 100 Mio. € umfasst neben dem schlüsselfertigen Neubau der Anlage auch die Betriebsführung für fünf Jahre. Zur Anwendung kommt modernste Verfahrenstechnik auf Basis „weitergehende biologische Abwasserreinigung WTE“. Neben dem Kohlenstoffabbau erfolgt auch die Elimination von Stickstoff und Phosphor. Aus dem anfallenden Klärschlamm wird in insgesamt sechs Faultürmen Biogas produziert. Die Energieversorgung der Kläranlage kann vollständig über ein Blockheizkraftwerk (BHKW), das mit dem gewonnenen Biogas und zusätzlich Erdgas betrieben wird, abgedeckt werden. Die Abwärme aus dem BHKW wird zur weiteren thermischen Trocknung des Klärschlamms genutzt. Um Geruchsemissionen zu vermeiden, erfolgt eine Abluftbehandlung mittels Ozon. Maßgebend für die Auftragsvergabe an das Konsortium WTE-Lidya-Kalyon war neben der WTE Technologie und dem Angebotspreis auch der niedrige Energieverbrauch der eingesetzten Aggregate. Mit diesem Auftrag gelang der WTE-Gruppe erfolgreich der Schritt in einen aussichtsreichen Umweltmarkt, der im Zuge der EU-Beitrittsverhandlungen enormen Aufwind erhält. Die Türkei wird in den kommenden Jahren mehrere Milliarden Euro in die Abwasserentsorgung investieren. WTE hat bereits mehr als 70 Anlagen zur Abwasserentsorgung gebaut und ist neben Österreich, Slowenien und Kroatien insbesondere in Osteuropa erfolgreich. So wurde Anfang des Jahres in Moskau eine Trinkwasserversorgungsanlage für eine Millionen Einwohner durch WTE gebaut und in Betrieb genommen.

12 Thank you for your attention!
EVN environment or

13 Company profile – fact sheet
Aktie EVN EVN is a leading integrated energy and environmental service group serving customer in Lower Austria and Central and Eastern Europe Business areas Electricity, gas, heating, water, waste incineration Countries Austria, Bulgaria, Croatia, Cyprus, Estonia, Germany, Poland, Lithuania, Macedonia, Russia, Slovakia, Slovenia, Denmark, Turkey Employees 9,535 (-4.4%) thereof ~ 75% in abroad Revenue 2,233.1 EUR m (+7.8 %) EBITDA 350.7 EUR m (-11.8 %) EBIT 197.3 EUR m (+7.0 %) Net results 227.0 EUR m (+2.3 %) Credit Rating Moody’s: A1, stable Standard & Poor’s: A, stable


Download ppt "EVN - Energy and Environment Services"

Similar presentations


Ads by Google