Download presentation
Presentation is loading. Please wait.
1
PRIME SYSTEM MEASURMENT REQUIREMENTS
TMDE PROGRAM NSWC Det Seal Beach PRIME SYSTEM MEASURMENT REQUIREMENTS Steven Makieil (562)
2
GPETE Engineering Support Team
TMDE Engineering & Logistics Support Code 744 Steven Makieil TMDE Initial Outfitting TMDE Calibration & Repair TMDE Application Engineering POC: SCN: Lemier & Halkens OPN: Goodson POC: Frank Amalfitano POC: Greg Hogan 2
3
Measurement Requirements
Focus TMDE Program on PS/E Requirements Focus GPETE Capability on PS/E Requirements Focus GPETE Configuration Management Qualify SCAT/Model by PS/E Requirements Outfit Activities/Classes by PS/E Requirements 2
4
Value to Program GPETE Decisions Based on Technical Merit
GPETE Decisions Based on Mission Requirements Platform/Class/Shore Activity Outfitting Battle Force/Deployment Scheduling Substantiate GPETE Budgets GPETE to PS/E (Technical Merit) PS/E to Activity (Mission Requirements) Activity to OPNAV Sponsor (Mission Funding) 2
5
Measurement Footprint
Develop Measurement Footprint Group PS/E by Measurement Requirements/Functions Group Measurement Functions into SCAT Matrix - PS/E by Measurement Function by SCAT Apply Measurement Footprint Focus SCAT Specs on PS/E Measurement Functions SCAT to Standard Models Models Qualified by PS/E Requirements (Technical Merit) More PS/E Supported by Fewer Models (Standardization) Outfitting Strategy Activity Requirements Driven by Measurement Footprint Measurement Footprint Driven by PS/E Allowance SCAT Allowance Driven by PS/E Obsolescence Strategy Technology Solution Based on PS/E Measurements Leverage Technology (Multi-Function Models/Multiple SCATs) 2
6
Technical Responsibilities
GPETE Application Engineering (TMDE Program) Measurements Technology Application to PS/E Requirements GPETE Metrology Engineering (Calibration Program) Measurements Integrity of GPETE (Traceability) GPETE Configuration Management Controls Prime System/Equipment (PS/E) to SCAT SCAT to GPETE 2
7
Prime System – (Acquisition & Modernization Programs) SYSCOM PM & ISEA
Technical Authority Prime System – (Acquisition & Modernization Programs) SYSCOM PM & ISEA GPETE - (TMDE Program) NAVSEA 04L & NSWC Det Seal Beach CAL/STD - (Calibration Program) NAVSEA 04M & NSWC Corona 2
8
Determination Technical Source - (Prime System)
Corrective Maintenance PS/E Technical Manual GPETE Requirements Preventive Maintenance PMS/MRC GPETE Requirements Technical Approach - (Prime System) Quantitative (Operational Limits) Qualitative (Functional Limits) Technical Community Fleet Maintenance & Training Activities SURFMER Maintenance Engineering SYSCOM & ISEA Program Offices Calibration Program Offices Regional Maintenance Activities 2
9
Implementation New/Upgrade PS/E Programs Legacy Systems
PM/ISEA Provides Measurement Requirements TMDE Program Aligns Measurement Requirements to Standard Model (SCAT) Incorporate Results in the TMDE Index Legacy Systems TMDE Program Gathers Measurement Requirements Confirm Requirements through Fleet/ISEA/PM 2
10
Application Supports Program Budget Process TMDE Index Support
Aligns Annual Outfitting Requirements to Sponsors Supports Justification for Standardization Budget Wedges TMDE Index Support PS/E Measurement Data Documented in TMDE Index Data Review & Update Process PS/E & GPETE Configuration Reporting Shared Life Cycle Support Data Supports Definition of NAVSEA Measurement Requirements Specification & Program GPETE Acquisition Efforts Supports NSWC Det Earle Allowance Determination & Inventory Management Supports NSWC Corona Calibration Program Supports GPETE Retirement Planning Supports Annual GPETE Maintenance Planning 2
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.