Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Corporation of the Town of Amherstburg Public Works Department March 21, 2012 2012 CAPITAL BUDGET.

Similar presentations


Presentation on theme: "The Corporation of the Town of Amherstburg Public Works Department March 21, 2012 2012 CAPITAL BUDGET."— Presentation transcript:

1 The Corporation of the Town of Amherstburg Public Works Department March 21, 2012 2012 CAPITAL BUDGET

2 MISCELLANEOUS EQUIPMENT Tri-Axle Dump Truck (Sludge Truck)$ 200,000 Flatbed Truck w/ Cabinets & Habib Crane $ 90,000 1.5 Ton Dump Truck w/ Plow & Salter$ 75,000 Service Van – Water & Wastewater$ 45,000 Laser Survey Level$ 4,000 Weather Stations (2 per year)$ 3,500 $ 417,500

3 ROADS DEPARTMENT 3 rd Conc. N. Resurfacing – Phase 2 of 2 $ 520,000 6 th Conc. N. Resurfacing – Phase 1 of 2 $ 387,000 Tar & Chip Program (miscellaneous roads) $ 100,000 Cherrylawn Cres. Resurfacing $ 85,000 Thomas Road PWD Yard – Asphalt Yard Waste Area $ 65,000 Rehabilitation of Alma & Pickering Traffic Signals $ 50,000 Traffic Control Cabinet Replacement – Pickering & Sandwich $ 45,000 Installation of 5 Streetlights on Texas Road $ 3,000 $ 1,255,000

4 ROADS DEPARTMENT - BRIDGES Bridge over River Canard at 8 th Conc. Rehabilitation$ 65,000 Bi-Annual Bridge Inspection$ 20,000 $ 85,000

5 SANITARY SEWER COLLECTION SYSTEMS King Street Sanitary Sewer Renewal$ 235,000 $ 235,000

6 SANITARY TREATMENT SYSTEMS Amherstburg Wastewater Treatment Plant Expansion $ 2,113,740 and Upgrades (Project Value $34,139,569 – 2.5 year project) Existing Amherstburg Wastewater Treatment Plant Connection of Edgewater Lagoon System to Plant $ 1,600,000 Replacement and Maintenance of Equipment $ 82,000 Boblo Wastewater Treatment Plant Replacement and Maintenance of Equipment $ 61,000 Continued next slide…

7 McGregor Wastewater Lagoon System Lucier Estates Pump Station Upgrades (Work in Progress) $ 525,000 Cleaning of Sediment in Cell 2 or 3 (Work in Progress) $ 225,000 Replacement and Maintenance of Equipment $ 26,000 Edgewater Wastewater Lagoon System Replacement and Maintenance of Equipment $ 28,000 McLeod Wastewater Lagoon System Replacement and Maintenance of Equipment $ 25,000 TOTAL ALL SANITARY TREATMENT PROJECTS $ 4,685,740 SANITARY TREATMENT SYSTEMS (Cont’d)

8 WATER DISTRIBUTION SYSTEM Fryer St. & Lowes Sdrd. Watermain Installation $ 460,000 – Pickering to Lowes & Fryer to Sandwich Meloche Rd. & Lowes Sdrd. Watermain Installation $ 315,000 North Sideroad Watermain Upgrade $ 230,000 Automatic Radio Meter Reading Program $ 200,000 Smith Industrial Watermain Looping$ 175,000 Hamilton/Wilkinson Crt. Watermain Upgrade $ 160,000 Water Meter Replacement Program $ 70,000 Malden Centre Watermain Lowering$ 13,000 $ 1,623,000

9 AMHERSTBURG WATER TREATMENT PLANT Upflow Clarifier Cover$ 450,000 Construction of New Clarifier – 2-year project$ 175,000 Low Lift Pump Upgrade$ 100,000 SCADA System Implementation$ 100,000 Replacement of 2 Control Valves$ 60,000 Roof Repairs$ 40,000 $ 925,000

10 WATER TOWER Decommission and Demolish Old Water Tower on Alma Street $ 500,000 $ 500,000

11 2012 CAPITAL PROJECTS Wastewater Division $ 4,920,740 Water Division $ 3,048,000 Roads Division $ 1,340,000 Miscellaneous Equipment$ 417,500 Total 2012 Capital$ 9,725,500


Download ppt "The Corporation of the Town of Amherstburg Public Works Department March 21, 2012 2012 CAPITAL BUDGET."

Similar presentations


Ads by Google