Download presentation
Presentation is loading. Please wait.
Published byMorgan Pitts Modified over 9 years ago
1
Cosalt/Bexco Offshore Mooring Systems Shell Buoy Mooring Workshop Single Point Moorings Mark Brooks IEng MIIE Business Development Manager 29 th March 2005 Singapore for operational performance, reliability, safety & on-time delivery
2
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery The major business activities of Cosalt: safety & protection Rope – Fibre, Wire & Combination Rigging & Lifting Marine Safety Equipment Life Saving Appliance Servicing Fire Fighting & Inspection “the complete marine service provider”
3
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Cosalt: safety & protection Cosalt plc turnover ~ £Stg 151 million Cosalt: Safety & Protection ~ £Stg 35 million 18 UK Businesses in port based locations The markets of Cosalt: safety & protection
4
Major Rope Constructions 3-Strand 6-Strand Circular Braided - Ultraline 8-Strand 12-Strand Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Double Braided (2-in-1)
5
Fibres & Ranking Polypropylene Polyester / Nylon Aramid UHMPE Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
6
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Rope Properties – Wear & Tear Testing rope wear is always machine dependent Tests can be used to rank materials & rope constructions Static load rope on metal
7
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Yarn on Yarn or Rope on rope long lengths chafing against each other: -type of wear (abrasive, melting) -environment (dry, wet) Yarn on metal or Rope on metal long lengths chafing over an object: -type of wear (abrasive, melting) -environment (dry, wet) -protection rope on rope rope on metal Rope Testing - Abrasion
8
Marine Finish is used to improve the Safe Working Life in marine environment Test conform ASTM D6611-00 Marine Finish Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
9
Advantages of 8-strand rope: + efficient construction + torque-free + easy to handle + easy to splice Points of attention: - yarns can be pulled - in winching: only on a split drum 8-Strand Multiplait Rope Construction Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
10
Advantages : better abrasion resistance; smooth surface (strands/yarns will not get caught easily) rope is round : visual aspect easy to use on the winch (no burying because of round construction) non-rotating endless ropes possible very easy to splice ideal for lifting with free end (non rotating + round) 12-Strand Multiplait Rope Construction Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
11
Ultraline Construction Rope Construction Typical penetration of UV into rope is 1-2 mm cores cover - Cover not only protects against abrasion, but also UV - Small repairs are possible if inner strength has not been ccompromised – strength will not be affected. - All rope strength is contained within central cores. Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
12
Double Braided Construction Rope Construction - Strength is shared 50/50 between braided core and braided cover / sheath - Most common type of rope used for SPM mooring hawsers Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
13
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery OCIMF GUIDELINES Type approval of nylon SPM Hawsers is conducted under the OCIMF 2000 Guidelines, 1 st Edition Major Difference between OCIMF 1987 and OCIMF 2000 Number of tests required Should be repeated every 5 years Larger than 20” ropes are to now be tested Quantification of the behaviour of the marine finish
14
TCLL values (8 strand): polypropylene52% polyamide (standard)55% steel (laid)60% polyester70% Ultraline® Nylon75% Double Braid Nylon75% Deltaflex80% Dyneema> 100% Oil Companies Int. Marine Forum standard fatigue test TCLL is an accelerated fatigue test to obtain a quick comparison between ropes and materials Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
15
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Typical SPM Assembly - Buoy / FPSO Chafe Chain - Heavy Duty Shackles - Rope Thimbles - Mooring Hawser - FPSO / Shuttle Tanker Chafe Chain - Support Buoy / Pick-up Buoy - Pick-up Ropes / Messenger Lines - Load Monitoring Systems
16
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Buoy / FPSO & FPSO / Shuttle Tanker Chafe Chains - Vetted & approved suppliers only - ISO 9001/9002 - Close working partnership - Majority is European Manufacture / Far Eastern can be supplied if requested - Production Range 16mm - 120mm Diameter in various grades - Laboratory & testing facilities
17
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Heavy Duty Shackles & Thimbles - Vetted & approved suppliers only - ISO 9001/9002 - Close working partnership - European Manufacture - Laboratory & testing facilities
18
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Heavy Duty Shackles - Forged alloy steel - Finish painted / Galvanised - Double nuts & S/S cotter pins - MBL is 5 x SWL
19
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery SPM Cast Thimble - High strength cast corrosion resistant steel (Galvanised) - Stainless steel - Shackle retaining bar
20
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Tubular Thimble - Fabricated construction - Mild steel - Finish galvanised / plastic coated
21
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Bellmouth Thimble - Reusable - Mild steel (galvanised) - Stainless steel
22
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Mooring Hawsers - Manufactured by BEXCOropes - All hawsers supplied manufactured & supplied to OCIMF 2000 - Over 8 years experience, SPM hawsers - Reference history Selection of mooring hawser - Repeat loading - OCIMF TCLL value - Abrasion resistance - Energy absorption Constructions available - BL3 Ultraline Nylon - DB12 Double Braid Nylon - DF8 Deltaflex Composite Enhancements - PU coating - Additional protection sleeves - Tubular rope floats
23
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Support Buoy / Pick-up Buoy - Vetted & approved supplier only - Close working partnership - UK Manufacture Cylindrical Chain Support Buoy - Central steelwork - Galvanised swivel ends - Resiliant closed cell foam
24
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Support Buoy / Pick-up Buoy - Vetted & approved supplier only - Close working partnership - UK Manufacture Cylindrical Through Chain Support Buoy - Through steel tube - Chain lock plate one end - Resiliant closed cell foam
25
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Support Buoy / Pick-up Buoy - Vetted & approved supplier only - Close working partnership - UK Manufacture Pick-up Buoy - Fixed eye each end - Central steelwork - Resilient closed cell foam
26
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Pick-up Ropes / Messenger Lines - Nutech brand - High strength co-polymer yarn - High visibility yellow colour* - Permanent flotation - SG 0.91 - Non-rotating, torque-free rope - Fully UV stabilised - Excellent abrasion resistance - Flexible, easy to handle & splice * other colours available on request Available in 8 or 12 strand construction Also available SPUNSTAPLE POLYPROPYLENE
27
Components Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Load Monitoring Systems - Vetted & approved suppliers only - ISO 9001/9002 - Close working partnership - European Manufacture - Laboratory & testing facilities Benefits of Load Monitoring - Safe operation - Hawser life prediction - Optimise hawser service life - ‘Bells & whistles’!!
28
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Mooring Hawser Supply Manufacturing hawsers since 1997 Active Areas / Representation
29
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Facts & Figures OCIMF recommend under 150,000 dwt can use 1 mooring hawser, over 150,000 dwt generally use 2 mooring hawsers (unless FSO / FPSO) OCIMF recommend a list of spares that operators should keep at the terminal - mooring hawsers 200% - chain support buoys, shackles, thimbles & links 100% - hawser floats 100% - messenger / pick-up lines 200% - marker buoys 100% Mooring hawsers are typically changed every 9 / 18 months service - other methods for retirement, 2000hrs service, 40/50 moorings, LMS looking at peek loads
30
Operation & Maintenance Guidelines Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery “To achieve optimum life operators need to develop inspection, handling and maintenance procedures based on local conditions” We are here to help you with this IF THERE IS ANY DOUBT ABOUT THE CONDITION OF A ROPE IT SHOULD BE REJECTED
31
Operation & Maintenance Guidelines Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery General Maintenance - Marine growth & oil contamination - Hawser - Floats Preventative Maintenance - Storage - Unpacking
32
Operation & Maintenance Guidelines Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Operation - Preparation for berth - Inspection - Mooring - Unmooring [Cast-off]
33
Operation & Maintenance Guidelines Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Monthly Inspection - Hawsers - Floats - Buoys - Chains - Messengers Visual examination - Abrasion - Overload or flex fatigue - Splices - Diameter Visual examination - Ripped / damaged floats - Missing floats Visual examination - Integrity of buoy - Punctures / dents - Buoyancy Visual examination - Diameter - Loose / missing studs - Cracks Visual examination - Abrasion - Cut strands - Splices - Eye protection
34
Reasons to use us Proven Leading Companies – International Reputation Quality Control – ISO 2000 / ISO 9001 Accredited Product Reliability – Warranty / Financial Stability Operational Safety – Track Record After Sales Support – Technical Expertise Rigging Services – Inspection / Testing / Training Working partnerships with leading – Cost effective European Hardware manufacturers Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery
35
Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Supporting Documentation FactFile [Bulletin No.14] Offshore Mooring Systems “Total System Management” also on CD-Rom Offshore Mooring Systems www.cosalt.co.uk / www.bexco.be
36
Cosalt International Limited Fish Dock Road Grimsby N.E. Lincolshire DN31 3NW United Kingdom Telephone 44 (0) 1472 504258 Facsimile 44 (0) 1472 504257 e-mail: rope@cosalt.co.uk Cosalt/Bexco Offshore Mooring Systems for operational performance, reliability, safety & on-time delivery Any questions? Photographs courtesy of Bluewater Engineering BV & Geolitel Corporation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.