Download presentation
Presentation is loading. Please wait.
Published byDonald Mark Harmon Modified over 9 years ago
1
Town Meeting Presentation October 29, 2012 Randall Library Building Committee
2
Committee Members: Steve Dungan Steve Jelinek Tom Lam Peter McManus Administrative Assistant: Susan McLaughin Consultants: Johnson and Roberts Associates Stewart Roberts Phil O’Brien Tim Reed, Chairman Jim Salvie Barbara Wolfenden
3
Why Change? Water leaks into building during heavy rains. Water damage to the structure requires repairing corroded metal braces holding up the patio and rotted 2x4’s holding up the brick walls. Handicap access is dangerous. Very crowded conditions on the first floor. Only one small workroom for storage and materials preparation.
4
Why Not A New Library? Cost would be in the 7 to 12 million dollar range. No available site near the center of town. Feedback from residents indicates a very strong desire to keep library in its current location. Would leave vacant existing library building.
5
Why Not Move to Pompo Move to Pompo was extensively explored. Space requirements to receive state library construction grant would take too much space. Time to acquire construction grant would leave a large section of Pompo vacant for 5 to 10 years. Residents want library to stay where it is.
6
Randall Library Needs Water leak remediation Better handicap access Additional storage and work spaces Separate adult section with area for reading and working Separate young adult section with areas for studying and tutoring Separate children's section Restoration of original building Additional parking
8
Design Study Results Structural analysis of the building found the original 1892 building in pretty good shape but in need of some restoration and repair. Structural analysis of the 1975 addition found that that it was the kind of construction that had a useful life of about 20 to 30 years. The 1975 addition is in need of structural repairs. No second floor area of the current library is structurally capable of supporting full library book stacks.
9
Why Not Renovate the 1975 Addition? Even with a renovation, the building will eventually start leaking again. The quality of the construction being as it is, there will be ongoing maintenance costs. The 1975 addition will have to be replaced eventually. All library book stacks will have to remain on the first floor. Patrons with access issues will still have to use the street to go from the handicap parking space to the handicap entrance.
10
Proposed Renovation/Addition Designs
11
1975 additionProposed Addition
16
First Floor Scheme Young Adult Section Main Entrance Director’s Office Work Room Librarian’s Desk Elevator Children’s Desk Children’s Section
17
Second Floor Scheme Adult Book Stacks Computer Stations Librarian Station Elevator Periodicals Meeting Room
18
Parking Scheme
21
How Does Stow Compare with Other Communities? Boxborough 12,000 sq ft Maynard 24,300 sq ft Bolton 16,945 sq ft (up from 3,100 sq ft) Harvard
22
Annual municipal appropriation: Carlisle $511,586 Harvard$511,238 Sherborn$384,844 Bolton$373,094 Boxborough$298,377 Stow$200,601 FTEs: Harvard9 Carlisle7.7 Bolton6.2 Sherborn4.8 Boxborough4.5 Stow3.3 Stow Comparisons with Other Towns FY11
23
Age19902000201020202030 00-04421510473515556 05-09378470330303320 10-14380442599582616 15-19367335493482472 20-24310156171162146 25-29284200163186170 30-34437375233272269 35-39547615334302339 40-44579615591462544 45-49485534749608586 50-54355505855874760 55-59268393533660573 60-64150267446612634 65-69117188200308388 70-748599113191243 75-79708889119175 80-85426273 124 85+5348606274 TOTAL5,3285,9026,5076,7756,990 Population Projection by Age Group – Prepared by MAPC Stow Population Projections
24
Renovation and Addition Proposal Project Cost is 3.7 million dollars. Project cost does not cover new furniture or computers. Over $700,000 qualifies for possible CPA funds. Estimated annual cost for the average household is $75. Tonight you are voting on just the construction design phase of the project. The cost for this phase is $300,000.
25
Why Support Proposal Now? The 1975 addition will have to be replaced. It is just a matter of time. If it isn’t replaced there will be yearly maintenance costs which will depend on what part of the addition fails in a give year. The $75 per average household per year will only increase if the project is delayed. Interest rates will not get lower and construction costs will get higher. A four year delay will push the project costs to 4.3 million dollars.
26
Allows for safe handicap access. Eliminates water leaks. Increases the number of computer stations. Creates a separate adult section. Reduces annual maintenance costs. Restores and renovates a town icon. Project Summary
27
Please Vote to Support Your Library
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.