Weekly Advisor Meeting November 13, 2013
2
Basic LED visual indicator circuit designed ◦ Red (>1.65V) ◦ Yellow (>2.25V, >2.35V) ◦ Green (>2.45V, >2.55V) Cap overvoltage protection parts chosen 1.8V and 3.3V boost power supply designed ◦ Both operational when cap voltage > 1.2V All parts ordered, arriving Thurs Will be built this weekend Possible 5V supply for next semester November 13, 20132
3
Steel hand crank fixture made Gear analysis ◦ Stress factors ◦ Material strength ◦ Intermediate ratios ◦ Fewer gears, better efficiency Gears are expensive ◦ Current best option: Amazon (~$180) ◦ 3D printing ($5/in^3) Gears, shafts, pillow block mounted bearings to be ordered ASAP November 13, 20133
4
Wooden frame built for mounting gears onto Approx 36”x20”x18” Not concerned with turnstile shape yet Cross supports will be added once gears have been chosen November 13, 20134
5
Test system needed to determine efficiency Energy in: Energy out: W= (CV^2)/2 Efficiency is the ratio between them November 13, 20135 Turnstile arms Pulley Hanging mass
6
Figure out what we need to test system Assemble circuits (Est. 3+ hours) Select gears Purchase gears Mount gears/shafts onto frame Measure efficiency Assignments... November 13, 20136
7
Individual build summary paper (11/14) Two weeks exactly until final report (11/27) Thanksgiving break – no weekend meeting Final presentations begin (12/3) Final poster (12/4) Poster competition (12/5) Establish website presence Next Semester – switch to ECE requirements ◦ No more weekly papers November 13, 20137
8
Time to ship, build, and test before final report Funds quickly decreasing Prof. Sup: choosing optimal motor speed Prof. Sup: design not complex enough No time to recover if parts don’t fit together November 13, 20138