Download presentation
Presentation is loading. Please wait.
Published byAustin Roberts Modified over 9 years ago
1
By CA. Pankaj Deshpande B.Com, FCA, D.I.S.A. (ICA) 1
2
An activity covering all the steps required to be carried out to generate the desired result from the ERP System. 2
3
Why does ERP Implementation Fails ? 3
4
How the users explained their requirements. 4
5
How the project leader understood it. 5
6
How the analyst designed it. 6
7
How the business consultant described it. 7
8
How the programmer wrote it. 8
9
How the project was documented. 9
10
What operations installed. 10
11
How the customer was billed. 11
12
How it was supported. 12
13
What the customer really needed. 13
14
14
15
Need Assessment Building In-house Implementation Team ERP System Evaluation and Selection Preparation for Change Data Preparation ERP Implementation Testing Training & Educating Go Live On Going Support 15
16
Identify the core areas Set Priorities Standardize processes Remove hurdles 16
17
In House team of experts, With a leader, Having clear goal, And a dead line 17
18
Evaluate the available ERP systems with respect to business requirements. 18
19
It is just like marriage. 19
20
20
21
21
22
Reliable As per our requirement User Friendly Versatile Fast Intelligent Beautiful Compatible Cost Effective 22
23
Handling emotions of users. 23
24
All existing data may not, cannot, should not, need not be transferred to new system. Prepare the data that shall be transferred to new system. E.g. Old customer who are no more dealing with us now, Old stock items. 24
25
Its time to configure, install and activate the system. There may some deviation from planning while implementing. Core areas and set priorities must be kept in mind. 25
26
By Implementers By In house implementation team By actual users 26
27
As per need of each / group of users at each level. 27
28
Its time now to start actual working with the system. 28
29
Continuous support is needed for – ◦ Troubleshooting ◦ Upgrading ◦ Training 29
30
30
31
Before Implementation During Implementation After Implementation 31
32
Understanding Requirements Evaluating the software/vendor Resource Planning Risk Assessment 32
33
Ensuring Master Data Integrity. Review of internal control system. Security Assessment Assessment of Changes Verification of output with respect to input. Verification of audit trails Training 33
34
System Security Audit Identifying areas for improvement Training System Performance Evaluation Verification of internal control Verification of data integrity 34
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.