1 By CA. Pankaj Deshpande B.Com, FCA, D.I.S.A. (ICA) 1

2  An activity covering all the steps required to be carried out to generate the desired result from the ERP System. 2

3  Why does ERP Implementation Fails ? 3

4  How the users explained their requirements. 4

5  How the project leader understood it. 5

6  How the analyst designed it. 6

7  How the business consultant described it. 7

8  How the programmer wrote it. 8

9  How the project was documented. 9

10  What operations installed. 10

11  How the customer was billed. 11

12  How it was supported. 12

13  What the customer really needed. 13

14 14

15  Need Assessment  Building In-house Implementation Team  ERP System Evaluation and Selection  Preparation for Change  Data Preparation  ERP Implementation  Testing  Training & Educating  Go Live  On Going Support 15

16  Identify the core areas  Set Priorities  Standardize processes  Remove hurdles 16

17  In House team of experts,  With a leader,  Having clear goal,  And a dead line 17

18  Evaluate the available ERP systems with respect to business requirements. 18

19  It is just like marriage. 19

20 20

21 21

22  Reliable  As per our requirement  User Friendly  Versatile  Fast  Intelligent  Beautiful  Compatible  Cost Effective 22

23  Handling emotions of users. 23

24  All existing data may not, cannot, should not, need not be transferred to new system.  Prepare the data that shall be transferred to new system.  E.g. Old customer who are no more dealing with us now, Old stock items. 24

25  Its time to configure, install and activate the system.  There may some deviation from planning while implementing.  Core areas and set priorities must be kept in mind. 25

26  By Implementers  By In house implementation team  By actual users 26

27  As per need of each / group of users at each level. 27

28  Its time now to start actual working with the system. 28

29  Continuous support is needed for – ◦ Troubleshooting ◦ Upgrading ◦ Training 29

30 30

31  Before Implementation  During Implementation  After Implementation 31

32  Understanding Requirements  Evaluating the software/vendor  Resource Planning  Risk Assessment 32

33  Ensuring Master Data Integrity.  Review of internal control system.  Security Assessment  Assessment of Changes  Verification of output with respect to input.  Verification of audit trails  Training 33

34  System Security Audit  Identifying areas for improvement  Training  System Performance Evaluation  Verification of internal control  Verification of data integrity 34