Task 5: Layered Formations Workshop Littleton, CO April 25 and 26, 2000.

Similar presentations


Presentation on theme: "Task 5: Layered Formations Workshop Littleton, CO April 25 and 26, 2000."— Presentation transcript:

1 Task 5: Layered Formations Workshop Littleton, CO April 25 and 26, 2000

2 Objectives åReview entry effects in layered media, during PWRI, due to formation property variation, such as permeability- dependent plugging. åEvaluation of the role of layering on fracturing efficiency and propagation. åContainment concepts need to be evaluated. åBoth matrix and fracturing situations need to be considered.

3 Issue 1: Crossflow å"Crossflow is a big issue for MOC. It is important to carefully define the crossflow environment that you are considering." åThere is wellbore crossflow (Heidrun). åThere is near-wellbore crossflow (close to or immediately behind pipe). There are consequences for injecting and for ultimate recovery by misdirecting flow. åThere is far-wellbore crossflow, occurring deeper in the reservoir. Injectivity and ultimate recovery should not be divorced. åDifferent wellbore scenarios and completions methods that affect/control/improve recovery.

4 Issue 2: Pressure Transient Interpretation åEhlig-Economides and Joseph (1987) åKuchuk et al (1986) åOvens (various publications)

5 Issue 3: Field Procedures åSpeculated that behavior during produced water injection could be used as a conformance diagnostic. å"How do you control the well during its life?" Part of this relates to starting the operations out correctly! å"Are there situations where mechanical differences between formations can be overcome without using mechanical means for isolation? If so, how are these differences overcome?"

6 Issue 3a: Control Methods åThermal pre-conditioning åFormation pressure pre-conditioning åTortuosity åPerforating: BLANKET PERFORATING SHOULD NOT BE USED åPerforating: DEMONSTRATED THE IMPORTANCE OF CLEANING UP PERFORATIONS. åPerforating: Balance?

7 Issue 3b: Control Methods A methodology for a formation breakdown was presented. Cleaning perforations with backflow. The correct perforation strategy was indicated to be important, as well as drilling. Inject at a rate for zero skin at fracturing pressure. The well will thermally fracture but you are still injecting below frac gradient. Inject at a constant rate at the uncooled fracturing pressure. If you do not know what this rate is, you need to do a SRT. Preferentially grow a fracture in one area without pressure being high enough to initiate fracturing elsewhere.

8 Issue 3c: Control Methods Sometimes mechanical methods may be only option. Thermal fracturing. Hybrid methods. For A High Angle Well, There Is A Minimum Rate For Cooldown And A Maximum Rate To Avoid All Of The Fluid From Going Into One Fracture. Seawater flushes Low-cost smart wells

9 Issue 3d: Control Methods "TO SEAL A HYDRAULIC FRACTURE IT IS NECESSARY TO PUT IN GEL AND TO FOLLOW THIS WITH SOMETHING TO PLUG THE PERFORATIONS (for example, CaCO3).” Bacteria (membrane technology). Cases shown where THERMAL FRACTURING IMPROVED THE INJECTION PROFILE. Nonconventional fracturing Dual strings, nulilaterals, individual wells, wandering wells Sweep the high permeability and then flood it to pressurize the low permeability zone Multiple injection fluids

10 Issue 4: Prediction Methods for predicting and inhibiting height growth GOHFER Warmback Other Monitoring

11 Issue 4b: Prediction Matrix flow in n layers Wellbore Crossflow Compartmentalization

12 Issue 4c: Prediction Where do the solids go??? What zones are most damaged?

13 Issue 5: Generic Cases Avoidance, Mitigation

14 Action Items 1. Summary of injection plugging relationships (lessons learned and experience factor). 2. Experience within the four generic layered formation cases, including the type(s) of completions and fluids considered or used. 3. Discussion documents from this workshop. 4. Within the data that are available, summarize what the data shows. Is there data that can be used that, for example, shows that water quality influences entry? 5. Revise the matrix model and circulate. 6. Crossflow models as a diagnostic for compartmentalization. 7. PEA-23 - Revisit the laboratory data regarding where the solids go.

15 Task 1: Monitoring Workshop April 27 and 28, 2000

16 Objectives Monitoring and diagnostic methods for injectors have not developed at the same rate as for producers. One reason is that hydraulic fracture closure during testing can complicate interpretation. PREDICTION. Just how good are available models. There are a number of codes around. It is important to identify the processes that need to be legitimately included in these predictive models. In addition to the modeling audit, an inventory of monitoring methods, citing limitations and applications, was requested.

17 Objectives Procedures for fracture injector interpretation. Falloff testing was indicated to be not completely accurate (closure during testing). What are the preferred test protocols and what data are required. Best Practices is a major goal - e.g. describe procedures for a multi-rate PLT followed by a falloff. What are the gaps in the methodologies and how can you optimize cost? Environmental issues - zero emission well testing.

18 Fractured Injector Well Test Gap Analysis 1. Inadequate representation of dynamic fractures, during falloff. 2. Single zone and single frac. 3. Single frac and multi-layered (height/length recession). 4. Single zone and multiple fractures (co-located or displaced). 5. Multiple zone and multiple fractures. 6. Pressure-dependent permeability. 7. Radial and linear composite reservoir interpretation when there is a fracture present.

19 Models What is it that really needs to be included in models, particularly in terms of storage? What steps are required to improve techniques and tools for measurement, surveillance and prediction? Are there improved methods for evaluating multilayered reservoirs? E.g. flow profile along with falloff. Need to do measurements in individual layers.

20 Models Fractured Injector Well Tests: What is the right protocol? For example, if you shut-in and do the SRT, it may be different than if you are injecting. A list of what should be done was requested. People should look in their own companies for forgotten/obsolete well test software that may be of value.

21 Models There is nothing? specifically available for falloff test analysis in fractured injectors. It was indicated that there was no commercial code available for it. Raise it at the next steering committee meeting and retain a third party to evaluate this. This is an urgent action item.

22 Fractured Injector Well Test Gap Analysis Action Items 1. Allocation of JV funds for external party, if necessary. 2. Survey operators for methods being used and data.

23 Methods (Microseismic) Shear versus hydraulic fractures Permeability enhancement

24 Methods (Microseismic) Depths of interest? The signatures, to tell you more about what the signals mean (origin)? What have people tried to do for reprocessing microseismic data to highlight events localized to the fracture? Gas versus oil reservoirs What are the current limitations. “indicated that if the Sponsors see a need for this technology to mature, maybe able the JIV should give direction to appropriate organizations.” MAJOR FOCUS ON WATERFLOODS. Tomographic applications.

25 Methods (Tiltmeter) Key Restriction of Current Technology is Application in High Angle and Horizontal Well Using the technology in the same well in deviated and horizontal situations. Deviation and coupling with the formation are relevant and it would be reasonable to encourage the industry to accelerate current methods for doing this. Sponsors requested a review of what is currently the status of same-well tiltmeter usage.

26 Methods (HIT)

27 What is the response is if the fracture is partially filled with plugged material. Falloff and HIT used together. Maybe they will only delineate the same leakoff area; however, the combination could be more useful if there are dramatic length differences. Fracture closure and what do we really measure.

28 Methods (HIT) How do you recognize height recession from HIT? Reflection coefficient interpretation would be better with higher frequency - a spread of frequencies, for example, a well defined signal -CHIRP - contains a frequency spectrum. An Action Item was to get clearance and analysis for releasing CHIRP data to the JIV and for the JIV to encourage the service industry to proceed forward with this technology.

29 Predictive Methods New directions Modified commercial reservoir simulators Disposal Domain Concept

30 Action Items 1. Disposal Domain Spreadsheet 2. SPE Produced Water Reinjection Guidelines. - how the disposal domain mechanism impacts height growth - containment and storage. 3. The PEA-23 block test information needs to be put on the web site.

31 Action Items Layered and Monitoring Tasks: Polling the Operators on what is their philosophy for mechanical control - for current service and for produced water. Maersk has thought about the design issues for robust service. What about smart wells for injectors? "Review of Operators on the Control Side for Layered or High Angle Wells - Monitoring and Responding."

32 Action Items 4. "Is the JIV at the point where it needs to decide about a predictive tool?" Presuming that the disposal domain concept is reasonable, there may be a picture (semi- quantitative) of how injection growth occurs. This item needs to be put on the steering committee agenda. Preferably the model would be a spreadsheet approach. Individual modules could be built and subsequently put together or, at the end of the JIV, a third party could be chartered to put them together. The current contractors would have right of first refusal to develop this unified package. The four options that could be proposed at the Steering Committee Meeting are 1) adopt the spreadsheet and do nothing else, 2) is anyone in the contractor group willing to take this on and go forward - either funded or 3) licensed, or 4) finally give it to an external party. Agenda Item for the Steering Committee Meeting.


Download ppt "Task 5: Layered Formations Workshop Littleton, CO April 25 and 26, 2000."