Download presentation
Presentation is loading. Please wait.
Published byAmbrose Sullivan Modified over 9 years ago
1
Delta Day 1
2
High Voltage VCB Switch Open
3
High Voltage VCB Switch Open
4
High Voltage Cable
5
Briefing Officer
6
Airtight Cave
7
6
8
Place on back of placard # 6
9
BC
11
Caved
13
Temporary Stopping
14
Battery Phone
15
BC
16
East Mains Belt Tail
17
3 South belt drive
18
4.9 % CH4 10 PPM CO 19 % O2
19
Airtight Cave
20
Airtight Cave
21
4.9 % CH4 10 PPM CO 18 % O2
22
Airtight Cave
23
Airtight Cave
24
Refuge Alternative
25
Purge Valve
26
Door Closed
27
Door Closed
28
Live Conscious Miner 27
29
“Help” Place on back of placard 27
30
5.1 % CH4 10 PPM CO 19.6 % O2
31
Barricade
32
0.5 % CH4 100 PPM CO 17.5 % O2
33
Live Unconscious Miner
34
Face
35
Unsafe Roof
36
Unsafe Roof
37
Temporary Stopping
38
Overcast Wall With Door Open
39
Overcast Wall
40
3 Timbers
41
Unsafe Roof
42
High Voltage Cable
43
Power Center
44
Line Curtain
45
Water Knee Deep
46
Water Knee Deep
47
Battery Scoop Can Not Move
48
Water Knee Deep
49
5.1 % CH4 10 PPM CO 18 % O2
50
Barricade
51
Temporary Stopping Not Intact
52
Body
53
Face
54
0.2 % CH4 15 PPM CO 20.5 % O2
55
Temporary Stopping
56
0.2 % CH4 52 PPM CO 19.4 % O2
57
4.0 % CH4 100 PPM CO 15 % O2
58
Smoke End of Smoke
59
1.5 % CH4 352 PPM CO 14 % O2
60
BC
63
Smoke End of Smoke
64
Fire Cannot Be Extinguished
65
Fire Cannot Be Extinguished
66
Smoke End of Smoke
67
2.5 % CH4 500 PPM CO 10 % O2
68
Face
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.