Western Wind Transmission Ronald L. Lehr AWEA Western Representative 4950 Sanford Circle West Englewood, CO 80110 303 504 0940.

Similar presentations


Presentation on theme: "Western Wind Transmission Ronald L. Lehr AWEA Western Representative 4950 Sanford Circle West Englewood, CO 80110 303 504 0940."— Presentation transcript:

1 Western Wind Transmission Ronald L. Lehr AWEA Western Representative 4950 Sanford Circle West Englewood, CO 80110 303 504 0940

2 Wind Situation New generation 90% + natural gas Gas prices high, volatile Coal environmental risks, timing Public, policy support for wind Wind costs continue to decline Wind PPAs offer firm prices

3 38 cents/kWh Reduced Cost Driving Wind’s Success 2.5-3.5 cents/kWh Levelized cost at excellent wind sites in nominal dollars, not including tax credit

4 Transmission for Wind Build case for needed transmission investments Transmission Planning: study and report Consider all transmission alternatives 1. Use existing transmission SSG-WI constraint data shows physical capacity available 2. Upgrade existing transmission routes 3. Plan new transmission routes

5 Wind Development Issues: Grid Operating Rules What wind wants: appropriate access to grid operations Liquid, transparent spot imbalance settlement markets Near real time, flexible scheduling protocols. Robust secondary markets in transmission rights (“flexible firm”). Postage stamp pricing paid by load (or volume pricing). Statistical determination of load shape conformance What wind gets: rules deny merchant wind access to interstate commerce System designed exclusively for firm, fixed blocks and commodity strips. Rigid scheduling protocols, onerous imbalance charges. License plate pricing paid by new generation. Grid balkanization and rate pancaking. Mature path to market is a long way away. Some policy acceleration will be required.

6 Wind Development Issues: Transmission Expansion What wind wants: transmission that includes wind Pro-active regional planning with political buy-in. Programmatic expansion focused on shared goals. Public infrastructure financing repaid through user fees. What wind gets: too little, too late Reactive, piecemeal gridlock decoupled from political process. Project specific expansion focused on immediate needs of existing players. Uncertain capacity rights as sole rate recovery mechanism. Mature politically anchored regional planning process is a long ways away. Some policy acceleration will be required.

7 Wind Regulatory Agenda Accelerate RTO formation. –Larger control areas and markets. –No pan caking transmission fees. –Governance process to hear and resolve complaints. –Coordinated transmission planning and expansion. Action from FERC to adopt best practices. –Legislative direction. –Key off best tariff filings, RTO policies. Broaden trader and marketer participation

8 Interior West Clean Energy Plan John Nielsen Western Resource Advocates Ronald L. Lehr AWEA

9 Study Objectives Aggressive but feasible long-term clean electric energy plan for the Interior West Identify the public policies and business strategies needed to implement the plan Engage energy decision makers across the region on adopting these policies and strategies Relative to BAU, Clean Plan will include: –Significantly increased reliance on RE & EE –Retires older, less efficient fossil resources now on the system

10 Who’s Involved Funding--Hewlett Foundation, DOE on transmission issues Project Team: WRA, Synapse Energy Economics, Tellus Institute, Ron Lehr (NWCC, AWEA), grnNRG Advisory Committee –utility industry, independent power producers, renewable developers, PUC regulators, state energy office officials, environmental and clean energy advocates, DOE, NREL

11 Relationship of IWCEP to Other Regional Transmission Planning Activities WRAP AP2 Robust RE/EE Scenario Limited Transmission Modeling WGA Conceptual Plan Load Flow Transmission Modeling Limited RE/EE Scenario IWCEP Robust RE/EE Scenario More Detailed Transmission Modeling SSG-WI Load Flow Transmission Modeling Robust RE Scenario Load Growth Sensitivities to Serve as EE proxy

12 Geographic Detail Modeling trans areas Inputs developed at trans area level Results presented at the state and regional level Results available at trans area level

13 Renewable Resource Assessment Compiles best wind, solar, geothermal, biomass resource data GIS identifies: Best resource areas Inappropriate development areas Location of facilitating infrastructure like existing transmission lines and substations www.energyatlas.org

14 Renewable Capacity by Type & Location Clean Plan: 2020

15 309 TWh Generation Mix Seven Interior Western States Coal Nat. Gas Nuclear Hydro Renewables Other 2001 Clean Plan 2020 BAU 2020 423 TWh 330 TWh

16 Transmission Additions by 2020 Business-as-Usual vs. Clean Plan Clean Plan = 2,800 MWBAU = 10,000 MW

17 Conclusions Build the case for needed investment Study and report Consider transmission alternatives 1. Use existing transmission SSG-WI constraint data shows physical capacity available 2. Upgrade existing transmission routes 3. Plan new transmission routes Present business, policy case to decision makers

18 Contact Information John Nielsen Energy Project Director Western Resource Advocates 303-444-1188 x232 jnielsen@westernresources.org


Download ppt "Western Wind Transmission Ronald L. Lehr AWEA Western Representative 4950 Sanford Circle West Englewood, CO 80110 303 504 0940."