3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users Meeting – June 2009 Angel Olmos
2
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 2/33 OUTLINE ALBA OVERVIEW LIBERAS, SINCE 2nd USERS MEETING ALBA FAST ORBIT FEEDBACK BEAM POSITION MONITORS RF CABLES LIBERA ELECTRONICS FOFB NETWORK CORRECTION CALCULATION POWER CONVERTERS CORRECTOR MAGNETS
3
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 3/33 ALBA OVERVIEW SLS type Booster and SR share the same tunnel 100MeV Thales LINAC 7 out of 32 beamlines on day one 1 Bending 1 Wiggler 1 SC-Wiggler 2 IV-Undulators 2 Apple II Undulators Full energy 3GeV Booster
4
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 4/33 Schedule on August-06 Jun-08Building finished Nov-08Booster commissioning Mar-09SR commissioning during 8 months Oct-09Beamlines commissioning ALBA OVERVIEW Schedule on April-09 ?Building not yet finished 12months delay Jul-09Cooling available 13 months delay Oct-09Booster commissioning 11 months delay May-10SR commissioning during 2 months 14 months delay Sep-10Beamlines commissioning 13 months delay Beam for users, January 2011
5
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 5/33 Moving from University to ALBA site on April-09 ALBA OVERVIEW Where are we now?
6
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 6/33 ALBA OVERVIEW Where are we now? LINAC pre-commissioning done on Summer-08 Turn-key system from Thales LTB and LiDia CELLS responsability Temporally electricity and cooling Full commissioning TBD by fall-09
7
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 7/33 Service Area (electronic racks) and Experimental Hall finished ALBA OVERVIEW Where are we now? Cooling and Air conditioning pending Booster mechanical installation finished SR 8 out of 16 sectors installed Hutches and beamlines on the way Cabling campaign has started
8
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 8/33 OUTLINE ALBA OVERVIEW LIBERAS, SINCE 2nd USERS MEETING ALBA FAST ORBIT FEEDBACK BEAM POSITION MONITORS RF CABLES LIBERA ELECTRONICS FOFB NETWORK CORRECTION CALCULATION POWER CONVERTERS CORRECTOR MAGNETS
9
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 9/33 LIBERAS, SINCE 2nd USERS MEETING - Not much... that’s why I’m showing you other stuff - Two units (not really used) during LINAC pre-commissioning (release 1.8) LINAC synchronization problem Peak detector on Device Server for position calculation
10
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 10/33 - Development of a generic Matlab GUI for 2.0 Used for Lab testing of new SW releases LIBERAS, SINCE 2nd USERS MEETING
11
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 11/33 OUTLINE ALBA OVERVIEW LIBERAS, SINCE 2nd USERS MEETING ALBA FAST ORBIT FEEDBACK BEAM POSITION MONITORS RF CABLES LIBERA ELECTRONICS FOFB NETWORK CORRECTION CALCULATION POWER CONVERTERS CORRECTOR MAGNETS
12
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 12/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
13
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 13/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
14
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 14/33 BEAM POSITION MONITORS Beam Position Monitor block On chamber welded block including 4 button- type feedthroughs Feedthroughs and BPM blocks tested during different stages at factory and at site
15
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 15/33 BEAM POSITION MONITORS TDR head for reflection measurement 1- After manufacturing + Check manufacturing process + Calculate electrical behavior + Sort the buttons before welding 2- After welding on the BPM block + Prove that buttons are OK 3- After baking of the chambers + Final OK before delivery Buttons measurements at factory (FMB) Capacitance Dispersion < 1%
16
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 16/33 BEAM POSITION MONITORS - Offset due to non perfect buttons and their placement in the block holes - Measured by external means. No wired method possible S-paremeters measurement using a 4-ports network analyzer BPMs Electrical Offset measurement at site
17
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 17/33 BEAM POSITION MONITORS Processing of Tx coefficients H/V offsets Booster case Max offset kept below 150 µm BPMs Electrical Offset measurement at site
18
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 18/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
19
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 19/33 RF CABLES - First stage of semi-rigid PEEK dielectric cables being installed (as Soleil case) Tight space between magnets makes impossible to plug any cable without a pre-stage After chamber bakeout Chamber movement on top of half-opened magnets
20
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 20/33 - RF cables from the semi-rigids to the Liberas are on the way of production RF CABLES - 4 Andrew CNT-240 cables in a hosepipe (Copy+Paste cheap version of the commonly used Time Microwave LMR-240) - 5000m of cable ordered. Assembly of SMA connector to be done by cabling company
21
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 21/33 LIBERA ELECTRONICS - As said, not much has happened - Release 2.0 installed on 3 units but not yet tested - Last tested software release was 1.82 (the one on the installed units) - Matlab GUI for 2.0 developed but not really used - About TANGO device server... still “forking” on others job - Small pseudo-server developed for LINAC beam peaks analysis - HW installation of 120 Storage Ring units on the Service Area done - Only 12 of the 28 Booster units installed. The others kept for Lab testing - Report of failures/interventions: + Hardware patch (30). Ethernet cable length... Corrected + Wrong voltages (8)... not used on Libera + Out of specs on BCM (2) + Out of specs on TbT rms, low # ADCs (2) + Noisy channel (1) + PM buffer not triggered (1) Not corrected
22
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 22/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
23
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 23/33 Distributed architecture using 4 racks per sector (NT, Diagnostics, Controls, PCs) FOFB NETWORK
24
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 24/33 Topology based on the use of network spare optical fibers to Sector 09 FOFB NETWORK
25
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 25/33 FOFB NETWORK Patch panel on Sector 09 will allow any combination of interconnections
26
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 26/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
27
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 27/33 CORRECTION CALCULATION - Original plan was to use MicroResearch reading board + distributed processing CPUs - Pentium M running Linux 2.6 already installed but “under investigation” - Not possibility of DMA on MicroResearch boards turns us to look for other solutions VMETRO?... Tell me!!!! - Distribution of data using Diamond Communication Controller internally agreed few weeks ago (discussions since who knows when) - We will pay ITech for the integration job in our design - Correction done with widely used SVD algorithm + PID controller
28
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 28/33 CORRECTION CALCULATION - Even though we have 120 BPMs and their corresponding Libera electronics, only position data from 88 BPMs will be used for orbit correction Why? - Representation of β functions vs. phase advance shows that some BPMs give almost the same information (same info = no info) - BPMs are better distributed according the vertical plane were more precision is needed
29
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 29/33 ALBA FAST ORBIT FEEDBACK Beam Position Monitors BPM readout electronics FOFB network Correctors Power Converters (PC) Correctors magnets Correction CPUs
30
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 30/33 POWER CONVERTERS Power converter I/V transducer ADC PSI Controller Tx Board IP modules Carrier cPCI Bus RS232 service port Electrical Optical Optical protocol management Commercial Diamond Correction Calculation CPU Optical ALBA Controls rack Correctos PCs rack Provide ±1mrad of DC deflection and ±40µrad @ 100Hz Resolution of 18 bits OCEM-Diamond PCs Tested at factory but not yet delivered
31
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 31/33 - Eddy currents on the vacuum chamber reduce the effect of the magnetic field at high frequencies f H =235 Hz f V =1550 Hz Horizontal Steering Vertical Steering - All delivered and on installation process - Chamber thickness reduction to 2mm in the correctors CORRECTOR MAGNETS FOFB limiting factor - ALBA sextupoles have extra coils to provide H/V beam steering
32
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 32/33 - Half of the Storage Ring BPMs still pending. Measurement goes together with installation WHAT’S NEXT? - LTB, BTS and BOOSTER BPMs electrical offset measured - On site measurement of RF cables lengths (by cabling company) connec. assembly - All RF cables will be checked after installation one by one - Test Libera release version 2.03 in the Lab (probably our production version) - Develop graphical utilities for Booster and Storage commissionings - Take decisions about “sniffer” boards and processing CPUs - Implement an small FOFB in the lab before final installation - Receive and test the correctors power converters LINAC full commissioning by Sep-Oct 09 Booster commissioning right after LINAC Storage Ring commissioning May-10
33
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 33/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users Meeting – June 2009 Angel Olmos