Download presentation
Presentation is loading. Please wait.
Published byDwayne Elliott Modified over 9 years ago
1
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight Procedures Aeronautical Charting
2
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 2 Develop and Maintain Instrument Flight Procedures (over 14,000) Airborne Inspection of Navigation and Visual Aids Airborne Inspection of Instrument Flight Procedures and the data supporting the procedure Print and Distribute Aeronautical Charts Publish the National Flight Data Base (an ARINC 424 coded public flight procedures data base)
3
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 3 Projects in the Pacific –Maldives Mobile VOR installed after Tsunami –NDB Restoral and Vortac commissioning Diego Garcia –Lanai ILS Glideslope Special to obtain reference data –Lihue Vortac Special to determine affect of barbed wire fence around the facility –Hana RNAV (GPS) runway 26 and RWY 8 Publication date 09/01/05 –Hana Departure Procedure Publication 09/01/05 –Guam ILS Rwy 06R ??????
4
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 4 Airport Construction / Obstructions Airport Construction Could have adverse affect on published procedures, or development of future procedures Could cause cancellation of procedures and require undue delays in amending procedures without proper and prior coordination Coordination required with Airports (ADOs) and Regional Flight Procedures Office Obstructions On or near airports Could cause same effects as airport construction Regional Air Traffic point of contact for filing Obstruction Evaluations (OEs)
5
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 5 Guidance Memorandum dated, 21 January 2005 Program Director, Aviation Systems Standards and Director, Office of Airport Safety and Standards Point of Contact Regional Flight Procedures Office Manager, Mike Vermuth, Telephone: 310-725-7122 Processing Through Regional Flight Procedures Office Third Party Surveys
6
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 6 RNAV Instrument Approach Procedures LNAV Only GPS is Required LNAVs planned for Hana Airport, Rwys 26 and 8 on 01 September 2005 LNAV / VNAV Allows for Vertical Guidance using Barometric Altimeter Aircraft Avionics is a Limiting Factor LPV WAAS Coverage in the Future' or greater How to Request? Regional Flight Procedures Office Website: avn.faa.gov
7
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 7 NDB Procedures Cancellation & Decommissioning NDB Procedures Cancellation Proposed for Runway ends with at least one other Ground-based Procedure and a Space-based Procedure Announced in Federal Register for Public Comment (comment period closed on 4 April 2005) Proposed for Honolulu Intl. Rwy 8L, Kahului Rwy 20 Alternative Enter reimbursable agreement for annual maintenance and flight check New NDB Procedures Will be developed with reimbursable agreement NDB Decommissioning Only procedure will be cancelled initially Each NDB will be evaluated for other usage. Ex: Missed approach holding, Final Approach FIX (FAF) identification (Associated with ILS) Facility Decommissioning will be coordinated when a determination is made and the facility is no longer required
8
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 8 Web Address www.faa.avn.govwww.faa.avn.gov
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.