Presentation is loading. Please wait.

Presentation is loading. Please wait.

NGSI Summer Seminar Series Findings Carolyn McGraw Ross Snow Danyal Turkoglu Dwayne Tucker August 1, 2011.

Similar presentations


Presentation on theme: "NGSI Summer Seminar Series Findings Carolyn McGraw Ross Snow Danyal Turkoglu Dwayne Tucker August 1, 2011."— Presentation transcript:

1 NGSI Summer Seminar Series Findings Carolyn McGraw Ross Snow Danyal Turkoglu Dwayne Tucker August 1, 2011

2 2Managed by UT-Battelle for the U.S. Department of Energy Safety HFIR/REDC – Dosimeters – Mineral Oil/Shielding for Hot Cell – Walkway Barriers Safeguards Laboratory – Long Pants – Close toed shoes required – Nuclear material only handled by trained personnel Graphite Reactor – Guardrails on stairs – Uranium slugs inserted with long rods – Hardhats and gloves

3 3Managed by UT-Battelle for the U.S. Department of Energy Security HFIR / REDC – Proximity cards on entry points – Armed guards at gate and for material transfers – Fixed dome pan/tilt/zoom cameras Safeguards Lab – Limited access – Cameras Graphite Reactor – Barbed wire fence surrounding 233 U – Vault – Secrecy from Manhattan Project

4 4Managed by UT-Battelle for the U.S. Department of Energy Inspection HFIR/REDC – Inspection resulted in lower power rating – IAEA Logbook – Periodic shutdowns for inspection Safeguards Laboratory – Detectors/Imaging for inspection Graphite Reactor – No longer in operation

5 5Managed by UT-Battelle for the U.S. Department of Energy Material Control and Accountability (MC&A) HFIR/REDC – Logbooks and reports – Paperwork for movement of materials Safeguards Laboratory – Tamper Indicating Devices (TIDs) – Separate room for nuclear materials – Trained personnel handle material Graphite Reactor – Original Logbook – Plutonium samples hand delivered, not shipped


Download ppt "NGSI Summer Seminar Series Findings Carolyn McGraw Ross Snow Danyal Turkoglu Dwayne Tucker August 1, 2011."

Similar presentations


Ads by Google