Download presentation
Presentation is loading. Please wait.
Published byJoella Summers Modified over 9 years ago
1
- Expert group meeting / Tunis 3-5 October 2012 - Innovative mechanisms for financing renewable energy projects in North Africa MSP Project-pipeline and analysis of financing strategies Martin Ehrlich (PWMSP) The contents of this publication are the sole responsibility of the authors and can in no way be taken to reflect the views of the European Union
2
The views expressed in this publication do not necessarily reflect the views of the European Commission 1. MSP and PWMSP 2. MSP Investment Pipeline 3. RE financing 4. RES-e economics 5. Large scale RES-e financing – ongoing debate Scope of the presentation
3
The views expressed in this publication do not necessarily reflect the views of the European Commission 1- MSP and PWMSP MSP projects and financing strategies
4
The views expressed in this publication do not necessarily reflect the views of the European Commission Project activities Task 1 – Harmonised legislative and regulatory framework Task 2 – Transfer of knowledge and capacity building Task 3 – Support to the implementation of sustainable energy policies Task 4 – Support to investment Task A – Mediterranean grid Task B – Support to MSP implementation Task C - Master Plan of the Mediterranean Electricity Interconnection Paving the way for the MSP
5
The views expressed in this publication do not necessarily reflect the views of the European Commission 20 GW by 2020 Bankable Projects Private investors The Challenge - Financing the MSP Centralised RES-e Wind PV CSP without storage CSP with storage Decentralised RES-e Energy efficicency Energy saving Demand side manmagement Rural Electrification Grid connected Off-grid Electricity networks and connection Each technology has different cost-benefit charaecteristics and framework requirements
6
The views expressed in this publication do not necessarily reflect the views of the European Commission Costs of the MSP – 20 GW RES-e Source: Mission IGF-CGIET (2009) - Rapport sur le plan solaire méditerranéen
7
The views expressed in this publication do not necessarily reflect the views of the European Commission Extra cost burden Source: Mission IGF-CGIET (2009) - Rapport sur le plan solaire méditerranéen
8
The views expressed in this publication do not necessarily reflect the views of the European Commission Reliance on private investors Public-private partnership (PPP) Financial feasibility Variety of technologies Subsidy-incentive requirements Energy efficiency (EE) investments should normally be cost efficient Different country specific situations In MPCs three situations can be observed: ◦ Electricity supply prices are below the economic costs of supply ◦ Electricity supply prices fully cover the costs of supply ◦ Electricity supply conditions do not permit a reliable electricity supply MSP investment prinicples
9
The views expressed in this publication do not necessarily reflect the views of the European Commission 2 – MSP investment pipeline
10
The views expressed in this publication do not necessarily reflect the views of the European Commission FEMIP / EIB / EUROMED (2010): Study on the Financing of Renewable Energy Investment in the Southern and Eastern Mediterranean Region
11
The views expressed in this publication do not necessarily reflect the views of the European Commission
14
3- RE financing
15
The views expressed in this publication do not necessarily reflect the views of the European Commission 3- RE financing
16
The views expressed in this publication do not necessarily reflect the views of the European Commission 3- RE financing
17
The views expressed in this publication do not necessarily reflect the views of the European Commission 3- RE financing
18
The views expressed in this publication do not necessarily reflect the views of the European Commission 4 - RES-e economics
19
The views expressed in this publication do not necessarily reflect the views of the European Commission Economic analysis Point of view of the national economy Costs and benefits valued with social opportunity costs Use of accounting / shadow prices / border prices Neglecting of transfers between entities of the economy Financial analysis Point of view of the project – investment Analysis with given market prices Transfers and taxes
20
The views expressed in this publication do not necessarily reflect the views of the European Commission 4 - RES-e economics Source: EMPower Programme – PV case studies for Egypt – Project information memorandum
21
The views expressed in this publication do not necessarily reflect the views of the European Commission
26
5 – Large scale RES-e financing
27
The views expressed in this publication do not necessarily reflect the views of the European Commission Risk ! ◦ Distorted energy prices ◦ Absence of long-term perspectives ◦ Unreliable and intransparent framework ◦ Uncertain contractual basis ◦ Long and unorganised procedures RES-e framework Thrust ! Economic and financial viable energy sector Long-term perspective Reliable and transparent framework Long-term contracts Efficient administration and procedures Risk coverage options
28
The views expressed in this publication do not necessarily reflect the views of the European Commission Project risk ◦ Technological choice and financing terms Policy risk ◦ Adverse changes in the policy context Financial risk ◦ Adverse changes in the economic and financial parameters Legal and regulatory risk ◦ Uncertainties and inconsistencies at regulatory, legal and judicial level Country risk ◦ Possibility of economic and political disturbances Force majeur ◦ Natural disasters and other major incidents Project Financing and Risk Management
29
The views expressed in this publication do not necessarily reflect the views of the European Commission Project Financing and Risk Management Source: EMPower (2010) Steps towards bankability Documentation III – PV Business Model
30
The views expressed in this publication do not necessarily reflect the views of the European Commission Project Financing and Risk Management Source: EMPower (2010) Steps towards bankability Documentation III – PV Business Model
31
The views expressed in this publication do not necessarily reflect the views of the European Commission 24-09-2012 Le consortium mené par Acwa Power International a donc été déclaré adjudicataire de cette première centrale Ozz 1, pour un prix heure de pointe évalué de 1,6187 dirhams ($0,19) par kWh, soit un différentiel de 21% avec l’offre suivante. http://www.masen.org.ma/ ($0,19 / €0,15 par kWh)
33
The views expressed in this publication do not necessarily reflect the views of the European Commission UfM - MSP Masterplan process Build a coherent and comprehensive strategy; Develop and better use investment support tools; Develop and better use production support tools; Design and implement technical assistance tools; Improve the existing specific financial support for energy efficiency and decentralized renewable energy; and, finally, Create a structured pipe-line of MSP projects with the support of MSP specific tools.
34
http://www.eib.europa.eu/infocentre/publications/all/mediterranean-solar-plan-project- preparation-initiative.htm?lang=en
35
The views expressed in this publication do not necessarily reflect the views of the European Commission What types of technical assistance can the MSP-PPI support? Pre-feasibility and feasibility studies; TA for preparing projects’ technical specifications and tender documents, grid connection studies, etc.; On-site RE resource assessments or audits; Environmental and social impact studies; Detailed analysis of the projects’ financial structure (including an implicit analysis related to the tariffs and subsidies frameworks needed in the subsequent implementation of the project); Analysis of the economic impacts of the project; TA for the implementation of the Project Implementation Units (PIUs) related to RE or EE investments; TA / studies to speed up further project preparation and to accompany the initial stages of the implementation until the start of disbursement of the MSP investment projects.
36
The views expressed in this publication do not necessarily reflect the views of the European Commission THANK YOU FOR YOUR ATTENTION Martin Ehrlich m.ehrlich@mvv-decon.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.