Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator.

Similar presentations


Presentation on theme: "Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator."— Presentation transcript:

1 Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator

2 What is ITS? Transportation Projects where Technology is being implemented and Integrated. –The National Architecture has a great listing of ITS functions and services http://itsarch.iteris.com/ http://itsarch.iteris.com/ –A lot of projects already become part of a traditional construction job. Those projects where electronic data and data integration are a focus are ITS. –Security is the latest area. GIS, Maintenance DB’s, Traveler Information and Traffic Management

3 Project Overview Statewide and Regional Workshops –Data Collection – Survey and Scenarios Overview of the Architecture Process Turbo Architecture 3.0 Training Making ITS Part of Regional Transportation Planning Statewide Strategic Plan

4 Consultant Roles and Responsibilities Facilitate the Process Provide the Starter File and Technical Support as needed. Build the Statewide Architecture and Strategic Plan based on ‘our’ needs and goals. The team should be able to answer most questions at most levels. The team and the ITS Office will focus support to the Champions

5 Consultant Roles and Responsibilities Regions are defined. Regions can choose to break out an Architecture as needed. We expect Rural Area needs to be encompassed in the Statewide Architecture.

6 Keys to the Regional Architectures… Identify key stakeholders and interrelationships Describe required activities or functions Define interconnections and interdependencies between functions Develop a blueprint for integration of systems – Define Projects

7

8 Architecture Development Process

9 How does this apply to Projects? Projects are typically defined by need. FHWA via its programs has committed to the Systems Engineering Process. –Allows for methodical process to define an implementation project. Identification of addition integration options Consideration of options and standards

10 Systems Engineering Process

11 Project Outputs Regional Architectures –Metro East Collinsville/East St. Louis –Champaign-Urbana –Peoria –Quad Cities –Rockford –Springfield Statewide Architecture and Strategic Plan www.ilits.org

12 Transit Focus w/in the Architecture Service Area’s –Archived Data Management –Public Transportation –Traveler Information –Traffic Management –Vehicle Safety –Commercial Vehicles –Emergency Management –Maintenance and Construction Management

13 Public Transportation Market Packages APTS1 – Transit Vehicle Tracking APTS2 – Transit Fixed-Route Operations APTS3 – Demand Response Transit Operations APTS4 – Transit Passenger and Fare Management APTS5 – Transit Security APTS6 – Transit Maintenance APTS7 – Multi-modal Coordination APTS8 – Transit Traveler Information

14 Integration Opportunities AD1 – ITS Data Warehouse or AD2 – ITS Virtual Data Warehouse ATIS1 – Broadcast Traveler Information ATIS2 – Interactive Traveler Information ATMS6 – Traffic Information Dissemination ATMS9 – Traffic Forecast and Demand Management EM2 – Emergency Routing EM8 – Disaster Response and Recovery EM10 – Disaster Traveler Information MC10 - Maintenance and Construction Activity Coordination

15 The Real Stuff Vehicle Location Systems for Transit Management Arrival Information Systems Asset Management Systems Transit Security – cameras, emergency call boxes Traveler Information Trip Planning –Multi-Modal

16 Concept of Operations Identify current and planned ITS services and functions What is the Statewide Transit Vision? Signal Priority Barriers Staffing to Support ITS AVL Meeting Traveler Information Requirements Standards proving How do I use the data? Integration of electronic payment systems

17

18

19

20

21 Focus Regions have been ‘turned loose’ –MPO, IDOT ITS Coordinators and ITS Program Office are Championing the efforts. Project Team and ITS Office Review Technical Committee Meeting was held on January 5 th in Springfield. Next Technical Committee – March 3 rd Next Steering Committee – March 10 th


Download ppt "Statewide ITS Strategic Plan and Architecture Illinois Public Transportation Association Board Meeting 01-11-2005 Scott Lee IDOT ITS Technical Coordinator."