Download presentation
Presentation is loading. Please wait.
Published byNeal Ball Modified over 9 years ago
1
1 Module 5 Damage Control
2
2 Terminal Objectives Upon the successful completion of this module, participants will be able to describe methods used to prevent or control damage from a combustible dust explosion.
3
3 Enabling Objectives Discuss types of damage control systems. Discuss emergency response planning.
4
4 Damage Control Systems Monitoring/suppressing/eliminating dust Various types of systems –Spark ember detection –Extinguishing –Hazards separation/segregation –Deflagration venting –Pressure relief venting –Specialized fire suppression
5
5 Spark Ember Detection Eliminate early causes of fires/explosions Detects spark/ember IR radiation Fire prevention method –Dust collectors –Pneumatic conveying systems
6
6 Spark Ember Detection System activates countermeasures –Deluge valves –Abort gates –Alarm systems –Automatic machinery shutdown –Extinguishing devices
7
7 Extinguishing System Releases fine mist of water Sparks/embers extinguished without interrupting production Greatly reduces –Personnel injury –Equipment damage –Downtime
8
8 Hazard Separation Isolates combustible dust hazard Puts distance between dust and hazard Implement system during design/remodeling
9
9 Hazard Segregation Used when separation is not possible Isolates hazard by using a barrier Implementation without burdening entire plant/building
10
10 Deflagration Venting Controls damage caused by explosions Vents release expanding gases Gases reduce pressure below danger levels
11
11 Pressure Relief Venting Same premise as deflagration venting Provides pressure relief to prevent explosions
12
12 Specialized Fire Suppression Systems Sprinklers –Most standard form of fire suppression –Heat activated Carbon Dioxide –Will not damage electronic equipment –Reduces oxygen levels
13
13 Dry Powder Extinguishers Standard/Multi-purpose –Safe for most kinds of fires “Knocks down” the flames Best for fires with flammable liquids/gases
14
14 Deluge Foam System is connected to a water supply –Valve opened by smoke/heat detection system Used in high hazard areas –Chemical storage –Processing facilities
15
15 Emergency Response Planning Requires detailed planning 3 phases of planning 1.Pre-explosion 2.Dust explosion 3.Post explosion
16
16 Pre-Explosion Develop Emergency Action Plan (EAP) Take special consideration for combustible dust
17
17 Dust Explosion Implement EAP Evacuate area NOT incipient fire –Explosions can be initiated by incipient fire –Ignited materials can travel
18
18 Dust Explosion Incipient fire brigades –Limited training –Typically hose streams –PPE Categorized as fully involved fire –Fire department response –Specialized training
19
19 Post-Explosion Initiate investigation when safe –Most evidence is destroyed –Only 50% of cases determine cause –Collect any dust samples Change in working environment –Paranoia, fear, and stress –Perceived risk –apprehension
20
20 Post-Explosion Increased interest –Community –Regulatory industries Communication from organization –Public relations –Choosing a speaker
21
21 Post-Explosion Resuming normal operations Recovery –Rebuilding with safety in mind –Strong leadership/direction needed
22
22 Next Module Module 6: Facility Dust Assessment
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.