Download presentation
Presentation is loading. Please wait.
Published byArthur Payne Modified over 9 years ago
1
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group October 2009
2
Outreach and Implementation 1.New SHRP 2 documents 2.SHRP 2 Meetings and Presentations Summaries and Future Opportunities 3.AASHTO RAC Annual Meeting SHRP 2 Implementation Workshop 4. SHRP 2 Technical Webinar Series
3
Outreach and Implementation 5. TRB 2010 AnnualMeeting * Sunday Workshop: “SHRP 2 Planning for Implementation” * Session “Significant Milestones in the SHRP 2 Renewal Program and Implementation Plans” * Session “SHRP 2 International Collaboration” * Sunday Workshop: Capacity Web tool * Safety Program Session Many Other Technical Committee Presentations
4
Outreach and Implementation 6.General * ITE, ASCE, LTAP/TTAP, APWA, ARTBA OTEC and many others planned. * AASHTO Subcommittees “reach out and touch” * Safety Symposiums * Pavement contractor workshop and symposium * TRB 7 th International Bridge Conference 2010 * TRB Low-Volume Roads Conference 2011 * New SHRP2 poster and exhibit “Critical Transportation Issues” and several new communication documents * New focus area posters
5
Early Results International state of practice summaries in utility location, non-destructive testing, working with utilities, and composite pavements in Europe Web-based tool for selecting appropriate technology for locating underground utilities Successful practices and model agreements between transportation agencies and railroads
6
Early Results Analytical methods for use of naturalistic driving data Research protocol — already being considered by other countries to conduct parallel projects (Potential) Site-based automated video analysis of intersections and roadway segments
7
Early Results First release of web-based collaborative decision making tool Best practice case studies Performance measures tool (description, required data, example scale for application and potential uses for (long- range planning, preprogram studies, programming, environmental review, and design and permitting).
8
Early Results Institutional Maturity Framework — guide to becoming an operations- oriented agency Analytical models to predict the affect of various strategies on travel time reliability Guidance document for integration of business practices into operations
9
Thank You For more information: SHRP 2: www.trb.org/shrp2www.trb.org/shrp2 jdimaggio@nas.edu
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.