Download presentation
Presentation is loading. Please wait.
Published byJohnathan Benson Modified over 9 years ago
1
Annette Czerneski and Kris Phillips, ACM IT Support North Central Region Construction Conference February 26, 2014
2
Construction & design software installs and support. Notify staff about software updates. Notify staff about application or server outages. Distribute new construction contracts to project leaders and assign to project managers for estimate approvals. 2 USH 45, Wittenberg – Antigo, South Cty Ln – STH 47, Langlade County Contractor: Northeast Asphalt, Inc. Project Leaders: Ryan Erkkila and Josh Kircher, Coleman Engineering Company Project Manager: Jim Volkmann
3
Windows 7 Professional 64-bit OS Save files in Office 2007 format only Internet Explorer 8 or higher 3
4
FieldManager (FM) version 5.0a Field Information Tracking (FIT) 2014 Materials Information Tracking (MIT) 2013 A service pack update may be released in 2014. ACMApplications folder Backup Pantry 2014 WisDOTShortcuts 4 USH 51, Minocqua, Front St – Old Hwy 70 Oneida County Contractor: Pitlik & Wick Inc. Project Leader: Pat Bailey, REI Engineering, Inc. Project Manager: Richard Simon
5
Documentation / Administrators tab New field labels for Project Leader, Project Manager and Supervisor 5
6
Contractors If a subcontractor does not appear in the Add Contractor window, have the subcontractor register at https://app.mylcm.com/wisdot/Login.aspx https://app.mylcm.com/wisdot/Login.aspx All subcontractors are required to register with WisDOT using the on-line process. 6
7
Contractors Select the Registration link and complete the form. Details can be found on page 7 of the 2014 Construction Season PC User’s Guide. 7
8
Estimate / Add Estimate tab / Estimate types Intermediate Semi Final (replaces Tentative Final) Final 8
9
Staff/Field Office Contacts Information New required information WisDOT Project Materials Coordinator 9
10
New fields required for the finals process Submission of Claim Date AND Punch List Complete Date Details about the new finals process will be shared at Specification Update trainings that will be held at each region office in March. 10
11
Removed Supplemental Agreement form Information entered as a contract modification. Guidance provided in CMM. 11
12
Requirements to send data: When the ECIP is approved. When contract time starts. When a contract modification is created. When a contract modification is approved. When work is completed on the contract. When a DQI report is completed. Required data entry: DQI information Explanation of Variation report Data entered in FieldManager Acceptance information ECIP information Proving period information for paint and landscaping) When the ECIP is approved. Late paving and seeding dates. Claim submission and punch list completion dates. Structure(s) information Staff / Field Office information Warranty information 12
13
We recommend performing weekly backups. How to setup WisDOT backup process: Create folder on USB drive named \ACMApplications Copy C:\ACMApplications\backup\*.* to USB drive \ACMApplications folder Each week run backup from USB drive: Run \ACMApplications\Backup\ACMBackup.bat Copies FieldManager, FIT and/or MIT databases 13 USH 51/ CTH U / CTH K, Wausau – Merrill CTH U Bridge (facing northwest) Marathon County Contractor: Michels Corporation Project Leaders: Stacy Hagenbucher (WisDOT) and Michael Dombeck (Gremmer) Project Manager: Dan Erva
14
We will continue to use Bomgar and the WisDOT FTP site to remotely install updates and resolve issues. If a company has 5 or more computers requiring updates they can be brought to a DTSD office or an on-site visit can be arranged. Local administrative rights required for software installs. Appointments (based on contract status): New contracts starting in March and April Active and carryover contracts Existing contracts that are not finaled Contracts starting in May or later this season 14 STH 153, Village of Elderon, Main Street, Maple St. – Park St., Marathon County Contractor: S&N Incorporated Project Leader: Tim Schoenherr, QUEST Project Manager: Mark Steidl
15
Annette Czerneski (715) 421-7319 or (715) 459-4773 annette.czerneski@dot.wi.gov annette.czerneski@dot.wi.gov Kristine Phillips (715) 365-5711 or (715) 490-2400 kristine.phillips@dot.wi.gov kristine.phillips@dot.wi.gov WisDOT Computer Help Desk (800) 362-3050 ACM Support Portal https://acmsupport.dot.state.wi.us/ https://acmsupport.dot.state.wi.us/ 2014 Construction Season PC User’s Guide Pantry2013\RegionSpecific\NorthCentralRegion\2014PCUsersGuide.pdf 15 USH 51 Emergency Overlay, Minocqua – Manitowish CTH M – CTH W, Vilas County (Vacuum truck that was used to clean up the mess from the rumble strip machine.) Contractor: Northeast Asphalt Project Leader: Tony Santilli Project Manager: Dan Erva
16
16 Have a great 2014 construction season! IH 39, Coloma-Plainfield, Coloma Safety & Weight Facility, Waushara County Contractor: International Road Dynamics Corp. Project Leader: Scott Whitsett, Jewell Associates Project Manager: Jeff Stewart
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.