Low Cost Housing Development on Devils Peak
2
Tender Low cost housing development on Devil’s Peak Low cost housing development on Devil’s Peak Investigate feasibility of the project Investigate feasibility of the project Cost Land Characteristics
3
Location Total Area of the site (J): = 1809.33 m2 = 0.0180933 hectors
4
Methodology Classic data capturing techniques Classic data capturing techniques Levelling Traverse Tacheometry
5
Proposed Development Single cut and fill Single cut and fill 2.5m boundary road 2.5m boundary road Cost Effective Cost Effective Efficient for housing layout Efficient for housing layout 6 Houses fitted 6 Houses fitted Raised above the cliff height (172.5m) Raised above the cliff height (172.5m) Gradient Diagram of Site:
6
Cut and Fill Figures 2D Area Levelled: 798.43 m 2 2D Area Levelled: 798.43 m 2 Volume Cut: 782.59 m 2 Volume Cut: 782.59 m 2 Volume Filled:479.89 m 2 Volume Filled:479.89 m 2 Number of houses:6 houses of 45m 2 (7m X 6.5m) 100 m 2 plot. Number of houses:6 houses of 45m 2 (7m X 6.5m) 100 m 2 plot. Prices: Cut and Fill R250/ m 3 of sub soil Prices: Cut and Fill R250/ m 3 of sub soil Compression R25/m 2 of compression 60% Cut and 40% filled for compression. 60% Cut and 40% filled for compression.
7
House Characteristics Cost: Housing Expenses for 100m 2 pot with a 45m 2 dwelling is an average R50 000. Housing Expenses for 100m 2 pot with a 45m 2 dwelling is an average R50 000.Size: Homes of 45m 2 will be developed. The features include passive solar design with shower, laundry, kitchen area, damp proofing, termite protection, insect screening, high-quality surface finishes, on-site waste treatment and electricity in each room. Homes of 45m 2 will be developed. The features include passive solar design with shower, laundry, kitchen area, damp proofing, termite protection, insect screening, high-quality surface finishes, on-site waste treatment and electricity in each room. The plot sizes will be 100 square meters (10.2 X 9.5). The plot sizes will be 100 square meters (10.2 X 9.5). The 14 houses that fit onto the site will be attached backwards to each other and will share a side and back wall to minimize the costs of development. With the symmetric layout of the houses water and electricity lines are easy and cost effective to install. The 14 houses that fit onto the site will be attached backwards to each other and will share a side and back wall to minimize the costs of development. With the symmetric layout of the houses water and electricity lines are easy and cost effective to install. The accessibility to the houses is spacious and trouble free with enough parking and driving area to gain access to houses on either side of the development from the main entrance on the left hand side. The accessibility to the houses is spacious and trouble free with enough parking and driving area to gain access to houses on either side of the development from the main entrance on the left hand side. Each home will have an external toiletry facility on the premises, this allows for a greater living area inside the house and alleviates the hassle of a bathroom in the house. Each home will have an external toiletry facility on the premises, this allows for a greater living area inside the house and alleviates the hassle of a bathroom in the house.
8
Costs Cut and FillR 250/m 3 CompressionR 25/m 2ExpenseQuantityPrices/load(R)PriceCompression 320m 2 R25/m 2 R8000 Cut and Fill 782m 3 R250/m 3 R195 500 House (45m 2 ) 6 R 51 465.25 R308 791.5 TOTAL: R512 291.5
9
ArcGIS Layout of the site Layout of the site Placing the site in the real world Placing the site in the real world Houses lay-out Houses lay-out Cut and Fill Cut and Fill Map of site Map of site
10
Six houses would not be feasible Six houses would not be feasible Capital from development do not cover expenses Capital from development do not cover expenses Costs of excavation and construction more feasible for more units Costs of excavation and construction more feasible for more units Conclusion