Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITS Technology Services Summer Projects. 2013 SUMMER PROJECTS  MavPRINT – Student Mobile Device Printing (September) * * Awaiting web skinning and documentation.

Similar presentations


Presentation on theme: "ITS Technology Services Summer Projects. 2013 SUMMER PROJECTS  MavPRINT – Student Mobile Device Printing (September) * * Awaiting web skinning and documentation."— Presentation transcript:

1 ITS Technology Services Summer Projects

2 2013 SUMMER PROJECTS  MavPRINT – Student Mobile Device Printing (September) * * Awaiting web skinning and documentation

3 2013 SUMMER PROJECTS  Printing (Faculty and Staff) – Xerox Mobile Printing (October)* * Delayed from summer due to workload

4 2013 SUMMER PROJECTS  MavAPPS – Office 2013 (in addition to Office 2010)

5 2013 SUMMER PROJECTS  MavAPPS – AutoDesk Software for Construction Management

6 2013 SUMMER PROJECTS  MavMAIL – Office 365 Student E-Mail (Over 34,000 student mailboxes moved to the cloud)

7 2013 SUMMER PROJECTS  Data Warehouse and Analytics (September) * * Delayed awaiting funding

8 2013 SUMMER PROJECTS  Event Management System – Migration from R25 / Integration

9 2013 SUMMER PROJECTS  MavTUBE – video streaming and media management

10 2013 SUMMER PROJECTS  MavNET – Expand Wireless Coverage (73 Access Points)  MavNET – Wireless Controller Replacement (NOT DONE) * * Delayed awaiting FY14 Budget Allocation

11 2013 SUMMER PROJECTS  Cellular Repeater – Distributed Antenna System * * Upgrade for Julia Sears and Preska (Phase 1)

12 2013 SUMMER PROJECTS  StarID – Implementation / Migration Planning

13 2013 SUMMER PROJECTS  New Services – Implementation / Migration Planning

14 2013 SUMMER PROJECTS  Symantec Anti-Virus -> System Center Endpoint Protection  PointSec – Full-Disk Encryption Replacement (Extended)

15 2013 SUMMER PROJECTS  System Upgrades:  Class Climate (NOT DONE) *  Qualtrix  Visix (Digital Signage System)  FusionRV (Crestron Centralized Monitoring System)  Medicat Server Upgrade (Student Health Services)  SHS Pharmacy Software (Student Health Services)  Blackboard Transaction System Upgrade  ImageNow System Upgrade  ImageNow MnSCU Audit  Dentrix Upgrade  HC 2010 Classroom Network Replacement  Copy Shoppe Point Of Sale Replacement  Alumni Call Center Software Replacement * Workload

16 2013 SUMMER PROJECTS  Power – USB Charging Stations for Students

17 2013 SUMMER PROJECTS  TelePresence – Normandale Endpoint TX9200

18 2013 SUMMER PROJECTS  Moves – Morris Hall, Armstrong Hall, etc.

19 2013 SUMMER PROJECTS Delayed

20  Campus Network – Begin Switch Replacement Project (10x Bandwidth) * - Firewall Replacement (MnSCU) ** - Network Monitoring (NOT DONE) *** * Delayed awaiting FY14 Budget Allocation ** Awaiting equipment from MnSCU *** Delayed - Workload

21 2013 SUMMER PROJECTS Delayed  SharePoint – 2010 to 2013 Upgrade (September) * * Workload Delay


Download ppt "ITS Technology Services Summer Projects. 2013 SUMMER PROJECTS  MavPRINT – Student Mobile Device Printing (September) * * Awaiting web skinning and documentation."

Similar presentations


Ads by Google