Download presentation
Presentation is loading. Please wait.
Published byRoxanne Lyons Modified over 9 years ago
1
ITS Technology Services Summer Projects
2
2013 SUMMER PROJECTS MavPRINT – Student Mobile Device Printing (September) * * Awaiting web skinning and documentation
3
2013 SUMMER PROJECTS Printing (Faculty and Staff) – Xerox Mobile Printing (October)* * Delayed from summer due to workload
4
2013 SUMMER PROJECTS MavAPPS – Office 2013 (in addition to Office 2010)
5
2013 SUMMER PROJECTS MavAPPS – AutoDesk Software for Construction Management
6
2013 SUMMER PROJECTS MavMAIL – Office 365 Student E-Mail (Over 34,000 student mailboxes moved to the cloud)
7
2013 SUMMER PROJECTS Data Warehouse and Analytics (September) * * Delayed awaiting funding
8
2013 SUMMER PROJECTS Event Management System – Migration from R25 / Integration
9
2013 SUMMER PROJECTS MavTUBE – video streaming and media management
10
2013 SUMMER PROJECTS MavNET – Expand Wireless Coverage (73 Access Points) MavNET – Wireless Controller Replacement (NOT DONE) * * Delayed awaiting FY14 Budget Allocation
11
2013 SUMMER PROJECTS Cellular Repeater – Distributed Antenna System * * Upgrade for Julia Sears and Preska (Phase 1)
12
2013 SUMMER PROJECTS StarID – Implementation / Migration Planning
13
2013 SUMMER PROJECTS New Services – Implementation / Migration Planning
14
2013 SUMMER PROJECTS Symantec Anti-Virus -> System Center Endpoint Protection PointSec – Full-Disk Encryption Replacement (Extended)
15
2013 SUMMER PROJECTS System Upgrades: Class Climate (NOT DONE) * Qualtrix Visix (Digital Signage System) FusionRV (Crestron Centralized Monitoring System) Medicat Server Upgrade (Student Health Services) SHS Pharmacy Software (Student Health Services) Blackboard Transaction System Upgrade ImageNow System Upgrade ImageNow MnSCU Audit Dentrix Upgrade HC 2010 Classroom Network Replacement Copy Shoppe Point Of Sale Replacement Alumni Call Center Software Replacement * Workload
16
2013 SUMMER PROJECTS Power – USB Charging Stations for Students
17
2013 SUMMER PROJECTS TelePresence – Normandale Endpoint TX9200
18
2013 SUMMER PROJECTS Moves – Morris Hall, Armstrong Hall, etc.
19
2013 SUMMER PROJECTS Delayed
20
Campus Network – Begin Switch Replacement Project (10x Bandwidth) * - Firewall Replacement (MnSCU) ** - Network Monitoring (NOT DONE) *** * Delayed awaiting FY14 Budget Allocation ** Awaiting equipment from MnSCU *** Delayed - Workload
21
2013 SUMMER PROJECTS Delayed SharePoint – 2010 to 2013 Upgrade (September) * * Workload Delay
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.