1 FP6−2004−Infrastructures−6-SSA-026634 EUChinaGRID Lanxin.Ma@cern.ch 马兰馨 Nov. 06, 2006

2 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  2  What is EUChinaGrid http://www.euchinagrid.org EUChinaGrid is an initiative to extend the European GRID infarstructure(EGEE) for e-Science to China

3 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  3  Why extend Grid Infrastructure to China  China is one of the fastest growing economies in the world with a specific infrastructure for Science GRID (CNGrid).  Many groups of scientists in Europe have already established good relationships with Chinese Research Groups.  Grids can provide an infrastructure to enhance the level of collaboration, deploying new applications and shared access to scientific data.  GRID is a reality which allows new ways of sharing resources (not all of them completely exploited) in scientific collaboration (eScience) and in other fields (eGovernment, eHealth, eBusiness, etc.)  EU has largely invested in GRID technology in the past 4 years and is planning to invest more in FP7.

4 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  4  EUChinaGrid Main Objectives  Main objective is to support the Interconnection and Interoperability of Grids between Europe and China.  Main focus is on two specific infrastructures: CNGrid in China EGEE in Europe  Dissemination of advanced knowledge in Grid technology is also a relevant part of the activity.  Strengthening the collaboration between scientific groups in both Countries, supporting existing and new Grid applications.

5 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  5  Timescale & Budget  The project started on the 1 st January 2006  24 Months duration  The Kick-off Meeting was being organised in Athens by GRNET 25-26 January 2006  EU Contribution of 1,299,998 €.  A total of 495 Person Months (325 Funded).

6 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  6  Partners  Italy INFN – Coordinator Consortium GARR  China CNIC IHEP, Beijing Peiking University Beihang University  Switzerland CERN  Greece GRnet  Poland Jiagiellionian University in Krakow Third parties -- ASGC (Taiwan) -- Department of Biology, University of Rome3 (Italy)

7 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  7  EUChinaGrid WP’s  WP1 – Project Administrative and Technical Management  WP2 – Network planning and interoperability study Network connectivity Specific activity to study IPv4/IPv6 GRID interoperability.  WP3 – Pilot infrastructure operational support Specific activity to study interoperability between EGEE & CNGrid. Operational support of Advanced Services Promote new Asian Grid Infrastructure  WP4 – Applications EGEE applications (LHC, Bio, etc.) ARGO-YBJ and Gamma Ray Bursts(ARGO-YBJ/GRB) Never Born Proteins(NBP)  WP5 – Dissemination Project dissemination activities Dissemination of advanced knowledge on Grid technologies Promoting new communities

8 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  8  Applications over EGEE  High energy physics: ATLAS & CMS experimrnts at LHC  Astrophysics: the Cosmic ray Experiment ARGO in Yangbajing (Tibet)  Biology: New kinds of Proteins

9 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  9  Applications: LHC Experiments

10 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  10  Applications: ARGO – YBJ Laboratory Unique High Altitude Cosmic Ray Laboratory (4300 m) Tibet, 90 km North to Lhasa. Chinese-Italian collaboration. The Experiment data rate to be transferred is 250 TB/Year requiring a steady transfer rate of the order of 155 Mbps to Beijing and from there to Italy.

11 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  11  Applications: Never Born Proteins  The number of natural proteins on Earth, although apparently large, is only a tiny fraction of the possible ones: with 20 different co-monomers (the 20 different natural amino- acids), a polypeptide chain with 60 residues (n=60) can exist in 20 60 different chain structures. In nature, we have around 10 13-14 different proteins, so that the ratio between the possible and the actual number is staggeringly large.  This means that there is an astronomically large number of proteins that have never been seen on Earth - an incredibly large number of “never born proteins” (NBP).  The present research in the field is based on a computational approach to study a large library of NBP (10 9 protein sequences) to the aim of clarifying the structural principles that characterize them and of selecting a reasonable number of sequences which can potentially give rise to stably folded proteins.

12 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  12  NBP – First results  Rosetta ab initio protein structure prediction method NBP1 –1Trp exposed 1 SS bond NBP2 -1Trp exposed, 1 buried 2 SS bonds

13 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  13  Achievements in the first 10 months  Kick-Off Meeting in Athens, Greece, 25-26 Jan. 2006  First Project Workshop in Beijing,China12-14 Jun. 2006  First Project conference in Rome,Italy, 18 Sep. 2006  Workshop in EGEE06 conference in Geneva, 26 Sep. 2006  3 tutorials 2 of tutorials for Users and Site Managers in Beijing – China 3-7 Apr. 2006, 15-16 Jun. 2006 starting the creation of the core of Chinese trainers in the future events in China. 1 tutorials for Users in Rome – Italy, 11-13 Sep. 2006  Preliminary pilot infrastructure set-up (8 sites).  First applications requirements analysis started.  Dissemination in other conferences and in the press: a Chinese version of the project web site has been produced.

14 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  14  EUChina current infrastructure  Number of counties: 4 (China,Italy,Poland, Greece)  Number of sites: 8  Number of CPUs: 472  TBs of storage: 33  User in EUChina VO: 21  Migrated from LCG to gLite

15 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  15  EUChinaGrid Sites  Preliminary pilot infrastructure set-up (8 sites). BEIJING-CNIC-LCG2-IA64 (Beijing, China) BEIJING-LCG2 (Beijing, China) CYFRONET-IA64 (Crakow, Poland) CYFRONET-LCG2 (Crakow, Poland) GR-01-AUTH (Athens, Greece) INFN-CATALINA (Catania, Italy) INFN-CNAF (Catania, Italy) INFN-ROMA3 (Rome, Italy)  New site at Peking University in progress.

16 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  16  INFN Catania, CNAF, Roma3 Poland GRNet CNIC IHEP

17 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  17  EUChinaGrid current status  BDII,WMS,EUChina VOMS,etc have been deployed  Support EUChina VO, 21 users  CA operational in China: IHEP, CNIC  WN > 253, SE ~ 33 TB  ROC: http://roc.euchinagrid.org http://roc.euchinagrid.org  Monitoring GridICE,Gstat,Job Mornitoring,FTS Mornitoring,real Time Monitor,  SAM monitoring: https://euchina-sam.ihep.ac.cn/sam/sam.pyhttps://euchina-sam.ihep.ac.cn/sam/sam.py  Ticketing system: https://support.euchinagrid.org/  Migrated from LCG to gLite  VOMS backup service is in progress in CNIC

18 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  18  GridICE Monitoring

19 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  19  CNGrid  China National Grid  A key project supported by the National High-Tech R&D Program (the 863 program)  4-year effort May 2002 to Dec. 2005 Earliest and largest Grid project in China About 100 million government fund from the MOST of China 2 + times associated funds from local governments, application organizations, and industry  CNGrid middleware: GOS2.0 for supporting grid applications and Grid environment operation and management

20 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  20  CNGrid & EGEE interoperability  Interoperability can be implemented on different levels: Soap message level – Message format translation – Security information extraction & translation Service level – Batch job > Submit batch job to each other > It seems batch job level interoperability is most important between GOS and gLite – Information integrated > Aggregate service & resource information from different middleware > Provide query & update functions – Security mapping > Mapping user certificate and other security information between different middleware Application level

21 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  21  Interoperability Progress  A first base solution proposed GOS and gLite submit jobs each other trough gateway – gateway to bridge different middleware together – resource information aggregating, publishing and querying – find simplest way to submit batch job to each other  Testbed has been established (gLite, GOS)  Workshop organized at EGEE06, 26 th Sep, 2006

22 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  22  IPv4-IPv6 Interoperability Status  Grid middleware running on China National Grid (CNGrid) which both support IPv6 and IPv4  Promote CNGrid to use IPv6 backbone more effectively  Implement interoperable operation with European Grid middleware  Analysis of multi-protocol grid connectivity IPv6 – middleware under control:  Developer’s guide released  Code checker ready, but we have to run it on building system  New version IPv6 GOS will be running on most of CNGrid node  Set up two GOS nodes for test  Disscussed IPv4-IPv6 interoperibility on Workshop at EGEE06 IPv4-IPv6 interoperability: have started analysis

23 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  23  Applications Status EGEE application have been deployed or are being deployed on EUChina Sites.  CMS, ATLAS in IHEP  ARGO-YBJ: Data transfer system is in progress  Biology applications Protein folding application by JUMC just ported on grid and running on EUChinaGRID BUAA is porting its application to CNGrid and gLite

24 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  24  EUChina SAM Status  EUChina SAM Server has been deployed in IHEP, Beijing https://euchina-sam.ihep.ac.cn/sam/sam.py  SAM server & client in IHEP  DB – Oracle in IHEP  standalone data scheme (the data related with sites notes come from EUChina top-level BDII)  Server/Client have been installed properly and work fine  Services currently monitored by SAM: SE, CE, gCE, SRM, LFC FTS  The tests run every 3 hours, the results are visible immediately (for SE, SRM, LFC) or after 3 hours (for CE, gCE)  A temporary SAM server at CERN: https://lxb6111.cern.ch/sam/sam.py

25 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  25  SAM Monitoring

26 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  26  EUChina VOMS backup server  EUChina VOMS backup server is being deployed in CNIC Install gLite VOMS MySQL DB Synchronize the data between the main voms and the backup one Maintaince & upgrade

27 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  27  Collaboration with other projects  Collaboration and synergies with other EU projects: EUMEDGRID (www.eumedgrid.org)www.eumedgrid.org SEEGRID ( www.see-grid.org) EELA (www.eu-eela.org) ICEAGE BELIEF ( www.beliefproject.org) GRID@ASIA (www.gridatasia.net)www.gridatasia.net EUIndiaGRID (negotiating the contract with EU)

28 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  28  CERN resposibilities  WP3 – Pilot infrastructure Deployment & Operations (9PM) A3.1 CNGrid-EGEE interoperability A3.3 Operational support of advanced Services A3.3 Promotion of new Asian Grid (CERN coordinated)  WP4 – Applications (2.5 PM) A.4.3 Biology Applications  WP5 – Dissemination (2.5PM) A5.2 Dissemination of Advanced Knowledge Activities A5.3 Promoting new communicaties

29 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  29  Activities in IP-GD-OPS  VOMRS support Test Test script & code Submit/investigate VOMRS bugs in savannah Maintenance VOMRS in LCG production server Troubleshooting Handle and debug all the requests, questions, problems reported by CERN users (in GGUS & Remedy) Collect requirements and calls for improvement

30 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  30  Links http://www.euchinagrid.org/ http://www.euchinagrid.cn/ (Chinese version) http://roc.euchinagrid.org/ https://voms2.cnaf.infn.it:8443/voms/euchina/ https://euchina-sam.ihep.ac.cn/sam/sam.py https://support.euchinagrid.org/ http://euchina-gridice.cnaf.infn.it:50080/gridice/ http://www.euchinagrid.org/IPv6/ http://goc.grid.sinica.edu.tw/gstat/euchina/

31 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  31  1st EUChinaGrid workshop in IHEP, Beijing, 12 th -14 th Jun. 2006 EUChinaGrid workshop at EGEE06, in Geneva, 26 th Sep.,2006

32 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  32  谢谢!

33 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  33  Backup

34 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  34  TEIN2 Project  TEIN2 (Trans-Eurasia Information Network) Coordinated by DANTE and co-funded by EC within the 6th IST Framework Programme Aims to implement research and education IP direct connectivity between Europe and the Asia-Pacific region, and within Asia Pacific itself. first (current) phase: deployment of a high bandwidth connectivity (> 622 Mbits/s) to China before the end of 2005 2 routes: – northern (Trans-Siberian) of STM-4 capacity between EU and Beijing over one of the new trans-Siberian cable system – southern (Trans-Pacific) of STM-4 capacity (to provide a backup in case of damage etc)  Further information: http://www.tein2.nethttp://www.tein2.net

35 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  35  ORIENT Project  ORIENT (Oriental Research Infrastructure to European NeTworks) Presented at the same call of EUChinaGRID hes been approved. Coordinated by DANTE on the European side and by CERNET on the Chinese side Co-Funded 25% by EC, 25% by DANTE and the European NRENs and 50% by the Chinese Government aims to procure, implement and operate a high-speed (up to 2.5 Gbits/s) link between the Chinese academic networks CERNET and CSTNET and the corresponding pan-European network GEANT2. Preliminary plans for procurement and time schedules will be available for the EUChinaGRID kick-off meeting in Athens.

36 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  36  Network  ORIENT upgrade 1Gbps: 7 October  CSTNET will be connected

37 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  37  CNGRID Sites

38 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  38  Applications over CNGrid  NGG: National Geological survey Grid  DFG: Digital Forestry GriG  CMAG: China Meteorological Application Grid  SDG: Scientific Data Grid  DDG: Drug discovery grid  BAGrid: Bioinformatics Applied Grid  AviGrid: Aviation Manufacture Grid  Traffic Information Grid

39 Lanxin MA CERN/IHEP  Related projects summmary meeting  CERN 6 Nov. 2006  39  Project dissemination activities  Conference organization  Dissemination material for the conference  Press activities  New dissemination material (newsletter, FAQ, press kit)  3 tutorial just done  A big Local Training Team formed and tested  1 tutorial foreseen in November  Translating user guides in Chinese and maintain them