Download presentation
Presentation is loading. Please wait.
Published bySpencer Stevenson Modified over 9 years ago
1
Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to Replace the silicon detector - Radiation damage to inner layers, optical interconnects - SVT trigger – new silicon implies new trigger hardware Replace level 2 processors - Running to 2008-09 with the Alpha is not wise Replace Level 3 processors - Running to 2008-09 with 500 Mhz. Instantaneous luminosity of Run IIb motivates us to Replace TDCs - Data rate bottleneck at 300 Hz Replace Event Builder - Data rate bottleneck at 300 Hz Replace XFT - Track fake rate at high occupancy Replace Preshower - Last accessible piece of gas calorimetry. Long memory is swamped by occupancy.
2
Lukens - 2 CDF costs at level 3 Costs broken down by subproject Red – integrated luminosity Blue – instantaneous lum.
3
Lukens - 3 Run IIa/IIb Layout Comparison Run IIb Detector was designed for high occupancy 90 0 layers were abandoned – 3 layers was the maximum, and these aren’t robust Extra axial layers were substituted for redundancy Detector spacing is more diffuse – reduction of long extrapolations into “busy” areas Pattern recognition is more robust in a high rate environment.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.