BPVS Photovoltaics in the Berkshires Renewable Energy Summit June 7, 2005 Christopher Derby Kilfoyle, BPVS, Adams, MA www. bpvs.com.

Similar presentations


Presentation on theme: "BPVS Photovoltaics in the Berkshires Renewable Energy Summit June 7, 2005 Christopher Derby Kilfoyle, BPVS, Adams, MA www. bpvs.com."— Presentation transcript:

1 BPVS Photovoltaics in the Berkshires Renewable Energy Summit June 7, 2005 Christopher Derby Kilfoyle, BPVS, Adams, MA www. bpvs.com

2 Spring 2005 Total Installed Capacity Berkshire County: 111.2 kW 1980’s -1990’s -Early adopters -8 kW 1997- First Grid Connect System- New Marlborough-D. Fenton 2001- WMECo Solar Avenue Program-4 kW 2002-2005 –MTC/RET Programs and Grants- 90.6 kW 2002-2005- Other-7.6 kW BPVS Institutional-79 kW Grid connect homes-24.2 Stand Alone-8 kW 2.4 kW Grid Connect Wilson System, Lanesboro MTC- WMECo Solar Ave. Grant

3 BPVS Williamstown Elementary School 24 kW MTC Green Schools Program

4 BPVS PV Capacity is Versatile 1.2 kW Off Grid Home Meiklejohn-Clarksburg 200 watt Dedicated Load Water Pumping Caretaker Farm, Williamstown

5 BPVS Massachusetts PV Products- Global Leadership 7.2 kW Array – Williams College- RWE-Schott Modules and Mounts MTC- CET Berkshire Cluster Grant

6 BPVS Cunningham Residence- Southfield 1.2 kW array with Solectria Inverter MTC- BPVS SMI Grant

7 BPVS Net Metering- WMECO and MECo Dinerman Residence- Lee MTC-BPVS-SMI Grant

8 BPVS Berkshire Expertise Sam Vince- Williamstown Wire Inspector Williamstown Elementary School PV Electronics Clarksburg, Florida, Great Barrington, Lanesborough, Lee, Lenox, Monterey, New Ashford, New Marlborough, North Adams, Pittsfield, Richmond, Tyringham, West Stockbridge, Williamstown.

9 BPVS Early Adopters- Stephen and Leanore Congdon Richmond MA

10 BPVS Congdon Production 2001-2005 *System Expansion in Sept 2001

11 BPVS Knowles System- Lenox Passive Solar Home with both Hot Water and PV Panels MTC-BPVS SMI Grant

12 BPVS PV Near Term Challenges Industry: Meet Increased Demand & Decrease Costs Expand Infrastructure, Become User & Installer Friendlier Codes: NEC ® National and MA Electrical Code is current Ma Building Code 780 CMR needs to recognize PV better Interconnections: Network Distribution Feeders ( eg. Downtown Pittsfield) Uniform Metering protocols. Policy: National Net metering & Federal leadership for a level playing field with conventional generation. Weaning the Industry from construction subsidies and promoting a commercial market for Clean Energy Production. Global Competitiveness Strategies

13 BPVS Gratz-Piasecki 2.4 kW system-W. Stockbridge MTC-BPVS-SMI Grant