Download presentation
Presentation is loading. Please wait.
Published byGrace Boyd Modified over 11 years ago
1
TransPAC2 Update Brent Sweeny TransPAC2 Engineer 24 January 2008 APAN Honolulu
2
Preview Staffing changes Topology Description RFP Status Internet2 DCN Connectivity perfSONAR update (John Hicks)
3
Staffing Changes Former engineer Chris Robb has taken a position at Internet2 as Manager of Network Operations Brent Sweeny will take on primary TransPAC2 engineering responsibilities Please add Brent to all relevant engineering lists (sweeny@grnoc.iu.edu)sweeny@grnoc.iu.edu
4
Current Topology No significant topological change in the last year
5
Q2 2008 Topology Additional connectivity from Pacific Wave to Internet2 DCN Los Angeles Node
6
Internet2 DCN Connectivity Problem: TransPAC2 is a production Layer3 routed IP network Problem: Researchers in Asia want to explore Layer2 connectivity to the Internet2 DCN Network via TransPAC2 Solution: MPLS L2VPN and Juniper CCC to stitch an end-to-end Layer2 path between Tokyo and Los Angeles
7
DCN Topology Illustration
8
perfSONAR Architecture Measurement Points Data Services Measurement Archives Transformations Service Configuration Auth(n/z) Services Infrastructure Information Services Topology Service Lookup Analysis/Visualization User GUIs Web Pages NOC Alarms
9
Adoption of perfSONAR R&E Networks –Internet2 –ESnet –GÉANT2 –European NRENs –RNP Application Communities –LHC –Others
10
Deployment strategy LS, MA (snmp, bwctl, owamo ) LS,MA (snmp, bwctl, owamp) MA (snmp, bwctl, owamp)
11
Questions? Engineering: Brent Sweeny sweeny@grnoc.iu.edu sweeny@grnoc.iu.edu Measurement: John Hicks jhicks@iupui.edu jhicks@iupui.edu Administrative: Jim Williams william@indiana.edu william@indiana.edu NOC Desk noc@transpac2.netnoc@transpac2.net
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.