1
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference October 2011 Completing a Project – Cradle to Grave Completing a Project – Cradle to Grave
2
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
3
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
4
Risk of failure Project Need canal river
5
Water loss Project Need
6
Maintenance Project Need
7
Public Health and Safety Project Need
8
Regulatory Project Need
9
Capital Improvements Plan Project Need
10
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
11
Preliminary Engineering Report (PER) Technical presentation (alternatives analysis) Environmental evaluation Financial presentation Project management and implementation Resource and citizen benefit Planning
12
Alternatives analysis Renewable resource benefit Cost effectiveness Reliability Environmental impact Operational ease Planning
14
Planning Grants - Department of Natural Resource Conservation (DNRC) Call DNRC Renewable Resource Grant and Loan (RRGL) Program Apply for planning grant Hire Engineer Prepare Preliminary Engineering Report (PER) Submit (PER) for RRGL grant Planning grant (2011)/RRGL grant (2013) Planning
15
How to hire an engineer District vs. Company if fees > $20,000, then MCA MCA Title 18.8.Part 2 – Procurement of Services MCA Title 7.1.2121 – Publication and content of notice Planning
16
How to hire an engineer http://www.map-inc.org/pdf/HowtoHireanEngineer-0207.pdf http://www.map-inc.org/pdf/HowtoHireanEngineer-0207.pdf Planning
17
Engineer’s team Survey Environmental Drafting Geotechnical Cultural Grant writer Owner Legal Insurance Planning
20
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
21
Preferred alternative from PER Design calculations and documentation Preliminary drawings and specifications Funding/grants in place Preliminary Design
22
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
23
Talk to your engineer Reference environmental evaluation in PER Call agencies Examples: MPDES (Erosion) Section 404 (USACE) Floodplain Navigable Rivers (DNRC) Permitting
24
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
25
Final drawings Technical specifications Review package Engineer’s quality assurance review Owner Regulatory agencies Permitting agencies Final Design – Construction Documents
26
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
27
Bid documents 1.Plans 2.Technical specifications 3.Front-end contract documents Bidding
28
Front-End Invitation to bid Bid form Owner – contractor agreement General conditions Special provisions Misc. forms Notice of award Notice to proceed Bidding
29
State procurement rules If bid >$75,000, then MCA MCA title 18.2.Part 3 – Contract Requirements and Restrictions MCA Title 7.1.2121 – Publication and content of notice Bidding
30
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
31
Owner Engineer Contractor Construction
32
Resident Project Representative Construction diary Payment applications Requests for information Shop drawings Close-out Construction
33
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
34
Punch-list Warranties Record drawings Final payment Funding agencies Close-out
35
Questions ???