2 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

3 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

4 Risk of failure Project Need canal river

5 Water loss Project Need

6 Maintenance Project Need

7 Public Health and Safety Project Need

8 Regulatory Project Need

9 Capital Improvements Plan Project Need

10 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

11 Preliminary Engineering Report (PER)  Technical presentation (alternatives analysis)  Environmental evaluation  Financial presentation  Project management and implementation  Resource and citizen benefit Planning

12 Alternatives analysis  Renewable resource benefit  Cost effectiveness  Reliability  Environmental impact  Operational ease Planning

13

14 Planning Grants - Department of Natural Resource Conservation (DNRC)  Call DNRC Renewable Resource Grant and Loan (RRGL) Program  Apply for planning grant  Hire Engineer  Prepare Preliminary Engineering Report (PER)  Submit (PER) for RRGL grant  Planning grant (2011)/RRGL grant (2013) Planning

15 How to hire an engineer  District vs. Company  if fees > $20,000, then MCA  MCA Title 18.8.Part 2 – Procurement of Services  MCA Title 7.1.2121 – Publication and content of notice Planning

16 How to hire an engineer  http://www.map-inc.org/pdf/HowtoHireanEngineer-0207.pdf http://www.map-inc.org/pdf/HowtoHireanEngineer-0207.pdf Planning

17 Engineer’s team  Survey  Environmental  Drafting  Geotechnical  Cultural  Grant writer Owner  Legal  Insurance Planning

18

19

20 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

21 Preferred alternative from PER Design calculations and documentation Preliminary drawings and specifications Funding/grants in place Preliminary Design

22 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

23 Talk to your engineer Reference environmental evaluation in PER Call agencies Examples:  MPDES (Erosion)  Section 404 (USACE)  Floodplain  Navigable Rivers (DNRC) Permitting

24 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

25 Final drawings Technical specifications Review package  Engineer’s quality assurance review  Owner  Regulatory agencies  Permitting agencies Final Design – Construction Documents

26 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

27 Bid documents 1.Plans 2.Technical specifications 3.Front-end contract documents Bidding

28 Front-End  Invitation to bid  Bid form  Owner – contractor agreement  General conditions  Special provisions  Misc. forms Notice of award Notice to proceed Bidding

29 State procurement rules  If bid >$75,000, then MCA  MCA title 18.2.Part 3 – Contract Requirements and Restrictions  MCA Title 7.1.2121 – Publication and content of notice Bidding

30 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

31 Owner Engineer Contractor Construction

32 Resident Project Representative  Construction diary Payment applications Requests for information Shop drawings Close-out Construction

33 Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

34 Punch-list Warranties Record drawings Final payment Funding agencies Close-out