Presentation is loading. Please wait.

Presentation is loading. Please wait.

Graphing Behavior & Measuring Change Graph Construction Research Design Graph Interpretation Using Excel to Construct a Graph.

Similar presentations


Presentation on theme: "Graphing Behavior & Measuring Change Graph Construction Research Design Graph Interpretation Using Excel to Construct a Graph."— Presentation transcript:

1 Graphing Behavior & Measuring Change Graph Construction Research Design Graph Interpretation Using Excel to Construct a Graph

2 Graph Construction

3 x-axis y-axis Quantity Time

4 Graph Construction Explicit Graph Title y-axis Title y-axis Labels x-axis Title x-axis Labels

5 Graph Construction Phase Labels Phase Lines Data Points

6 Research Design A-B A-B-A A-B-C-A Changing Criteria

7 A-B design

8 A-B-A design

9 A-B-C-A design

10 Changing Criteria design

11 Graph Interpretation Common Data Patterns

12 LEVEL

13 SLOPE A B A

14 Abrupt Change in Level A B

15 Delayed Change in Level A B

16 Temporary Change in Level A B

17 Decaying Change in Level A B

18 Abrupt Change in Slope A B

19 Delayed Change in Slope A B

20 Temporary Change in Slope A B

21 Accelerated Change in Slope A B

22 Change in Variability A B

23 Pattern 1 A B

24 Pattern 2 A B

25 Pattern 3 A B

26 Pattern 4 A B

27 Pattern 5 A B

28 Pattern 6 A B A

29 Using Excel to Construct a Graph

30 Using Excel to Draw Graphs (A) Baseline Graph (A-B) Two Phase Graph (A-B-A) Three Phase Graph

31 Baseline Graph A

32 Step 1. Enter data for the Baseline Phase

33 Step 2. a. Highlight the graph information b. Click on the Graph Icon; c. Choose Line Graph d. Choose Graph Style e. Click on Next Graph Icon Line Graph Graph Style Next Highlight Graph Info

34 Step 3. Click on Next Next

35 Step 4. a.Type Chart Title b.Type X axis Label c.Type Y axis Label d.Click Next Chart Title X axis Label Y axis Label Next

36 Step 5. Click Finish Finish

37 Step 6. Admire Your Work

38 Two Phase Graph A-B AB

39 Step 7. Enter data for second phase. Note: data is not entered into same column as Baseline data

40 Step 8. Do exactly as you did in Step 2 except you must choose the line graph style indicated. Choose This Line Graph Style Only Step 9. Do exactly as you did in steps 4 and 5.

41 Step 10. Add a Phase Line a. Click on the line shape b. Draw the phase line on the graph

42 Step 11. Add Phase Labels a. Click on the text Box b. Align the text box and type the phase label

43 Step 12. Enjoy Your Work AB

44 Three Phase Graph A-B-A ABA

45 Step 13. Add additional data to appropriate column Step 14. Do everything else the same

46 Enjoy Your Work ABA

47 Practice Graph #1 Time = consecutive school days. Behavior = number of errors on a daily 10 word spelling test. Baseline = no intervention. Intervention = mental rehearsal prior to taking the test. Baseline 1Intervention Phase 1 Baseline 2Intervention Phase 2 5342 4261 5251 6170 00 0

48 ABAB

49 Practice Graph #2 Time = consecutive school days. Behavior = Spontaneous Utterances during a 30 minute Free Play Time. Baseline = no intervention. Intervention 1 = Verbal Praise. Intervention 2 = Physical Touching + Verbal Praise Baseline 1Intervention 1Baseline 2Intervention 2 0101 0223 2035 1114 106 0


Download ppt "Graphing Behavior & Measuring Change Graph Construction Research Design Graph Interpretation Using Excel to Construct a Graph."

Similar presentations


Ads by Google