23 - 1 NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005
2
23 - 2 NASA’s Goddard Space Flight Center LRO testing shall be in accordance with the “LRO Verification Plan”, 431-PLAN-000101. LRO integration and test shall be performed per the “LRO Integration and Test Plan”, 431-PLAN-000100. LRO launch site activities shall be performed in accordance with the “LRO Launch Site Support Plan”. I&T Driving Documents
3
23 - 3 NASA’s Goddard Space Flight Center I&T Document Tree RLEP Mission Assurance Requirements 430-RQMT-000006 LRO Mission Requirements Document 431-RQMT-00004 LRO Electrical Systems Specification 431-ICD-000008 Mechanical Systems Specification 431-RQMT-000012 Contamination Control Plan 431-PLAN-000110 Thermal Systems Specification 431-SPEC-000091 GENERAL ENVIRONMENTAL VERIFICATION STANDARD (GEVS) SC Subsystem & Instr. ICDs / Specifications/ Requirements Subsystem & Instr. Interface / Assembly Drawings Observatory Verification Plan & Matrix 431-PLAN-000101 LRO Ground System ICD 431-ICD-000049 Rules for the Design, Development, Validation, and Operation Of Flight Systems GSFC-STD-1000 SC PAIP 431-PLAN-000131 LRO Detailed Mission Requirements (DMR) for the LRO Ground System 431-RQMT-000048 LRO Mission Vehicle Interface Control Doc LRO System Safety Plan 431-PLAN-000176
4
23 - 4 NASA’s Goddard Space Flight Center Integration and Test Plan 431-PLAN-000100 Observatory Verification Plan & Matrix 431-PLAN-000101 Test Plans & Procedures WOAs LRO System Safety Plan 431-PLAN-000176 Mission Readiness Test Plan 431-PLAN-000079 Handling & Lift Procedures Simulations Contamination Control Plan 431-PLAN-000110 I&T Document Tree – cont. ITOS Procs Test Results And Reports Verification Matrix SC PAIP 431-PLAN-000131 GSE Requirements/ Specification Docs LRO Detailed Mission Requirements (DMR) for the LRO Ground System 431-RQMT-000048 Instrument Integration & Test Plans
5
23 - 5 NASA’s Goddard Space Flight Center I&T Document Tree – cont. Launch Site Support Plan LRO MSPSP Ground Operations Procedures Integration and Test Plan 431-PLAN-000100 LRO System Safety Plan 431-PLAN-000176
6
23 - 6 NASA’s Goddard Space Flight Center Orbiter Integration & Test Flow - 1 OB - Instrument Integration & Alignment Propulsion Module Delivery Inst. Interface Check Out W/ Flat Sat Battery & PSE Plate Integration Flat Sat Build Up and Checkout Flt. Power System Delivery Flt. C&DH System Delivery C&DH Plate Integration Upper Structure Integration Reaction Wheel Integration Optical Bench Delivery ST & IRU Integration & Alignment Battery & PSE Orbiter Integration & Test C&DH Integration & Test PDE Integration & Test RF components Integration & Test Preliminary Bus Functional Testing Optical Bench Integration & Test SA and HGA Integration & Test Bus Mounted Instrument Integration & Test
7
23 - 7 NASA’s Goddard Space Flight Center Orbiter Integration & Test Flow - 2 Time Offset/Drift Test CPT ACS Polarity Test Alignment Baseline Jitter Characterization S/A and HGA Deployment Tests LOLA Boresight Alignment Instrument Functional Tests LAMP End to End Test Comm Sys End to End Test Day In the Life RF Compatibility Test Mission Sims
8
23 - 8 NASA’s Goddard Space Flight Center Orbiter Integration & Test Flow - 3 Separation/ Shock Test Alignment Check & Functional Test EMC Thermal Vac & Balance Pre-Ship Activities Alignment Check Post Environmental CPT Bus & Instrument Special Tests Ship To KSC Post-Ship Activities Post-Ship Functional or CPT Pad Readiness Activities Pad Installation Pad Aliveness Test Fairing Installation Final Close Outs LAUNCH Spin Balance / Mass Properties Sine Vibe W/ Aliveness Acoustics W/ Aliveness Pre-Environmental Review Fueling
9
23 - 9 NASA’s Goddard Space Flight Center I&T Verification Summary Interfaces –Mechanical Integration; Electrical Integration Procedures; Polarity test; Alignment; Spin Balance; Mass Properties Functionality Hardware –Functional Test; Performance; Time verification; End to End Tests; Deployment Tests Functionality Software –Day in the Life; Separation timeline; Mission Sims Environments –Contamination; Jitter Characterization; Sine Vibe; Acoustics; Shock / Separation Test; EMC; Thermal Vac / Balance Instrument Special Tests (unique configurations) –LOLA: Boresight alignment check; LAMP: End to End Test;
10
23 - 10 NASA’s Goddard Space Flight Center Ground Support Equipment – Orbiter Level Simulators: Instrument simulators, Spacecraft simulators; Flat Sat Mechanical GSE –Lift fixtures, handling dolly, turnover fixture, transportation fixture, thermal vac support structure. C&DH GSE –Front End Processors – S-band & Ka-band –1553 Bus Monitor –Space Wire Test Rack –Data Storage –Workstations RF racks & antenna hats Time test rack Power GSE –Solar Array Simulator; Battery Simulator; Load Box ACS GSE –Dynamic Simulator; ACS component stimulators: Star Tracker, IRU Propulsion module simulator/GSE Instrument Unique Ground Support Equipment –CRaTER: CO60 source; non-ITOS workstation; Diviner: BCE; LAMP: Vac Ion, Pump, UV light source; LEND: Californium source; LOLA: Laser Test Equipment (BCE), target; LROC: none identified Contamination –Instrument GN2 purges
11
23 - 11 NASA’s Goddard Space Flight Center I&T Summary Instrument requirements identified to date and understood. Most difficult area will be thermal vac test configuration. –Testing may be limited by configuration limitations. Other I&T requirements are not unique and can be realized. I&T plan will be in released draft form by mission PDR. Ready to proceed with preliminary design.