Presentation is loading. Please wait.

Presentation is loading. Please wait.

PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.

Similar presentations


Presentation on theme: "PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher."— Presentation transcript:

1 PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher

2 PACS IHDR MPE 12/13 November 2003 AIV 2 Approach to Instrument AIV: Integration, Qualification and Testing Integration of Instrument Subunits takes place at the individual manufactureres of the respective Subunit. Integration of PACS Units for Instrument testing takes place at MPE under it‘s responsibility. Qualification of Instrument Subunits and Units (performance and environmental qualification) is verified by the individual manufacturers before delivery of a Unit to MPE. Delivery reviews will be held. PACS Instrument Integration and Testing starts with the delivery of Units, acceptance of a Unit is based on a complete ADP and Incoming Inspection Plan. AIV program and updated flow charts (giving the status at the time of IHDR) will be included in AIV Plan PACS-ME-PL-018-issue1. Verification of PACS instrument performance is done by MPE and is based on Instrument Level Tests (ILTs) according to PACS-ME-PL-012-issue2. Test flows and schedules will be specified for all individual PACS models. Verification of PACS instrument performance requirements is assured by tracing the specifications listed in the PACS Calibration Document PACS-MA-GS-001 to the individual test steps carried out during ILT.

3 PACS IHDR MPE 12/13 November 2003 AIV 3 Content of Instrument Verification Documents 3 documents specify the PACS AIV activities on Instrument Level. The basic DDVP PACS-ME-PL-002 will not be updated any more as the general development programs are completed and remaining activities concentrate now on solving a few specific problems Instrument AIV Plan, describes general assembly organization, integration concept and integration sequences, but does not include the ILT related details; update to PACS-ME-PL- 018 iss.1 is due Instrument Test Plan, covers all test activities and all test related AIV, shows the verification control matrix w.r.t. instrument models and instrument performance; update to PACS- ME-PL-012 iss.2 is due PACS Calibration Document, PACS-MA-GS-001 draft7 is getting permanently refined and will be used to relate instrument performance specifications to certain ILT test steps (verification control document), PCD requirements traceability matrix will be included in issue 2 of Test Plan

4 PACS IHDR MPE 12/13 November 2003 AIV 4 AVM WE Integration Sequence (no change since IIDR)

5 PACS IHDR MPE 12/13 November 2003 AIV 5 General Instrument AIV Sequence including ILTs (sequence is different for individual PACS models, details see PACS-ME-PL-012 iss2)

6 PACS IHDR MPE 12/13 November 2003 AIV 6 Compatibility of CQM+AVM Test Program with current test time limitation Fairly comprehensive CQM characterisation program can be carried out CQM schedule is very tight because start date is dictated by late deliveries of subunits and a quite pressing delivery date of AVM and CQM to ESA Proposed 25 % shortening of CQM ILT program compared to PFM ILT program is achieved by reducing the test parameter space and not doing a perfect wavelength calibration with TUFIR facility  results in less information concerning calibration accuracy, e.g., linearity, wavelength accuracy, sample points in calibration curves etc.  provides a good information on design verification and instrument characterisation (but, search for spectral ghosts in the FPU spectrometer section is not possible).  maintains the chance of not missing a last feed-back to a PFM FPU improvement (e.g., baffling)

7 PACS IHDR MPE 12/13 November 2003 AIV 7 Overall Configuration of ILT Set-up during AVM+CQM, FM, FS

8 PACS IHDR MPE 12/13 November 2003 AIV 8 FPU STM Upgrade and Cryogenic Vibration Sequence (STM cryovibration foreseen to replace CQM cryovibration, RFW-007 issued)

9 PACS IHDR MPE 12/13 November 2003 AIV 9 CQM+AVM Instrument Integration and Test Sequence

10 PACS IHDR MPE 12/13 November 2003 AIV 10 EMC Test Sequence during ILT EMC Conducted Emission and Susceptibility Test (common mode) on Signal Reference - steady state & - transients

11 PACS IHDR MPE 12/13 November 2003 AIV 11 Duration AVM ctd Test and CQM+AVM Instrument Integration

12 PACS IHDR MPE 12/13 November 2003 AIV 12 Duration CQM+AVM Instrument Test Sequence

13 PACS IHDR MPE 12/13 November 2003 AIV 13 PFM Instrument Integration and Test Sequence

14 PACS IHDR MPE 12/13 November 2003 AIV 14 Duration PFM Instrument Integration and Cryovibration

15 PACS IHDR MPE 12/13 November 2003 AIV 15 Duration PFM Instrument Test Sequence

16 PACS IHDR MPE 12/13 November 2003 AIV 16 FS Instrument Integration and Test Sequence

17 PACS IHDR MPE 12/13 November 2003 AIV 17 Duration CQM FPU Refurb.+ FS Instrument Test Sequence


Download ppt "PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher."

Similar presentations


Ads by Google