Contractor EHS Performance Data May, 2013. Freeport Site w/o Gulfstream.10 Dow.07 Site Contractors.18 Site Contractors w/o Gulfstream.14 Number of OSHAs.

Similar presentations


Presentation on theme: "Contractor EHS Performance Data May, 2013. Freeport Site w/o Gulfstream.10 Dow.07 Site Contractors.18 Site Contractors w/o Gulfstream.14 Number of OSHAs."— Presentation transcript:

1 Contractor EHS Performance Data May, 2013

2 Freeport Site w/o Gulfstream.10 Dow.07 Site Contractors.18 Site Contractors w/o Gulfstream.14 Number of OSHAs Dow 1 Contractor 3 2013 YTD OSHA Rates

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39 RECOGNITION

40 J&L Paint: Jake Davis, John Higgins, JC Jones, Leon Gibson & Chris Mariscal provided quality work while being safe and doing a great job with communicating hazards & housekeeping on every job @ B-43, B-52, B39 & B-62. Miken: B-1500 Crew safely & successfully built & removed a scaffold @ PS column in the B-1500 block. This crew was cooperative and had a good safety attitude. Brand: Insulators & Scaffold working @ B1900 Throx showed good safe & productive craftsmanship. Brand: Painters working @ A2400 did an excellent job and completed work safely. Brand: Ervin Woodard and Crews did a great job communicating & ensuring scaffolding wasn’t an issue during the turnaround. Brand: OC-5 Turnaround crew provided good communication on headcount & scheduling needs as well as monitoring jobs to be ready to insulate equipment. Brand: B-8400 T/A Crews worked hard & had a great attitude while performing their job safely. Brand: Amber Smith & Jessica Symonds immediately identified & reported a leak (Level 1 release) on the PDC Bottoms piping.

41 Brand: Scaffold crew @ Power 9 HRSG escalated a scaffold concern & Dow welcomed the input and followed up on it. Brand: Insulators did a great job on the Shutdown with both urgent & planned work to keep ahead of schedule and got the job completed safely. Brand: Scaffold crew @ B-7200 effectively assisted maintenance in revising, building & tearing down scaffold when needed and completed the job safely. Brand: Job well done @ OC-600 on the F-3 Recoil and the work was done without incident. Brand: Brand Metal Shop workers who fabricate metal in the shops does a great job with quality & time while completing work safely. CH2MHill: Randy Graves performed a quality job safely and worked very hard to maintain schedule @ the LHC-9 Site. Total Safety: Employees helped with the traffic control during the clearing stage and the LHC-7 (B72) turnaround. They did an excellent job by maintaining the flow of traffic safely. To see the full recognitions, please go to www.tocas.orgwww.tocas.org

42 REMINDERS  MAY EMPHASIS & STAC INSERT (HEAT STRESS)  WWW.TOCAS.ORG WWW.TOCAS.ORG  NEXT SAFETY CONTACT MEETING 6/13/13