Presentation is loading. Please wait.

Presentation is loading. Please wait.

4NJT opt BuildingSMART Munich APRIL - 2006. ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich.

Similar presentations


Presentation on theme: "4NJT opt BuildingSMART Munich APRIL - 2006. ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich."— Presentation transcript:

1 4NJT opt BuildingSMART Munich APRIL - 2006

2 ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich April 2006

3 ‘What does BDP want from the System Houses ?’

4 World Architecture league tables 2005 WORLD

5 Profession Mix Graphic Designers 1.5% Architects 57.0% C & S Engineers 9.0% Interior Designers 7.0% Landscape Architects 4.0% PM/PP 4.0% QS 2.0% Planners 2.0% CLW 1.0% Environmental Engineers 12.5%

6 BDP’s Mission “ To be collaborative, working in partnership with clients, colleagues in construction, the users of our buildings and the communities in which we work”

7 PDF JPG DXF DWG DXF Multi Platform Process Multiple tools Communication within BDP and with multiple firms

8 Installed concurrently 800 Seats MicroStation 350 Seats Bentley Architecture 3 Seats Bentley Structural 5 Seats Bentley HVAC 1 Seat AutoCad 220 Seats Sketchup 500 Seats Cadduct 50 Seats Other software 150 different systems List of Seats

9 BDP’s Vision “ A universal basis for process improvement and information sharing in the design, construction and FM industries ”

10 4D Schedules Logistics Information Delivery (ID) Functional description Functions Calculations Requirements Constraints Knowledge databases Company External Rules and regulations Bldg, H&S, Planning Simulation Comfort Air, heating Lifecycle costs Light and sound Insulation Use Fire Environmental impact Life expectancy Description Inc cost estimates Sourcing Product databases Price databases FM Renting, sale and use Maintenance Warranty Reuse Refurbishment Demolition Reconstruction VRML Visualisation 3D models Source: Janne Aas-Jakobsen modified. Pictures from: Selvaagbygg, DDS, Byggforsk, NBLN University of California, CIFE Stanford, Pythagoras and Oluf Granlund Yo. ID ID ID BIM software Arch, Struct, Eng Services Civ Eng

11 As System Users “ We want OPEN systems to share data and information throughout the project life cycle”

12 The relationship People Technology Knowledge management ICT enabled Integrated working Process ICT Enabled Integrated Working

13 Project domain Private domain Published domain Web page FTP Email attachment Dedicated data link Hard copy Data 3rd party system A Seamless way of working

14 Private domain Use of document control tools: Use of data management tools Managed service by others. Controlled access via Internet Data Project domain Published domain Interface issues A Seamless way of working

15 Common Data Environment 2/3/4D co-ordinated modelling Electronic data management Analysis applications Electronic document control BDP knowledge databases Visualisation and presentation tools Data communications networks Voice communications networks Mobile and home working Technology not invented yet

16 Project A File System E-Mail Folders Project Directories Project/ Groupware Files Project B File System E-Mail Folders Project Directories Project/ Groupware Files Project C File System E-Mail Folders Project Directories Project/ Groupware Files Eliminate Islands of information

17 Project A File System E-Mail Folders Project Directories Project/ Groupware Files Project B File System E-Mail Folders Project Directories Project/ Groupware Files Project C File System E-Mail Folders Project Directories Project/ Groupware Files Eliminate Islands of information relearn reinvent recreate repeat

18 Project A Project B Project C Project Team Knowledge Base Project Team Knowledge Base Project Team Knowledge Base Enterprise Wide Knowledge Base Enterprise wide knowledge base

19 The route to advanced integrated projects Integration Paper Based CAD 3D CAD BIM & 4/5D 70’s 80’s 90’s00’s Time

20 BDP’s Wants Partnership – not just to purchase products Help drive product development Focus on workflow effectiveness No limitation on deployment of technology

21 BDP’s Wants Open flow of data Faster development of component BIM model libraries

22

23 Nick Terry

24 End


Download ppt "4NJT opt BuildingSMART Munich APRIL - 2006. ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich."

Similar presentations


Ads by Google