Download presentation
Presentation is loading. Please wait.
Published byPrudence Lester Modified over 9 years ago
1
1 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 57 th EXECUTIVE COMMITTEE Meeting, Montecatini (Italy) IEA HIA Task 24 “ Wind Energy and Hydrogen Integration” TASK REPORT Dr. Luis Correas Mr. Ismael Aso
2
2 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 OBJECTIVES TASK 24: To explore in detail all possible issues (Technical, Economical, Social, Environmental, Market and Legal) related to hydrogen production using electrolysis with wind energy. To explore in detail possible applications for hydrogen produced by electrolysis using wind energy, with special emphasis on full wind & hydrogen integration by means of hydrogen storage and electrical conversion that balances the original wind energy production, allowing an approach to demand that closes the gap with conventional energies.
3
3 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 PRIOR STEPS 53 rd IEA HIA ExCo meeting (Singapore, November 2005): The interest on starting a new task on “wind energy & hydrogen integration” is endorsed by the ExCo. The Spanish representative takes the lead. 54 th IEA HIA ExCo meeting (Lyon, June 2006): Dr. Luis Correas (Fundación Hidrógeno Aragón) and Mr. Fernando Tamayo (Gamesa Energía), presented a first draft of the new task. Project Definition Meeting (Brussels, 4th October 2006): attendance of 15 people from 7 countries. A revised draft has been released, with a matured work plan proposal. Pending confirmation of participation, especially from electrolyser manufacturers. 55 th IEA HIA ExCo meeting (Petten, November 2006): the Task is finally approved by the ExCo, and a kickoff meeting was made for spring 2007, in order to confirm participation. 56 th IEA HIA EXCo Meeting (Rapperswill, May 2007): First SAR showed and first Meeting, Canary Island October 2007
4
4 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS Creation of a new Web Page for Task 24 (July 2007) http://task24.hidrogenoaragon.org
5
5 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS Private web page accesses
6
6 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS Diffusion Control for Task 24
7
7 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS “ Home work” sent July
8
8 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS “ Home work” filled: Example Jórg Linnemann (Planet Gbr, Germany)
9
9 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS Meeting with WIA (September 2007)
10
10 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (23-25 October 2007) NameEnterpriseCountry 1Rupert GammonDirector, Bryte Energy LtdUk 2Ken-ichiro OtaYokohama National UniversityJapan 3Sam MiyashitaENAAJapan 4Pablo FontelaEndesaSpain 5Joerg LinnemannPlanet GbRGermany 6Claus JorgensenRISODenmark 7Ernest BurkhalterIHTSwitzerland 8Eli VarkarakiCRESGreece 9Javier PinoSeville UniversitySpain 10Salvador SuarezITCSpain 11Hoskin, AaronNatural Resources of CanadaCanada 12Felipe RosaINTASpain 13Luis Correas UsonAragon Hydrogen FoundationSpain 14Ismael AsoAragon Hydrogen FoundationSpain 15Kevin HarrisonNRELEEUU 16Pilar ArgumosINTASpain List Participants 1 Meeting ( 9 Countries, 16 Attendees)
11
11 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 RES2H2 Wind-Desalination Plant in Pozo Izquierdo. Site of Fall 2007 Expert meeting. Visit to RES2H2 Project ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (23-25 October 2007)
12
12 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (26 October 2007), 8 speakers belonged to Task 24
13
13 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (23-25 October 2007)
14
14 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (23-25 October 2007) Collaborations between Task 24 and Task 18 : Subtask B Leader Task 18 Free : www.hidrogenoaragon.org
15
15 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 Subtasks S1 07S2 07S1 08S2 08S1 09S2 09S1 10S2 10 A PRELIMIN ARY REVIEW REPORT ON STATE OF THE ART UPDATE B PRELIMINI ARY REDESIG N FINAL REDESIG N C METHOD OLOGY & TOOLS CASE STUDIES DEFINITIO N REPORTFINAL UPDATE D WIND ENERGY CONSTRA INTS ANALYSIS FULL INTEGRAT ION WIND TO H2 DOCUME NT WORK PLAN Task 24
16
16 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ACTIVITIES DURING THE LAST 6 MONTHS First Meeting Canary Island (23-25 October 2007) Decisions taken during the 1 st Meeting
17
17 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 REVIEW ABBREVIATED WORK PLAN AND MILESTONE FOR THE LAST SEMESTER - Confirm participation of attendees in the Task. Submission of National Participation Letters (Alredy 6 NPL) and volunteers for Subtask leadership (DONE) - Contact Task 18 at OA level to detect cooperation opportunities and avoid duplication of efforts. (DONE, Subtask B Leaders) - Contact WIA Annex 25 at OA level to detect synergies. Contact WIA to present Task 24 (if agreed by HIA ExCo) (DONE) - To elaborate a preliminary report on the state of the art, regarding existing and on-going hydrogen- wind projects, literature of reference, technology state of the art for wind turbines and electrolysers.(Semi DONE, “Collected Home Work”, work with Subtask A Leader) -Develop the methodology and tools requires to develop Subtask C. A report will be issued regarding the status of regulations on electricity and fuels in a country basis, prognosis on wind electricity penetration, existing studies and working groups, potential markets for hydrogen (niche - willingness to pay – and mass markets - competition in commodity markets -), methodology for calculations (definition of terms and tools and software)..(Semi DONE, “Collected Home Work”, work with Subtask C Leader) - Next meeting will be hold coinciding with Task 18 semester meeting, in mid October (date to be confirmed), hosting ITC (Instituto Tecnológico de Canarias - Canary Islands). (DONE)
18
18 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 ABBREVIATED WORK PLAN AND MILESTONE FOR THE NEXT SEMESTER
19
19 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 “ This propose participation, will not attend the Meetings, but contribute to the Task, in order to better accomplish the activities agreed by all members, The associate member would have limit access to the private information” Cases : Geoff Dutton : H2NET Director, United Kingdom Hernán De Battista (LEICI), Argentina (NOT IEA HIA Member) Suzanne SHAW European Union DG JRC. THE EXCO COULD ANALYZE THE POSSIBLE PARTICIPATION AS “ASSOCIATE MEMBERS”
20
20 IEA HIA Task 24: WIND ENERGY AND HYDROGEN INTEGRATION 57 th Ex-Co Meeting Montecatini, Italy November 2007 THANK YOU FOR YOUR ATTENTION !!!! Dr. Luis Correas Mr. Ismael Aso 57 th EXECUTIVE COMMITTEE Meeting, Repperswil
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.