GIS at Bangor Hydro February 5, 2004 Gary Duplisea Steve Severance Kris Dean
2
Bangor Hydro Summary Subsidiary of Emera Corporation 110,000 customers 5,400 sq. mile service territory 600 miles of transmission 4,571 miles of distribution Peak Load 280 MW 4 operating districts Subsidiary of Emera Corporation 110,000 customers 5,400 sq. mile service territory 600 miles of transmission 4,571 miles of distribution Peak Load 280 MW 4 operating districts Subsidiary of Emera Corporation 110,000 customers 5,400 sq. mile service territory 600 miles of transmission 4,571 miles of distribution Peak Load 280 MW 4 operating districts
3
Objectives for GIS Project Improve Customer Service Improve Employee Productivity Provide Better Facilities Information Make Information More Accessible
4
History 1993 Feasibility Study 1994 Chose Smallworld Developed Data Model & Data Collection 1994-1998 Data Collection 1995 Began Developing Applications
5
History 1994 - 1998 Field Data Collection Co-developed application with Blue Marble Utilized BM’s GeoView (Visual Basic/Access) Developed software to load into Smallworld Used internal Field Engineers and Linemen Utilized Trimble ProXL GPS for collecting meter locations
6
GIS Usage DEPARTMENTS UTIZING GIS Dispatch Field Engineers Line Department Electrical Engineering Environmental Accounting Dig Safe
7
GIS Usage DISPATCH Aid in directing crews to field locations Outage Management Service Order creation
9
GIS Usage FIELD ENGINEERS (PLANNERS) Construction plan development Customer location navigation
11
GIS Usage LINE DEPARTMENT Construction plans Service orders
12
GIS Usage ELECTRICAL ENGINEERING Load Balancing Fuse Coordination Electrical Reliability Analysis Input for Engineering Analysis Software
15
GIS Usage
16
ENVIRONMENTAL Transformers w/PCB Tracking
17
GIS Usage ACCOUNTING Asset information for tax and FERC reporting
18
GIS Usage DIG SAFE Tracking/Locating Dig Requests
19
Smallworld Overview Version Management Object Control ACE (Application Configuration Environment) Style System Topology Editor Network Tracing Object Browser
23
More Distribution
42
Alternative structure ( without working top )
43
Data transfer Select one or more replicas Select action to perform Apply
44
Application problem Work orders in separate alternatives Changes must be posted to top to be transferred to another laptop ~1600 work orders (alternatives) conflicts
45
Solution Managing time and change in Smallworld GIS, presented by Peter Batty at Smallworld ’95 geometry mapped by construction status join table links objects with work order We now have ~70 alternatives
46
Mapped Geometries Mapped geometry based on construction status Existingregular geometry Remove Placesimple geometry Not in service Remove – not in service
47
Geometries have their own style and database priority. Normal viewing ACE does not show proposed objects. Custom draw methods are used so that only objects pertaining to the current work order will be displayed.
48
OMS - PowerOn Visual Basic Interface Oracle Database Fast Access With each outage, affected customers can be easily identified. Improved flow of information between Customer Service and Dispatchers Outage Management System
49
Outage Management Process Customer reports outage to Service Center Call entered in CIS Trouble Analyzer retrieves trouble call from CIS and passes to PowerOn PowerOn uses prediction rules and electrical connectivity information to predict the device causing outage Outage project is created in PowerOn
50
PowerOn User Interface
52
Outage Properties
53
Predicted Outage Predicted Faulted device Customer that has called in with no Power
54
Business Perspective Allows for Resource Management Crew and equipment management Provides an accurate total number of customers off - helps dispatchers prioritize Provides information back to CIS Customers automatically get the correct status message based on network model Closing a project can resolve whole sets of customer outage reports Automate history and eliminate paperwork and filing
55
Questions??