Download presentation
Presentation is loading. Please wait.
Published byAdela Hill Modified over 9 years ago
1
Horizon Implementation Timeline Keith McBride
2
Horizon Implimentation Day 1 Order recieved at Zest4 Day 1 Site Survey Ordered Day 4 Site Survey Report Day 5 PSTN line ordered Day 36 Cabling & Phones Installed Day 19 Horizon Ordered Phones Despatched Day 6 SIM provided for Assured Router Despatched Day 18 PSTN line installed Assured Live Day 35 Number Porting confirmed Day 23 Day 37 Order Complete Horizon GUI Set up Number porting requested Deal Agreed! Subject to change due to conditions beyond our control
3
want to know more? Keith McBride Head of Hosted Solutions Keith.mcbride@zest4.com 07734 029800 www.Zest4.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.