Susanne Kersten, Wuppertal University November 21/22, 2013
2
Environmental Monitoring HV iseg beam Sensor cables HV cables ca. 5 m Control room CANbus cable Ethernet cable ca. 70 m DCS PC DUT + Telescope
3
Since spring 2012 HV EHS 8220n-F (8 channels, 2 kV, 4mA) EHS 8205n-F (8 channels, 500V, 10 mA) Monitoring 12 NTC for temperature measurement 2 Honeywell humidity sensors 1 four wire measurement e.g. Precise measurement of resistors PT100 etc. DCS PC Windows XP PVSS 3.8
5
Operating system must be upgraded! Windows XP not supported anymore Migration from PVSS 3.8 to WinCC 3.11 recommended. Request by users: Change the reaction to over currents currently channels are switched off ‘current source’ behaviour possible (max current is kept, voltage is reduced) possible by changing the iseg settings Improve manual e.g. restart of archiving
6
ATLAS IBL DCS uses Iseg EHS HV modules DCS monitoring crate Quality Assurance of cooling pipes Pressure transmitter Flow transmitter Active and passive current loops (4-20 mA) Based on DCS monitoring crate ATLAS testbeam setup@SLAC Copy of AIDA DCS + LV modules integrated into DCS as well MPOD modules (8 channels, 0..8V, 5A, sense wires) requires a different crate: MPOD Mini Crate Crate houses HV and LV modules spring 2014