Folded Plate Bridge: Steel Alternative for Short Span Bridges Maury Tayarani Accelerated Bridge Program MassDOT
2
Folded Plate Girder System is currently applicable to simple span bridges with lengths up to 60 ft.
3
Folded Plate Girders are fabricated using press breaks
4
The bend locations are very precisely determined
5
The fabrication process requires rotating the girder
7
1 3 2 4 Fabrication Steps are Minimal 1- Bending girders 2- End Plates
3- Minimal Tie Plates 4- Shear Studs 1 3 2 4
8
To Resolve Availability and Rapid Delivery
1- Plate thicknesses are limited to ½ or 3/8 inches 2- Total plate width is limited to 118 inches
9
Stable Shape During Casting Deck
No need for internal cross frames No need for external cross frames
10
Design is conservatively based on girders being supported at two ends, when casting deck. The actual production is based on girder sitting on prestress bed and supported continuously.
11
Open bottom allows easy inspection
12
Experimental work Concept has been extensively tested
14
7,500,000 Cycles
15
Shear Test
16
Uxbridge Project – Boston Mass
Opened to Traffic on Nov 2011
17
Folded bending – Kansas
Galvanizing – Valmont, Kansas Casting deck- Carrara- Vermont Contractor – John Rocchio Design – Highway Bridge Services Independent design check- G.F. Owner – MassDOT Bridge instrumentation – University of Mass
18
Four Folded plate with partial
Depth deck delivered to site
19
Edge girders will have the curbs
cast
20
Anchor bolts are provided to bolt
The railing onsite
21
Fabrication
22
Delivery of girders to precast
Plan for casting sub-deck
23
Girder Delivery
24
Deck Forms
25
Steel Reinforcement
26
Casting Deck
27
Unit Ready for Delivery
28
Rigging for Lift
29
Placing Girder Unit
30
Placing Girder Unit
31
Girder Ends
32
From Below
33
Finished Structure
34
Finished Roadway