Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 14, 2012 1 IRISS Cross Topic Sub-Team … … the «bridge» between all IRISS sub-teams.

Similar presentations


Presentation on theme: "March 14, 2012 1 IRISS Cross Topic Sub-Team … … the «bridge» between all IRISS sub-teams."— Presentation transcript:

1 March 14, 2012 1 IRISS Cross Topic Sub-Team … … the «bridge» between all IRISS sub-teams

2  sub-teams create fundamentally different documents in different formats (keywords, structured document, wiki)  repetitive information  open issues not tracked/resolved  documents scattered over website How to find the matching information? How to track resolved issues? March 14, 2012 2 The Challenge …

3 … the Solution by «Bridging» CMC GSO IDMP Life Cycle Labeling cross- topic One representative of each group is «cross-topic-member» Points to Consider Spreadsheet March 14, 2012 3

4 Activities ‘Key Document’: Points to Consider (PtC) Spreadsheet o provides all available ‘IRISS-information’ in tabular format with reference to ‘source documents’ o Concurrent review & updates o Handling of open issues (identification, communication, follow-up) o … March 14, 2012 4

5 Organisational Items Team building in process Meetings bimonthly (webex/telecon) – next in May 2012 Use of Collaborative Platform: MS SharePoint Foundation Current ‘hot topic’: SOP for updating the PtC March 14, 2012 5

6 Next Meeting in May - Interested to join us? Please contact: barbara.jentges@phact.ch March 14, 2012 6


Download ppt "March 14, 2012 1 IRISS Cross Topic Sub-Team … … the «bridge» between all IRISS sub-teams."

Similar presentations


Ads by Google