Alcatel-Lucent CDC Workshop, Coaching & Knowledge Transfer Project Management
2
The Project Lifecycle
3
Presales Requirements Functional Analysis & Design Technical Design & Setup Iterative Development Functional Testing Maintenance
4
Presales Phase Used to determine size of project Separate analysis phase Scope determination (requirements phase or not) Business Case validation
5
Requirements Phase All requirements are analyzed and roughly estimated Draft technical design Draft planning is drawn up (EMS)
6
Functional design & technical design Functional (Genesis) design is initiated Begin of Genesis cycle Use case definition Detailed data model
7
Iterative Development Phase Scrum Short sprints are essential Fast feedback Tight integration of development process aspects
8
Functional Testing Phase ‘uncovered’ business logic still is manual process in near future this will be integrated into Genesis With proper ‘test writing skills’ 90% coverage
9
Maintenance Phase Genesis Low maintenance cost Easy change management procedure Software factory
10
Use Case Driven Functional Analysis
11
What Defines the interactions between external actors and the system under consideration to accomplish a goal. System as a black box, what must the system do
12
How Actors Someone or something that acts on or is acted on Preconditions Conditions that must be true State of the system Normal Flow Primary scenario of the system Alternate Flow Secondary or alternative scenarios
13
Why Easy understandable by business users Clearly define context No specific language needed Track back to business requirements
14
Functional Design
15
Use Cases All functionalities of the application are described in functional use cases: Diagram Description Preconditions Normal Flow Alternate Flow Mockup
16
Diagram A use case diagram graphically describes the relationships between various use cases
17
Use Cases Description A textual description of the use case Preconditions The positive / negative requirements for the use case Normal Flow The normal behavior of the use case Alternate Flow The abnormal behavior of the use case (error conditions,...)
18
Mockup A visual screen design is added in the document Describes how the screens should look like
19
Project Methods / Processes Various agile methods available: Lean Kanban eXtreme Programming Scrum DSDM Various non agile methods available: PMBOK Prince2 LAD RUP
20
Scrum
21
What Process skeleton that includes a set of practices and predefined roles Iterative, incremental process Agile process Team based approach
22
Why Customers become part of the team Frequent intermediate deliveries with working functionality Risk mitigation, monitoring and management Transparancy Tackles rapidly changing requirements Maximizes productivity
23
How Iterative delivery Incremental delivery Customer collaboration Individuals and interaction
24
How
26
Preparation Contractual agreement Vision Initial product backlog Initial release plan Assemble team
27
Scrum Roles Stakeholders Enable the project Customers, vendors Only involved at sprint reviews Users The people for who the software is built Product Owner Voice of the customer Verifies use cases Fills the product backlog Provides scrum team with right business things
28
Scrum Roles Scrum Master Remove impediments Not the leader of the team Buffer between team and distracting influences Enforcer of rules Team Members Responsible to deliver the product Cross-functionally skilled Typically 5-9 people
29
Scrum Artefacts Product backlog High-level Broad descriptions of all required features and wish-list items “What” will be built Open and editable by anyone Managed by product owner
30
Scrum Artefacts Sprint backlog More detailed than product backlog What the team will implement in the current sprint Impediment list Problems, obstacles, unknowns,...
31
Sprint Cycle Sprint planning meeting Product owner describes highest priority tasks Team members choose from the highest priority tasks Move tasks from product backlog to sprint backlog How much can the team commit during the coming sprint Daily Scrum Same location, same time (ideally in the morning) Pigs / Chickens All team members required Others may attend to listen, but aren’t allowed to talk Status information What did you do What will you do Any impediments?
32
Sprint Cycle Sprint review Team shows what has been accomplished Demo of new features Informal meeting Checking of sprint goal Sprint retrospective What went well, not well during the sprint What improvements can be made on the next sprint
33
Scrum Process
34
Basic Ideas
35
eXtreme Programming
36
Project Dashboard: EMS The standard way: Spreadsheets Emails Phone calls Paper documents No timesheet No accurate reporting
37
Project Dashboard: EMS With EMS: Master projects All information in one place Collaboration Transparancy Structure Detailed tracking of every performed minute Detailed analysis of data Detailed reporting and follow up
38
Project Dashboard: EMS
44
How to use Task assigned after sprint planning Daily reporting using timesheet component (hours and actual progress) Issue management and follow up Benefits Easy follow up on the progress Easy coaching Strong reporting