Download presentation
1
Department of Agriculture Tamil Nadu
6th NATIONAL FOOD SECURITY MISSION EXECUTIVE COMMITTEE MEETING Department of Agriculture Tamil Nadu
2
AN OVER VIEW ON AGRICULTURE IN TAMIL NADU
3
OPERATIONAL HOLDINGS Category L. Nos Area Operated (L. Ha.)
4/22/ :42 AM OPERATIONAL HOLDINGS Category L. Nos Area Operated (L. Ha.) Marginal - Below 1 Ha. 62.277 22.864 Small - (1.0 to 2.0 Ha.) 12.341 17.208 Semi Medium (2.0 to 4.0 Ha.) 5.420 14.677 Medium - (4.0 to 10Ha.) 1.696 9.577 Large - (10 Ha.& above) 0.196 3.913 Total 81.930 68.239 3 © 2006 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.
4
LAND USE PATTERN Classification Area (L.Ha.) Forest 21.06
Barren and Uncultivable land 4.92 Land put to non-agrl. Use 21.73 Cultivable waste 3.33 Permanent pastures and other grazing lands 1.10 Misc. Tree crops and groves not included in the net area sown 2.59 Current Fallow 10.13 Other Fallow 14.98 Net Area sown 50.43 Total Geographical Area 130.27 Gross Area sown (L.Ha) 58.24
5
SOURCE WISE AREA IRRIGATED
4/22/ :42 AM SOURCE WISE AREA IRRIGATED Net Area irrigated : L. Ha. ( 58%) Net Area sown : L.Ha. 5 © 2006 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.
6
AVERAGE ANNUAL RAINFALL - 930.7 (mm)
Rainfall in mm Winter 36.8 Summer 129.7 South West Monsoon 332.8 North East Monsoon 431.4
7
Rainfall Season Normal(mm) Actual Rainfall (mm) % of Departure 2009
2010 Winter 36.8 7.7 11.5 -78.0 -67.0 Summer 129.7 129.2 126.7 0.1 -2.0 South West Monsoon 332.8 315.3 380.5 -0.1 20 North East Monsoon 431.4 482.6 567.9 11.9 31.6 Total 930.7 934.8 1086.6 0.01 16.6
8
NFSM IMPLEMENTING DISTRICTS-TAMILNADU
Inception - October 2007 NFSM Rice Five districts -Nagapattinam, Thiruvarur, Sivaganga, Ramnad and Pudukottai NFSM Pulses 12 Districts up to and all the 30 districts from
9
Anticipated expenditure
FINANCIAL STATEMENT (Rs.in Crores) Crop Appvd Plan UB as on Release Fund available Expendi-ture Anticipated expenditure Kharif Rabi Anticipated Total Rice 25.553 2.580 19.970 22.550 15.403 (60.3%) 6.582 18.870 25.452 Pulses 14.885 5.278 2.110 7.388 4.705 (31.6%) 2.301 12.484 14.785 40.438 7.858 22.080 29.938 20.108 (49.73%) 8.883 31.454 40.337
10
AUDITED UC POSITION & INTEREST ACCRUED SO FAR
The audit statement and the interest accrued particulars as on has been sent to GOI The audit for the year is nearing completion and will be submitted at the earliest.
11
NFSM RICE –ACHIVEMENT DURING 2009-10
(Rupees in Lakhs) Target Achievement
12
NFSM PULSES – ACHIEVEMENT DURING 2009-10
(Rupees in Lakhs) Target Achievement
13
NFSM RICE - PROGRESS UPTO NOV-10
Sl. No Interventions Unit Phy. Fin. (Rs. in lakhs) Remarks Tar Ach % 1 Demonstrations on System of Rice Intensification (SRI) (One Demon. Of 0.4 every 100 Ha of rice area.) Nos. 2000 100 60.00 2 Demonstrations on Hybrid Rice Technology (One dem. Of 0.4 ha at every 100 ha of Rice) 353 10.59 3 (a) Assistance for production of Hybrid Rice Seed. Qtls 1000 - 10.00 Seed setting is the major constraint. 4 (b) Assistance for Distribution of Hybrid Rice Seed. 3000 282.6 9 5.652 Cost of the seed is high & quality of the seeds are not appreciable and low market value 5 Assistance for Distribution of HYVs Seeds. 120000 111376 93 600.00 556.88 Â Will be achieved
14
NFSM RICE - PROGRESS UPTO NOV-10
Sl. No Interventions Unit Phy. Fin. (Rs. in lakhs) Remarks Tar Ach % 6 Incentive for Micro-Nutrients. Ha 50000 32731 65 250.0 62 7 a.Incentive for Conoweeder and other Farm Implements. Nos 15000 6110 41 450.0 39 Distribution under progress 8 Distribution of pumpset 4000 2490 400.0 9 Distribution of Rotovator 300 280 93 90.00 84.000 10 Distribution of Power operated conoweeder  - - 45.00 As there is a technical problem the remodification is being attempted. Hence sought for diversification to pumpset.
15
NFSM RICE - PROGRESS UPTO NOV-10
Sl. No Interventions Unit Phy. Fin. (Rs. in lakhs) Remarks Tar Ach % 11 Distribution of knap sac sprayer Nos 9000 7500 83 270.0 67.50 25 Tender approved. 12 Assistance for Plant Protection Chemical and bio-agents. Ha 25000 10610 42 125.0 53.05 13 Farmers Trainings at FFS Pattern. Nos. 200 100 34.00 14 Award for best performing Districts 1 - 5.000 Â Proposal with GOI
16
- NFSM RICE - PROGRESS UPTO NOV-10 Sl. No Interventions Unit Phy.
Fin. (Rs. in lakhs) Remarks Tar Ach % 15 Miscellaneous Expenses. (a) Project Management Team and other Miscellaneous expenses at district Level. No. of dist. - 31.800 11.384 36 (b) Project Management Team and other Miscellaneous expenses at State Level. 13.870 Â Awaiting for the approval of SFSMEC Total 60 16 Local Initiative Distribution of Power Tiller Nos 140 100 63.000 Distribution of Transplanter 50 20 40 35.000 14.000 Indent placed Distribution of Drum Seeder 80 2.000 Sub Total 77.000 77 GrandTotal
17
NFSM PULSES - PROGRESS UPTO NOV-10
Sl. No Interventions Unit Physical Financial Reasons for Low Progress/mismatch between Physical and Financial Target Achmt %Achmt % 1 Seeds: (b) Purchase of Breeder Seeds of Pulses Qtl. 200 95 48 10.46 4.98 Rabi is the major season (c) Production of Foundation Seeds 2000 1439 72 20.00 14.39 (d) Production of Certified Seeds 30000 10306 34 300.00 103.06 (e) Distribution of Certified Seeds 35000 5458 16 420.00 65.49 Organization of technology Demonstrations Ha. 3600 1893 53 72.000 31.32 44
18
Reasons for Low Progress/mismatch between Phy. and Financial
NFSM PULSES - PROGRESS UPTO NOV-10 Sl No Interventions Unit Physical Financial Reasons for Low Progress/mismatch between Phy. and Financial Target Achmt % Achmt % 1 Integrated Nutrient Management:  Tender approved. Distribution is under progress. (a) Lime/Gypsum Ha. 7200 5235 73 54.00 32.97 61 (b) Micro-nutrients 15000 5431 36 75.00 24.32 32 Assistance for Rhizobium Culture 20000 15968 80 20.00 11.55 58 2 Integrated Pest Management (IPM) 5600 2101 38 42.00 15.76 Distribution of PP Chemicals 8500 3120 37 42.50 15.60 3 Distribution of Sprinkler Sets 220 107 49 16.50 8.03 4 Distribution of Rotavators Nos. 100 52 30.00 Rate contract finalized. 5 Incentive for Pump sets 470 201 43 47.00 20.10 6 Assistance for pipes carrying water Meters 250000 140000 56 46.88 26.00 55 7 Incentive for Knap Sack Sprayers 2000 1020 51 60.00 25.12 42
19
NFSM PULSES - PROGRESS UPTO NOV-10
Sl. No Interventions Unit Physical Financial Reasons for Low Progress/mismatch between Physical and Financial Target Achmt %Achmt % 8 (i) Training on Pattern of FFS Nos. 200 152 76 34.00 25.88 (ii) State Level Trainings for Trainers 1 1.00 0.00 (iii) Award for best performing District 5.00  Proposal with GOI  9 PMT - District Level: 12 53.64 14.18 26 PMT- State Level: 6.28 Miscellaneous expenses to other districts 16 16.00 0.95 6 10 Local Initiatives (Activity-wise) (I) Distribution of tarpaulin 1200 500 42 36.00 15.00 (II)Mobile sprinkler/ Raingun 800 2 80.00 0.20 Grand total 470.50 32
20
Accelerated Pulses Production Programme (A3P) in Kharif 2010
( Rs. in L.Rs.) Sl. No Crop Districts Block No. of Units Area Covered (Ha) Amount Released Kharif Total fund utilsed for Kharif Unspent Balance 1 Red gram Vellore Kandhili, Tiruppathur 2 2370 109.32 8.495 Black Gram Thiruvannamalai Kalasapakkam & Polur 1000 54.66 52.104 2.556 Total 3 3370 163.98 11.051 Red gram – Maturity stage and yet to be harvested . Black Gram – Crop harvested. Productivity – Vamban 2 – 600 Kgs/ Ha Minikit – KU 301 – 850 Kgs/ Ha
21
Progress of Accelerated Pulses Production Programme (A3P) – RABI 2010-11
Sl. No Name of the District Season Name of the selected block Crop No of units allotted Physical (Ha) Financial (Rs. In Lakhs) Target Achievement 1 Thiruvannamalai Rabi Keelpennathur & Thiruvannamalai Black Gram 1000 54.660 27.330 2 Cuddalore Virudhachalam 1049 37.990 3 Kumaratchi 4 Villupuram Ulundurpet & Thirunavalur 1056 5 Nagapattinam Mailaduthurai Rice fallow pulses – Sowing will be Commenced in Dec -10 to Jan-11 6 Kuthalam 7 Thiruvarur Mannarkudi 8 Needamanagalam 9 Thanjavur Orathanadu 10 Thoothukudi Ottapidaram 1307 30.250 Total
22
NFSM RICE - PREPAREDNESS – RABI -2010-11
Interventions Unit Total Tar Rabi Phy target Supply tie up status Qnty. Supplied Placement Supply Agency  Total Achmt. Upto Nov ‘10 Demonstrations Demonstrations on System of Rice Intensification (SRI) (One Demon. Of 0.4 every 100 Ha of rice area.) Nos. 2000 875  - - Demonstrations on Hybrid Rice Technology (One dem. Of 0.4 ha at every 100 ha of Rice) 353 143 Support for Promotion of Hybrid Rice: (a) Assistance for production of Hybrid Rice Seed. Qtls 1000 500 500 Kg 'A' line of CORH3 produced at SSF Bavani 250 Kg of 'R' line indent placed with TNAU TNAU, Coimbatore (b) Assistance for Distribution of Hybrid Rice Seed. 3000 1210 Stock Pvt - 150 320 KSSC 282.6 Assistance for Distribution of HYVs Seeds. 120000 77410 Stock Dept Pvt Dept, & Pvt. 111376
23
Total phy Acvt. Upto Nov’10
NFSM RICE - PREPAREDNESS – RABI Interventions Unit Total Tar Rabi Tar Supply tie up status Qty supplied Placement Supply Agency  Total phy Acvt. Upto Nov’10 Incentive for Micro-Nutrients. Ha 50000 22100 MT - Zinc sulphate MT - MN Mixture ICMC Corporation Ltd., Chennai, CCL, Kudumiyanmalai & Private. 32731 a.Incentive for Conoweeder and other Farm Implements. Nos 15000 4650 - Tenderer approved. Supply in progress. 6110 Distribution of pumpset 4000 1680 1510 Rate contract finalised & supply in progress 2490 Distribution of Rotovator 300 170 280 20 Distribution of Power operated conoweeder 175 Tenderer approved. Distribution of knap sac sprayer 9000 4100  - 1500 Will be achieved 7500 Distribution of Drum Seeder 80 41 TNAU, Coimbatore
24
NFSM RICE - PREPAREDNESS – RABI -2010-11
Interventions Unit Total Tar Rabi Phy target Supply tie up status Total AcvmtNov’10 Qnty Supd Placement Supply Agency Assistance for Plant Protection Chemical and bio-agents. Ha 25000 13300 Azardiractin Lit, Chloriphriphos Lit Pseudomonous Kg Monocrotophos Lit, Triazophos Lit, Imidachloprid Lit, Profenofos Lit., Approved private agencies 10610 Farmers Trainings at FFS Pattern. Nos. 200 93 Award for best performing Districts Nos 1 Proposal with GOI Local Initiative Distribution of Power Tiller 140 70 Rate contract approved. Distribution of Transplanter 50 25 20 Distribution of Drum Seeder 80 41
25
NFSM PULSES - PREPAREDNESS – RABI -2010-11
Rabi Area Target-9.00 L.Ha. Purchase of Breeder Seed - Target Qtls. (Indent placed to TNAU) Rabi Target Qtls. Source of Supply - ICAR & TNAU. Qty supplied Qtls. The remaining qty will be supplied through Dec & Jan Production of Foundation Seed Target Qtls Rabi Target Qtls. Seed Farm Ha. Qty achieved – 1439 Qtls. Remaining Qty will be achieved during Rabi. Production of Certified Seed Target Qtls Rabi Target Qtls Seed Farm Ha. Qty achieved – Qtls . The entire quantity will be completed in Rabi Distribution of Certified Seed Target Qtls. Rabi Target Qtls Source of Supply - Department , NSC / SFC , Co operative societies. So far achvt – Rabi – Major season, Rice fallow pulses in Delta districts
26
Supply tie up status (Qty.supplied /placement and supply agency)
NFSM PULSES - PREPAREDNESS – RABI Sl. No Interventions Unit Phy Target for RABI -PHY Supply tie up status (Qty.supplied /placement and supply agency) Achmt (upto Nov’10) Target  1 Organization of technology Demonstrations Ha. 3600 1798  Tie up has been made with PACB and other agencies to provide the critical inputs 1893 2 Integrated Nutrient Management: (a) Lime/Gypsum 7200 4320 Tenderer approved. Supply in progress. 5235 (b) Micro-nutrients 15000 9000 5431  3 Assistance for Rhizobium Culture 20000 9990 15968 4 Integrated Pest Management (IPM) 5600 3360 Tender and rate contract have been finalized and distribution is in progress 2101  5 Distribution of PP Chemicals 8500 4251 3120 6 Distribution of Sprinkler Sets 220 298 107 7 Distribution of Rotavators Nos. 100 85 52 8 Incentive for Pump sets 470 276 201  9 Assistance for pipes carrying water Mtrs 250000 159600 140000
27
Tenderer approved and supply in progress
NFSM PULSES - PREPAREDNESS – RABI Sl. No. Interventions Unit Phy Target for RABI -PHY Supply tie up status (Qty.supplied / placement and supply agency) Achmt Target 10 Incentive for Knap Sack Sprayers Nos. 2000 1337  Tenderer approved and supply in progress 1020 11 (a) Extension, Training including Award to (i) Training on Pattern of FFS 200 152 (ii) State Level Trainings for Trainers 1 Local Initiatives (Activity-wise) (I) Distribution of tarpaulin 1200 Rate contract approved. 500 (II)Mobile sprinkler/ Raingun 800 2
28
NFSM & NON-NFSM RICE AREA & PRODUCTION
Area in L.Ha. Production in L.MT Base Year Area Production Non-NFSM L.Ha. L.MT NFSM 6.478 L.Ha. L.MT
29
NFSM & NON-NFSM PULSES AREA & PRODUCTION
Area in L.Ha. Production in L.MT Base Year Area Production Non-NFSM 1.824 L.Ha. 0.999 L.MT. NFSM 3.541 L.Ha. 1.906 L.MT
30
Area, Production Yield – 2007-08 TO 2009-10 PRODUCTIVITY INCREASE OR DECREASE AND REASON
Year Crop Productivity increase or decrease No. of Districts +ve over No. of Districts -ve over 0-5 % >5% >10% >20% Total districts Rice NFSM - 5 Non NFSM 1 8 4 2 16 3 12 NFSM Rice – drought -Ramnad, Sivaganga and Pudukottai and Flood during North East Monsoon - five districts – Nisha Cyclone in 4 districts – Late release of water and delay in onset of South West Monsoon – Pulled down the yield
31
APY – 2007-08 TO 2009-10 PRODUCTIVITY INCREASE OR DECREASE AND REASON
Year Crop  Districts Productivity increase or decrease NO of Districts +ve over NO of Districts -ve over 0-5 % >5% >10% >20% Total districts Pulses NFSM - 1 2 4 5 10 Non NFSM 11 15 9 3 13  -1 NFSM Pulses – – Flood damage – 2.90 L. Ha & –40000 Ha – Delay in onset of south west monsoon
32
STATUS OF CONCURRENT EVALUATION
Year Monitoring agency Date of completion of study Findings Report sent to Mission director Follow up action Base line survey conducted in all the NFSM Districts and the report sent to NFSM cell, GOI during Subsequently concurrent evaluation work was entrusted to Dept of Evaluation and Applied research (Govt of Tamilnadu undertaking ) during Collection of Primary data work as per the formats prescribed by NFSM Cell, GOI is under progress . The concurrent evaluation completion report will be sent by Feb-2010.
33
PERFORMANCE OF MINIKITS SUPPLIED DURING KHARIF
Sl. No Crop No.of minikits allocated No of minikits Received Name of verity & year of release Agency supplied Date of receipt yield of minikit variety (Kg/Ha) yield of check varieaty (Kg/Ha) Acceptance of farmer/ or decline and reason for the same 1 Rice 10605 10604 ADT45 (2001) NSC  Results awaited from the districts 2  Rice  2000  KRH (1996)  PULSES Red gram 2000 ICPL (1993) SFCI '2.7.10  Yet to be harvested  Well accepted 2 Black Gram 1000 KU-301  850  600  well accepted
34
NFSM- PMT STATUS IN THE STATE/ DISTRICTS
Crop No.of consultants sanctioned No.of consultants engaged No.of technical assistants sanctioned at district level No.of technical assistants engaged at district level If not, Reasons for not engaging the PMT State level District level Regular NFSM A3P Rice 2 5 Nil 10  NA 9 NA Appointment is in progress  State level – Awaiting for approval from SFSMEC Pulses  2 12 Nil 4 24  13 6Â
35
MONITORING STATUS BY STATE /DISTRICT LEVEL MONITORING COMMITTEE
No of visits by each committee in year Outcomes of the visits Follow up action State Level Committee 12 Progress at district level has been reviewed periodically and suitable solution given for the field problems Shortcomings identified in current year were corrected during the implementation of scheme in the next year District level Committee 24 Field visits were taken up periodically. Grievances and the requirement of the farmers were redressed at once Advance planning is being made and the decisions were taken up in advance by DFSMEC
36
POSITION OF SUBMISSION OF SUCESS STORIES
Component on which success stories submitted Number of success stories submitted Whether copy sent to Mission director SRI Demonstration 3 Yes Gypsum and other inputs Power Tiller and Pumpset 6 Farmers Field school 4 More number of success stories on various interventions is being generated and will be sent at the earliest.
37
STATUS OF ONLINE SUBMISSION OF QPR AT STATE/DISTRICT LEVEL
Crop Entry status of state report Total no of districts No of districts for which on line data submitted during Reasons for not submitting the data Rice Target entered 5 2 Online training has been conducted and it is under progress Pulses 30 17
38
CONSTRAINTS AND ACHIEVEMENTS IN IMPLEMENTING WITH SUGGESTIONS
Enhancing subsidy for distribution of Hybrid Rice seeds from Rs.20 / Kg to Rs.50/ Kg Enhancing assistance to all the machineries to 50% subsidy without any maximum ceiling for both Rice and Pulses Age relaxation for > 10 years old popular varieties – Rice and Pulses Price of the Hybrid rice seed is high – No provisions to control the price in Seed Act.
39
CONSTRAINTS AND ACHIEVEMENTS IN IMPLEMENTING WITH SUGGESTIONS
NFSM PULSES Incentive over the MSP should be absorbed by GOI Local initiative may be extended to all the pulses implementing districts Vehicle may be provided for Mission Director and second level officers Approval for 20 % Inter Componental diversion may be entrusted to State Mission Director
40
ACCELERATED PULSES PRODUCTION PROGRAMME (A3P)
41
ACCELERATED PULSES PRODUCTION PROGRAMME (A3P)
43
THANK YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.