Black Start Plan Ricson Chai ROS. Overview Introduction Black Start selection criteria. 2006 Test Criteria & RFP. Black Start Plan & new features.

Similar presentations


Presentation on theme: "Black Start Plan Ricson Chai ROS. Overview Introduction Black Start selection criteria. 2006 Test Criteria & RFP. Black Start Plan & new features."— Presentation transcript:

1 Black Start Plan Ricson Chai ROS

2 Overview Introduction Black Start selection criteria. 2006 Test Criteria & RFP. Black Start Plan & new features.

3 Introduction The Black Start capable units are able to self-start without support from outside power. Within close proximity of another power pools such as SPP, CFE, and WECC which are capable of starting from such power pool via a firm standby power supply contract can be qualified as a Black Start service.

4 Black Start Selection Criteria ERCOT uses the following selection criteria to select a set of units with minimum cost:  Simulated restoration of 90% of ERCOT peak load within 48 hours.  Expected restoration off-site power to nuclear units within 8 hours.  Proximity of Black Start units to major load centers.

5 Black Start Selection Criteria The selection criteria can be classified into two sets: 1.Group selection criteria:  Price ($/hour)  Amount of MW pickup (55,000 MW)  Restoration time (48 hours) 2.Specific unit selection criteria:  Black Start MW, next-start MW capacity, start- up time  Proximity to nuclear plant  Proximity to load centers

6 A Microsoft Access program was written to determine the best selection with fulfilling all the selection criteria in an automated fashion. The program simulates the total unit start-up time, ramp-up time, crew travel time, and next-start ramp-up time to meet the selection criteria. Each unit will be continuously starting up other units without waiting for the other units. Black Start Selection Criteria

7

8 Preferred Set Plant # 1DECKER Plant # 2ATKINS Plant # 3MCSES Plant # 4SPNCER Plant # 5STEAM Plant # 6BUCHAN Plant # 7WFCOGEN Plant # 8FLCNS Plant # 9AMISTAD Plant # 10FALCON Plant # 11RAYBURN Plant # 12SRB Plant # 13THW Plant # 14WAP Plant # 15SCSES MW Pickup55534 Restoration Time46.9 Cost$6,191,830.80 This group selection has met the first criteria but it has not met the second and third criteria, they are : Simulated restoration of 55000 MW within 48 hours.  Expected restoration off-site power to nuclear units within 8 hours.  Proximity of Black Start units to major load centers. Black Start Selection Criteria

9

10 Two Black Start plants closest to the Comanche Peak are Decordova and Lake Creek. PlantBlack Start MWNext-Start MWHot Start-up TimeCold Start-up Time Decordova708180.5 Lake Creek23087213 Black Start Selection Criteria

11 Initial SelectionFinal Selection Plant # 1DECKER Plant # 2ATKINS Plant # 3MCSES Plant # 4SPNCER Plant # 5STEAM Plant # 6BUCHAN Plant # 7WFCOGEN Plant # 8FLCNS Plant # 9AMISTAD Plant # 10FALCON Plant # 11RAYBURN Plant # 12SRB Plant # 13THW Plant # 14WAP Plant # 15SCSES Plant # 16 DCSES MW Pickup5553455174 Restoration Time46.943.9 Cost$6,191,830.80$6,936,430.80 Black Start Selection Criteria

12

13 Test Criteria  Basic Start-up Test  Line Energizing Test  Load Carrying Test  Start-up the largest motor at the next-start plant or simulate the scenario. (2006) 2006 Test Criteria & RFP

14 Black Start Plan & New Features Secondary Transmission Corridor one- line diagrams. Breaker numbers for switching sequence. A list of updated alternative synch scopes.

15 Black Start Plan & New Features Go to 2005 Black Start Plan

16 Questions ? ? ? ?


Download ppt "Black Start Plan Ricson Chai ROS. Overview Introduction Black Start selection criteria. 2006 Test Criteria & RFP. Black Start Plan & new features."