Download presentation
Presentation is loading. Please wait.
Published byAleesha Lyons Modified over 9 years ago
1
Government of Rajasthan INITIATIVE ON Governance Reforms, Transparency & AccountabilityGovernance Reforms, Transparency & Accountability
2
Scope of Presentation Streamlining of processes Work Execution at Site Wage Payment Material Procurement Technical and Accounts manual ICT enabled processes
3
Streamlining Work Execution at Site Mate deployment mechanism – Selection, Empanelment, Training, I- card, Rotation, Mate Dairy clubbed with worksite booklet. Deployment of Labour in Groups (Max. 5 people) & Group Measurement System Staggering of Muster Roll – Issuance of MR on different dates. Streamlining of Processes
4
Mate Identity Card
5
Mate Diary
6
Group Card
7
Streamlining of Wage Payment Revolving fund for Payment Agency - Advance payment to Post Offices/ Cooperative Banks by DPC - A decentralized solution for timely payments Separation of backend process of Payment Agency for Payments. Close Co-ordination with Authorities of Postal, Co-operative Banks & Other Banks.
8
Streamlining of Material Procurement Rate fixation for cluster of Panchayats NREGA Standing Committee – Involvement of Stakeholders : Sarpancha, Ward Panchas, etc. Transparency and Accountability, Financial Discipline, Accountability of Government officials
9
Accounts Manual: akin to GF & AR for Panchayats Technical Manual (MGNREGA Karya Nirdeshika): Guidelines of technical specifications for execution of works Guidelines for Administrative Expenditure Guidelines for e-MR implementation Grievance Redressal Manual & Rules Guidelines/Manuals at State level
10
Special Computer Lab with proper sitting arrangement, now developed at BNRGSK Solar Power Back-up for 12 hours for 4 computers at block and 2 at GP Muster Roll Movement Chart fixed on its wall Daily Monitoring System NREGA Computer Lab Bharat Nirman Rajiv Gandhi Sewa Kendra
11
S.NoMilestone/DescriptionBlock LevelGP level 1Total No. of Center2499168 2Work Sanctioned2489125 3Work in Progress2478019 4Works to be Completed Up to 02/10/2010 Up to 31/12/2010 Up to 31/03/2011 107 192 248 1676 4749 9168 BNRGSK – Progress so far
14
e-Muster Roll & Muster Roll tracking – Track MRs in real time, fix accountability, simple & efficient record keeping, timely wage payments, eliminate discretion of Mates & maintain 100 days limit. Wage list, Fortnightly Reports, UCs & Expenditure status are prepared by the system End-to-End ICT Enablement of NREGS MoU between GoR & NIC/NICSI EoI floated by NIC, 27 Companies participated. Statewide Call Centre of NREGS – Helpdesk cum Information and Monitoring System and Implementation through a Call Centre using Voice, IVRS, Internet, Email, WAP Enabled Mobile phones ICT Initiative
15
Old v/s New Muster Roll
16
Old v/s New Wage List
17
Pre - populated e-Muster Roll
18
e MR at the Stage of Payment
19
e-MR feeding after work
20
System generated Wage List
21
THANK YOU
22
5 important questions pertaining to overall improvement in NREGA implementation narrowed down : How to track MRs in real time? How to fix accountability of JTAs? How to make record keeping simpler & more efficient? How to ensure timely wage payments? How to eliminate discretion enjoyed by Mates? A thorough study of the existing system revealed the value of e-MRs in addressing all five questions.
23
Master Data created of all job cards, postal/bank accounts & sanctioned works Names of workers pre-populated in the MR Ended Mates’ discretion in entering names No more allegations against Mates of discrimination No more problem of unfilled MRs Completed MRs fed into the computer 100 days limit maintained by the system Wage list prepared by the system All records mandated by the Act & Rules maintained by the system Fortnightly Reports prepared by the system UCs prepared by the system Expenditure status maintained by the system Control Registers created for pre & post e-MR issue
24
MR proforma in the website improved to suit local needs: Mate signature space added Measurement space added Pass Order space added Inspection entries space created Age of labourers & registration no. added Control Registers, pre-issue of MRs & at the end of the fortnight, evolved & partly populated by the system MR Pendency Alert created System of interest calculation for delay by concerned JTAs System of Fund Utilisation Certificate generation created
25
Features: Formats with timeline of each step prepared at 2 levels : ▪Field level: maintained by GRS ▪Panchayat Samiti level: maintained by Acctts.Asstt/Data Entry Operators Advantages: Inbuilt Accountability of government servants at all levels When clubbed with e-MR system ▪calculation of interest payable by erring official ▪allows for generation of Exception Report Ensures strict supervision and monitoring
26
Registration of workers Demand & allotment of work Attendance (Biometric & GPS enabled) Measurement of Work (GPS & Photo) Wage list finalization & uploading Accessibility of information to stakeholders Grievance Redressal Stores & Inventory Management Real time & online GIS based MIS Technical assistance to Payment Agency for ensuring the timely payment of wages
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.